Last update at: 2023-05-31T15:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_006 | Active | Planned | Production unavailability | 2023-05-31T15:15:31+01:00 | 2024-05-17T22:00:00+01:00 | 2024-06-09T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008164_003 | Inactive | Planned | Production unavailability | 2023-05-31T13:02:32+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008165_003 | Inactive | Planned | Consumption unavailability | 2023-05-31T13:02:32+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008166_003 | Inactive | Planned | Production unavailability | 2023-05-31T13:02:32+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008167_003 | Inactive | Planned | Consumption unavailability | 2023-05-31T13:02:32+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008148_003 | Inactive | Planned | Production unavailability | 2023-05-31T07:02:32+01:00 | 2023-05-26T12:30:00+01:00 | 2023-05-31T05:59:00+01:00 | MW | 80 | 60 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008162_002 | Inactive | Planned | Production unavailability | 2023-05-30T17:32:31+01:00 | 2023-05-30T09:30:00+01:00 | 2023-05-30T16:30:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008167_002 | Dismissed | Planned | Consumption unavailability | 2023-05-30T16:26:06+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008166_002 | Dismissed | Planned | Production unavailability | 2023-05-30T16:25:47+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008165_002 | Dismissed | Planned | Consumption unavailability | 2023-05-30T16:25:12+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008164_002 | Dismissed | Planned | Production unavailability | 2023-05-30T16:24:47+01:00 | 2023-05-31T10:00:00+01:00 | 2023-05-31T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008167_001 | Dismissed | Planned | Consumption unavailability | 2023-05-30T15:29:40+01:00 | 2023-06-01T10:00:00+01:00 | 2023-06-01T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008166_001 | Dismissed | Planned | Production unavailability | 2023-05-30T15:28:01+01:00 | 2023-06-01T10:00:00+01:00 | 2023-06-01T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008165_001 | Dismissed | Planned | Consumption unavailability | 2023-05-30T15:26:48+01:00 | 2023-06-01T10:00:00+01:00 | 2023-06-01T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008164_001 | Dismissed | Planned | Production unavailability | 2023-05-30T15:25:51+01:00 | 2023-06-01T10:00:00+01:00 | 2023-06-01T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Grid |
Hydro Pumped Storage | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008163_002 | Dismissed | Planned | Production unavailability | 2023-05-30T11:14:28+01:00 | 2023-05-30T10:30:00+01:00 | 2023-05-30T11:00:00+01:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008163_001 | Dismissed | Planned | Production unavailability | 2023-05-30T10:27:42+01:00 | 2023-05-30T10:30:00+01:00 | 2023-05-30T11:00:00+01:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008162_001 | Dismissed | Planned | Production unavailability | 2023-05-30T09:20:59+01:00 | 2023-05-30T09:30:00+01:00 | 2023-05-30T16:30:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008161_001 | Active | Planned | Production unavailability | 2023-05-29T16:06:45+01:00 | 2024-05-25T08:00:00+01:00 | 2024-05-31T16:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008160_001 | Active | Planned | Production unavailability | 2023-05-29T16:04:29+01:00 | 2024-05-25T08:00:00+01:00 | 2024-05-31T16:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008159_003 | Inactive | Planned | Consumption unavailability | 2023-05-29T10:02:31+01:00 | 2023-05-28T15:15:00+01:00 | 2023-05-29T09:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008159_002 | Dismissed | Planned | Consumption unavailability | 2023-05-28T22:30:19+01:00 | 2023-05-28T15:15:00+01:00 | 2023-05-29T09:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008159_001 | Dismissed | Planned | Consumption unavailability | 2023-05-28T15:05:24+01:00 | 2023-05-28T15:15:00+01:00 | 2023-05-28T23:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_008 | Inactive | Unplanned | Production unavailability | 2023-05-28T13:32:32+01:00 | 2023-05-16T10:56:00+01:00 | 2023-05-28T12:29:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008157_005 | Inactive | Planned | Consumption unavailability | 2023-05-28T08:32:32+01:00 | 2023-05-27T16:00:00+01:00 | 2023-05-28T07:30:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008157_004 | Dismissed | Planned | Consumption unavailability | 2023-05-28T07:22:50+01:00 | 2023-05-27T16:00:00+01:00 | 2023-05-28T07:30:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008158_004 | Inactive | Planned | Consumption unavailability | 2023-05-28T02:02:32+01:00 | 2023-05-27T18:30:00+01:00 | 2023-05-28T01:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008157_003 | Dismissed | Planned | Consumption unavailability | 2023-05-27T22:43:51+01:00 | 2023-05-27T16:00:00+01:00 | 2023-05-28T11:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008157_002 | Dismissed | Planned | Consumption unavailability | 2023-05-27T16:44:37+01:00 | 2023-05-27T16:00:00+01:00 | 2023-05-28T03:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008158_003 | Dismissed | Planned | Consumption unavailability | 2023-05-27T16:43:45+01:00 | 2023-05-27T18:30:00+01:00 | 2023-05-28T01:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008158_002 | Dismissed | Planned | Consumption unavailability | 2023-05-27T13:25:41+01:00 | 2023-05-27T18:00:00+01:00 | 2023-05-27T22:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008158_001 | Dismissed | Planned | Consumption unavailability | 2023-05-27T11:44:45+01:00 | 2023-05-27T15:00:00+01:00 | 2023-05-27T22:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008157_001 | Dismissed | Planned | Consumption unavailability | 2023-05-27T11:43:45+01:00 | 2023-05-27T16:00:00+01:00 | 2023-05-27T22:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_008 | Inactive | Planned | Production unavailability | 2023-05-26T14:02:32+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-26T12:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008143_006 | Inactive | Planned | Production unavailability | 2023-05-26T14:02:32+01:00 | 2023-05-21T12:01:00+01:00 | 2023-05-26T12:59:00+01:00 | MW | 100 | 40 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008126_008 | Inactive | Unplanned | Production unavailability | 2023-05-26T13:32:32+01:00 | 2023-05-16T12:29:00+01:00 | 2023-05-26T12:29:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_010 | Active | Planned | Production unavailability | 2023-05-26T09:29:42+01:00 | 2023-05-26T13:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008128_007 | Dismissed | Planned | Production unavailability | 2023-05-26T09:29:08+01:00 | 2023-05-16T13:20:00+01:00 | 2023-05-26T12:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008148_002 | Dismissed | Planned | Production unavailability | 2023-05-26T09:22:23+01:00 | 2023-05-26T12:30:00+01:00 | 2023-05-31T05:59:00+01:00 | MW | 80 | 60 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008143_005 | Dismissed | Planned | Production unavailability | 2023-05-26T09:21:06+01:00 | 2023-05-21T12:01:00+01:00 | 2023-05-26T12:59:00+01:00 | MW | 100 | 40 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008127_007 | Dismissed | Unplanned | Production unavailability | 2023-05-26T09:15:21+01:00 | 2023-05-16T10:56:00+01:00 | 2023-05-28T12:29:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_011 | Active | Planned | Production unavailability | 2023-05-26T09:13:37+01:00 | 2023-05-26T12:30:00+01:00 | 2023-06-16T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008126_007 | Dismissed | Unplanned | Production unavailability | 2023-05-26T09:12:41+01:00 | 2023-05-16T12:29:00+01:00 | 2023-05-26T12:29:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007983_003 | Dismissed | Planned | Production unavailability | 2023-05-25T09:55:38+01:00 | 2023-10-22T08:00:00+01:00 | 2023-10-31T18:00:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007982_003 | Dismissed | Planned | Production unavailability | 2023-05-25T09:53:49+01:00 | 2023-10-22T08:00:00+01:00 | 2023-10-31T18:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008153_002 | Active | Planned | Production unavailability | 2023-05-25T09:00:06+01:00 | 2023-10-31T16:00:00+00:00 | 2023-10-31T20:00:00+00:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008154_002 | Active | Planned | Production unavailability | 2023-05-25T08:58:44+01:00 | 2023-10-31T16:00:00+00:00 | 2023-10-31T20:00:00+00:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008155_002 | Active | Planned | Production unavailability | 2023-05-25T08:57:04+01:00 | 2023-10-31T16:00:00+00:00 | 2023-10-31T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008156_002 | Active | Planned | Production unavailability | 2023-05-25T08:52:40+01:00 | 2023-10-31T16:00:00+00:00 | 2023-10-31T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007982_002 | Dismissed | Planned | Production unavailability | 2023-05-25T08:44:28+01:00 | 2023-10-22T08:00:00+01:00 | 2023-10-31T18:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |