Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 4 5 6 7 8 > | ||||||||||||||||||
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000004830_001 | Dismissed | Planned | Production unavailability | 2019-11-20T13:19:31+00:00 | 2023-10-27T00:00:00+01:00 | 2023-10-29T00:00:00+01:00 | MW | 755 | 0 | 755 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000004831_001 | Dismissed | Planned | Production unavailability | 2019-11-20T13:21:31+00:00 | 2024-01-26T00:00:00+00:00 | 2024-01-28T00:00:00+00:00 | MW | 755 | 0 | 755 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000004865_001 | Dismissed | Planned | Production unavailability | 2019-12-03T17:08:43+00:00 | 2022-12-08T23:00:00+00:00 | 2022-12-12T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000003402_008 | Dismissed | Planned | Production unavailability | 2019-12-12T11:36:07+00:00 | 2021-04-09T23:00:00+01:00 | 2021-05-04T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000004874_001 | Dismissed | Planned | Production unavailability | 2019-12-12T11:41:38+00:00 | 2023-05-12T23:00:00+01:00 | 2023-07-11T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000004875_001 | Dismissed | Planned | Production unavailability | 2019-12-12T11:43:38+00:00 | 2023-09-15T23:00:00+01:00 | 2023-11-01T23:00:00+00:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004895_001 | Dismissed | Planned | Production unavailability | 2019-12-17T09:10:20+00:00 | 2020-10-03T00:00:00+01:00 | 2020-10-24T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004896_001 | Dismissed | Planned | Production unavailability | 2019-12-17T09:11:11+00:00 | 2021-10-02T00:00:00+01:00 | 2021-10-09T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004897_001 | Dismissed | Planned | Production unavailability | 2019-12-17T09:11:53+00:00 | 2022-06-04T00:00:00+01:00 | 2022-07-23T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004896_002 | Dismissed | Planned | Production unavailability | 2019-12-17T09:14:14+00:00 | 2021-09-18T00:00:00+01:00 | 2021-09-25T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004897_002 | Dismissed | Planned | Production unavailability | 2019-12-17T09:14:51+00:00 | 2022-06-18T00:00:00+01:00 | 2022-08-06T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TB1 | 47W000000000207R | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004900_001 | Dismissed | Planned | Production unavailability | 2019-12-17T09:19:20+00:00 | 2021-05-24T00:00:00+01:00 | 2021-05-31T00:00:00+01:00 | MW | 54 | 0 | 54 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB2 | 47W000000000208P | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004901_001 | Dismissed | Planned | Production unavailability | 2019-12-17T09:20:28+00:00 | 2021-05-24T00:00:00+01:00 | 2021-05-31T00:00:00+01:00 | MW | 54 | 0 | 54 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB3 | 47W0000000000994 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004902_001 | Dismissed | Planned | Production unavailability | 2019-12-17T09:21:16+00:00 | 2021-06-04T00:00:00+01:00 | 2021-06-11T00:00:00+01:00 | MW | 241 | 0 | 241 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000004911_005 | Dismissed | Planned | Production unavailability | 2019-12-24T22:34:33+00:00 | 2019-12-18T23:00:00+00:00 | 2020-12-24T22:40:00+00:00 | MW | 370 | 340 | 710 | Failure | Plant Fault - Generator |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000004911_006 | Dismissed | Planned | Production unavailability | 2019-12-27T12:18:32+00:00 | 2019-12-18T23:00:00+00:00 | 2020-12-24T22:40:00+00:00 | MW | 370 | 340 | 710 | Failure | Plant Fault - Generator |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000004082_002 | Dismissed | Planned | Production unavailability | 2020-01-07T13:27:05+00:00 | 2022-03-03T23:00:00+00:00 | 2022-03-07T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Operational Activities |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000003513_006 | Dismissed | Planned | Production unavailability | 2020-01-07T13:28:21+00:00 | 2020-12-03T23:00:00+00:00 | 2020-12-07T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000003880_006 | Dismissed | Planned | Production unavailability | 2020-01-07T13:30:12+00:00 | 2021-09-02T23:00:00+01:00 | 2021-09-06T06:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000004012_003 | Dismissed | Planned | Production unavailability | 2020-01-07T13:31:37+00:00 | 2021-12-02T23:00:00+00:00 | 2021-12-06T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000003815_006 | Dismissed | Planned | Production unavailability | 2020-01-15T16:35:24+00:00 | 2021-04-15T23:00:00+01:00 | 2021-06-15T23:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000002962_009 | Dismissed | Planned | Production unavailability | 2020-01-20T10:35:38+00:00 | 2021-07-16T00:00:00+01:00 | 2021-08-06T00:00:00+01:00 | MW | 755 | 0 | 755 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000004829_002 | Dismissed | Planned | Production unavailability | 2020-01-20T10:36:58+00:00 | 2023-05-20T00:00:00+01:00 | 2023-06-20T00:00:00+01:00 | MW | 755 | 0 | 755 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000004828_002 | Dismissed | Planned | Production unavailability | 2020-01-20T10:42:51+00:00 | 2023-04-28T00:00:00+01:00 | 2023-04-30T00:00:00+01:00 | MW | 755 | 0 | 755 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004895_002 | Dismissed | Planned | Production unavailability | 2020-01-27T10:41:46+00:00 | 2020-09-28T00:00:00+01:00 | 2020-10-26T00:00:00+00:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000004362_002 | Dismissed | Planned | Production unavailability | 2020-01-28T10:19:44+00:00 | 2022-06-10T23:00:00+01:00 | 2022-06-20T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000003401_008 | Dismissed | Planned | Production unavailability | 2020-01-28T14:14:35+00:00 | 2020-12-07T23:00:00+00:00 | 2020-12-21T23:00:00+00:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000003401_009 | Dismissed | Planned | Production unavailability | 2020-01-28T14:32:45+00:00 | 2020-12-04T23:00:00+00:00 | 2020-12-18T23:00:00+00:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000005021_001 | Dismissed | Planned | Production unavailability | 2020-02-09T15:03:46+00:00 | 2023-03-02T23:00:00+00:00 | 2023-03-06T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_FIDL-2 | 48W000000FIDL-24 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000003625_006 | Dismissed | Planned | Production unavailability | 2020-02-17T15:02:03+00:00 | 2020-03-18T15:00:00+00:00 | 2050-12-31T23:59:59+00:00 | MW | 485 | 0 | 485 | Shutdown | Planned Outage |
Fossil Hard coal | 10YGB----------A |
T_FIDL-3 | 48W000000FIDL-32 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000003626_006 | Dismissed | Planned | Production unavailability | 2020-02-17T15:03:53+00:00 | 2020-03-18T15:00:00+00:00 | 2050-12-31T23:59:59+00:00 | MW | 485 | 0 | 485 | Shutdown | Planned Outage |
Fossil Hard coal | 10YGB----------A |
T_FIDL-4 | 48W000000FIDL-40 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000003627_006 | Dismissed | Planned | Production unavailability | 2020-02-17T15:05:20+00:00 | 2020-03-18T15:00:00+00:00 | 2050-12-31T23:59:59+00:00 | MW | 506 | 0 | 506 | Shutdown | Planned Outage |
Fossil Hard coal | 10YGB----------A |
T_FIDL-2 | 48W000000FIDL-24 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000003625_007 | Dismissed | Planned | Production unavailability | 2020-02-21T11:27:25+00:00 | 2020-03-31T23:59:00+01:00 | 2050-12-31T23:59:59+00:00 | MW | 485 | 0 | 485 | Shutdown | Planned Outage |
Fossil Hard coal | 10YGB----------A |
T_FIDL-3 | 48W000000FIDL-32 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000003626_007 | Dismissed | Planned | Production unavailability | 2020-02-21T11:28:15+00:00 | 2020-03-31T23:59:00+01:00 | 2050-12-31T23:59:59+00:00 | MW | 485 | 0 | 485 | Shutdown | Planned Outage |
Fossil Hard coal | 10YGB----------A |
T_FIDL-4 | 48W000000FIDL-40 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000003627_007 | Dismissed | Planned | Production unavailability | 2020-02-21T11:29:07+00:00 | 2020-03-31T23:59:00+01:00 | 2050-12-31T23:59:59+00:00 | MW | 506 | 0 | 506 | Shutdown | Planned Outage |
Fossil Hard coal | 10YGB----------A |
T_FIDL-4 | 48W000000FIDL-40 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000003627_008 | Dismissed | Planned | Production unavailability | 2020-02-21T11:29:26+00:00 | 2020-03-31T23:59:00+01:00 | 2050-12-31T23:59:59+00:00 | MW | 506 | 0 | 506 | Shutdown | Planned Outage |
Fossil Hard coal | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000004828_003 | Dismissed | Planned | Production unavailability | 2020-03-30T15:15:41+01:00 | 2023-04-28T00:00:00+01:00 | 2023-04-30T00:00:00+01:00 | MW | 755 | 0 | 755 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
TB2 | 47W000000000208P | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004901_002 | Dismissed | Planned | Production unavailability | 2020-03-31T11:23:08+01:00 | 2021-04-02T00:00:00+01:00 | 2021-04-03T00:00:00+01:00 | MW | 54 | 0 | 54 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB1 | 47W000000000207R | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004900_002 | Dismissed | Planned | Production unavailability | 2020-03-31T11:25:51+01:00 | 2021-04-06T00:00:00+01:00 | 2021-04-09T00:00:00+01:00 | MW | 54 | 0 | 54 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB1 | 47W000000000207R | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005099_001 | Dismissed | Planned | Production unavailability | 2020-03-31T11:29:13+01:00 | 2021-05-15T00:00:00+01:00 | 2021-05-22T00:00:00+01:00 | MW | 54 | 0 | 54 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB2 | 47W000000000208P | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005100_001 | Dismissed | Planned | Production unavailability | 2020-03-31T11:30:42+01:00 | 2021-05-15T00:00:00+01:00 | 2021-05-22T00:00:00+01:00 | MW | 54 | 0 | 54 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB2 | 47W000000000208P | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004901_003 | Dismissed | Planned | Production unavailability | 2020-03-31T11:32:45+01:00 | 2021-04-02T08:00:00+01:00 | 2021-04-03T17:00:00+01:00 | MW | 54 | 0 | 54 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB1 | 47W000000000207R | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005101_001 | Dismissed | Planned | Production unavailability | 2020-03-31T11:40:40+01:00 | 2022-05-04T00:00:00+01:00 | 2022-05-06T00:00:00+01:00 | MW | 54 | 0 | 54 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB2 | 47W000000000208P | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005102_001 | Dismissed | Planned | Production unavailability | 2020-03-31T11:42:03+01:00 | 2022-05-04T00:00:00+01:00 | 2022-05-06T00:00:00+01:00 | MW | 54 | 0 | 54 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB3 | 47W0000000000994 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004902_002 | Dismissed | Planned | Production unavailability | 2020-03-31T12:58:40+01:00 | 2021-06-12T00:00:00+01:00 | 2021-06-19T00:00:00+01:00 | MW | 241 | 0 | 241 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB3 | 47W0000000000994 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005104_001 | Dismissed | Planned | Production unavailability | 2020-03-31T13:04:22+01:00 | 2022-07-05T00:00:00+01:00 | 2022-07-07T00:00:00+01:00 | MW | 241 | 0 | 241 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005105_001 | Dismissed | Planned | Production unavailability | 2020-03-31T13:06:57+01:00 | 2021-08-09T00:00:00+01:00 | 2021-08-10T00:00:00+01:00 | MW | 241 | 2 | 243 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005105_002 | Dismissed | Planned | Production unavailability | 2020-04-17T10:15:22+01:00 | 2021-08-09T00:00:00+01:00 | 2021-08-10T00:00:00+01:00 | MW | 243 | 0 | 243 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000003815_007 | Dismissed | Planned | Production unavailability | 2020-04-30T15:54:19+01:00 | 2021-06-04T00:01:00+01:00 | 2021-08-14T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000005136_001 | Dismissed | Planned | Production unavailability | 2020-05-01T09:07:51+01:00 | 2023-06-09T23:00:00+01:00 | 2023-06-27T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |