Last update at: 2024-07-26T12:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 3 4 5 6 7 > | ||||||||||||||||||
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009207_003 | Dismissed | Planned | Production unavailability | 2024-07-11T09:05:49+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T18:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009207_002 | Dismissed | Planned | Production unavailability | 2024-07-05T09:20:40+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T17:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009207_001 | Dismissed | Planned | Production unavailability | 2024-07-03T08:01:09+01:00 | 2024-07-08T18:00:00+01:00 | 2024-07-11T17:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_014 | Inactive | Planned | Production unavailability | 2024-07-13T10:02:32+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-13T09:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_013 | Dismissed | Planned | Production unavailability | 2024-07-12T17:00:56+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-13T09:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_012 | Dismissed | Planned | Production unavailability | 2024-07-12T15:26:28+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T18:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_011 | Dismissed | Planned | Production unavailability | 2024-07-12T13:11:45+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_010 | Dismissed | Planned | Production unavailability | 2024-07-12T10:25:32+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T14:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_009 | Dismissed | Planned | Production unavailability | 2024-07-12T08:59:43+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T12:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_008 | Dismissed | Planned | Production unavailability | 2024-07-12T08:29:39+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T11:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_007 | Dismissed | Planned | Production unavailability | 2024-07-12T00:53:24+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T09:30:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_006 | Dismissed | Planned | Production unavailability | 2024-07-11T20:43:45+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T12:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_005 | Dismissed | Planned | Production unavailability | 2024-07-11T17:35:47+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T21:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_004 | Dismissed | Planned | Production unavailability | 2024-07-11T17:31:12+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T20:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_003 | Dismissed | Planned | Production unavailability | 2024-07-11T09:05:00+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T18:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_002 | Dismissed | Planned | Production unavailability | 2024-07-05T09:19:47+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T17:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009206_001 | Dismissed | Planned | Production unavailability | 2024-07-03T07:59:53+01:00 | 2024-07-08T18:00:00+01:00 | 2024-07-11T17:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_014 | Inactive | Planned | Production unavailability | 2024-07-13T10:02:32+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-13T09:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_013 | Dismissed | Planned | Production unavailability | 2024-07-12T17:00:12+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-13T09:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_012 | Dismissed | Planned | Production unavailability | 2024-07-12T15:26:45+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T18:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_011 | Dismissed | Planned | Production unavailability | 2024-07-12T13:12:05+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_010 | Dismissed | Planned | Production unavailability | 2024-07-12T10:26:28+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T14:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_009 | Dismissed | Planned | Production unavailability | 2024-07-12T09:00:00+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T12:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_008 | Dismissed | Planned | Production unavailability | 2024-07-12T08:30:07+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T11:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_007 | Dismissed | Planned | Production unavailability | 2024-07-12T00:53:05+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T09:30:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_006 | Dismissed | Planned | Production unavailability | 2024-07-11T20:44:22+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-12T12:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_005 | Dismissed | Planned | Production unavailability | 2024-07-11T17:34:19+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T21:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_004 | Dismissed | Planned | Production unavailability | 2024-07-11T17:31:53+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T20:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_003 | Dismissed | Planned | Production unavailability | 2024-07-11T09:03:59+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T18:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_002 | Dismissed | Planned | Production unavailability | 2024-07-05T09:18:43+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-11T17:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009205_001 | Dismissed | Planned | Production unavailability | 2024-07-03T07:58:49+01:00 | 2024-07-08T18:00:00+01:00 | 2024-07-11T17:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009204_003 | Inactive | Unplanned | Production unavailability | 2024-07-03T17:32:32+01:00 | 2024-07-03T07:56:00+01:00 | 2024-07-03T16:20:00+01:00 | MW | 580 | 600 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009204_002 | Dismissed | Unplanned | Production unavailability | 2024-07-03T14:09:21+01:00 | 2024-07-03T07:56:00+01:00 | 2024-07-03T16:20:00+01:00 | MW | 580 | 600 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009204_001 | Dismissed | Unplanned | Production unavailability | 2024-07-03T07:57:24+01:00 | 2024-07-03T07:56:00+01:00 | 2024-07-03T14:33:00+01:00 | MW | 980 | 200 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009203_002 | Inactive | Unplanned | Production unavailability | 2024-07-03T08:32:32+01:00 | 2024-07-03T06:27:00+01:00 | 2024-07-03T07:30:00+01:00 | MW | 1180 | 0 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009203_001 | Dismissed | Unplanned | Production unavailability | 2024-07-03T06:40:47+01:00 | 2024-07-03T06:27:00+01:00 | 2024-07-03T07:30:00+01:00 | MW | 1180 | 0 | 1180 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_008 | Dismissed | Planned | Production unavailability | 2024-07-23T13:42:46+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-23T13:44:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_007 | Dismissed | Planned | Production unavailability | 2024-07-19T10:32:08+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-26T17:00:00+01:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_006 | Dismissed | Planned | Production unavailability | 2024-07-16T10:52:02+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_005 | Dismissed | Planned | Production unavailability | 2024-07-15T16:06:08+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_004 | Dismissed | Planned | Production unavailability | 2024-07-12T08:58:34+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-15T17:00:00+01:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_003 | Dismissed | Planned | Production unavailability | 2024-07-05T11:23:01+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-12T16:30:00+01:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_002 | Dismissed | Planned | Production unavailability | 2024-07-04T11:06:09+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-05T16:30:00+01:00 | MW | 79 | 78 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_001 | Dismissed | Planned | Production unavailability | 2024-07-02T08:28:24+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-05T16:30:00+01:00 | MW | 79 | 78 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009200_003 | Inactive | Planned | Consumption unavailability | 2024-07-02T07:32:32+01:00 | 2024-07-02T04:15:00+01:00 | 2024-07-02T06:30:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009200_002 | Dismissed | Planned | Consumption unavailability | 2024-07-02T06:15:39+01:00 | 2024-07-02T04:15:00+01:00 | 2024-07-02T06:30:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009200_001 | Dismissed | Planned | Consumption unavailability | 2024-07-02T03:45:16+01:00 | 2024-07-02T04:15:00+01:00 | 2024-07-02T10:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009199_002 | Inactive | Planned | Production unavailability | 2024-07-03T00:02:32+01:00 | 2024-06-30T01:00:00+01:00 | 2024-07-02T23:00:00+01:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009199_001 | Dismissed | Planned | Production unavailability | 2024-06-30T00:40:47+01:00 | 2024-06-30T01:00:00+01:00 | 2024-07-02T23:00:00+01:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000009198_002 | Inactive | Unplanned | Production unavailability | 2024-06-28T18:02:32+01:00 | 2024-06-28T14:40:00+01:00 | 2024-06-28T17:00:00+01:00 | MW | 52 | 0 | 52 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10Y1001A1001A59C |