Last update at: 2021-02-25T23:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 2 3 4 5 6 > | ||||||||||||||||||
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_004 | Dismissed | Planned | Production unavailability | 2016-11-21T10:31:26+00:00 | 2019-06-07T23:00:00+01:00 | 2019-07-05T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_005 | Dismissed | Planned | Production unavailability | 2017-07-20T15:35:56+01:00 | 2019-06-07T23:00:00+01:00 | 2019-07-05T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_006 | Dismissed | Planned | Production unavailability | 2017-11-17T09:15:07+00:00 | 2019-06-07T23:00:00+01:00 | 2019-07-05T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_007 | Dismissed | Planned | Production unavailability | 2017-11-17T09:22:09+00:00 | 2019-06-07T23:00:00+01:00 | 2019-07-05T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_008 | Dismissed | Planned | Production unavailability | 2018-03-02T12:12:35+00:00 | 2019-06-07T23:00:00+01:00 | 2019-07-05T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_009 | Dismissed | Planned | Production unavailability | 2018-07-16T14:22:42+01:00 | 2019-06-07T23:00:00+01:00 | 2019-07-05T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_010 | Dismissed | Planned | Production unavailability | 2018-10-26T09:02:15+01:00 | 2019-06-07T23:00:00+01:00 | 2019-07-05T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_011 | Dismissed | Planned | Production unavailability | 2019-01-25T14:04:04+00:00 | 2019-06-07T23:00:00+01:00 | 2019-07-05T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_012 | Dismissed | Planned | Production unavailability | 2019-04-29T12:30:31+01:00 | 2019-06-06T23:00:00+01:00 | 2019-07-04T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_013 | Dismissed | Planned | Production unavailability | 2019-07-04T10:45:44+01:00 | 2019-06-06T23:00:00+01:00 | 2019-07-06T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_014 | Dismissed | Planned | Production unavailability | 2019-07-06T08:39:37+01:00 | 2019-06-06T23:00:00+01:00 | 2019-07-07T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_015 | Dismissed | Planned | Production unavailability | 2019-07-06T18:21:03+01:00 | 2019-06-06T23:00:00+01:00 | 2019-07-07T08:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002814_016 | Inactive | Planned | Production unavailability | 2019-07-07T09:02:31+01:00 | 2019-06-06T23:00:00+01:00 | 2019-07-07T08:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000002844_001 | Dismissed | Planned | Production unavailability | 2016-09-13T12:56:01+01:00 | 2019-09-02T08:00:00+01:00 | 2019-09-27T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000002844_002 | Dismissed | Planned | Production unavailability | 2017-07-20T15:42:25+01:00 | 2019-09-02T08:00:00+01:00 | 2019-09-27T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000002844_003 | Dismissed | Planned | Production unavailability | 2017-11-17T09:14:32+00:00 | 2019-09-02T08:00:00+01:00 | 2019-09-27T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000002844_004 | Dismissed | Planned | Production unavailability | 2017-11-17T09:21:19+00:00 | 2019-09-02T08:00:00+01:00 | 2019-09-27T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000002844_005 | Dismissed | Planned | Production unavailability | 2018-03-02T12:09:30+00:00 | 2019-09-02T08:00:00+01:00 | 2019-09-27T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000002844_006 | Dismissed | Planned | Production unavailability | 2018-07-16T14:22:18+01:00 | 2019-09-02T08:00:00+01:00 | 2019-09-27T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000002844_007 | Dismissed | Planned | Production unavailability | 2018-09-14T12:10:25+01:00 | 2019-09-02T08:00:00+01:00 | 2019-09-13T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000002844_008 | Dismissed | Planned | Production unavailability | 2018-10-26T09:01:56+01:00 | 2019-09-02T08:00:00+01:00 | 2019-09-13T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000002844_009 | Dismissed | Planned | Production unavailability | 2019-02-12T12:19:11+00:00 | 2019-09-02T08:00:00+01:00 | 2019-09-13T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_001 | Dismissed | Planned | Production unavailability | 2016-09-13T12:57:12+01:00 | 2019-09-16T08:00:00+01:00 | 2019-10-11T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_002 | Dismissed | Planned | Production unavailability | 2016-10-17T14:18:01+01:00 | 2019-09-16T08:00:00+01:00 | 2019-10-11T18:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_003 | Dismissed | Planned | Production unavailability | 2016-10-17T14:23:00+01:00 | 2019-09-16T08:00:00+01:00 | 2019-10-11T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_004 | Dismissed | Planned | Production unavailability | 2017-07-20T15:42:08+01:00 | 2019-09-16T08:00:00+01:00 | 2019-10-11T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_005 | Dismissed | Planned | Production unavailability | 2017-11-17T09:14:32+00:00 | 2019-09-16T08:00:00+01:00 | 2019-10-11T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_006 | Dismissed | Planned | Production unavailability | 2017-11-17T09:21:19+00:00 | 2019-09-16T08:00:00+01:00 | 2019-10-11T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_007 | Dismissed | Planned | Production unavailability | 2018-03-02T12:09:30+00:00 | 2019-09-16T08:00:00+01:00 | 2019-10-11T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_008 | Dismissed | Planned | Production unavailability | 2018-07-16T14:22:18+01:00 | 2019-09-16T08:00:00+01:00 | 2019-10-11T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_009 | Dismissed | Planned | Production unavailability | 2018-09-14T12:11:22+01:00 | 2019-09-02T08:00:00+01:00 | 2019-10-25T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_010 | Dismissed | Planned | Production unavailability | 2018-10-26T09:01:56+01:00 | 2019-09-02T08:00:00+01:00 | 2019-10-25T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000002845_011 | Dismissed | Planned | Production unavailability | 2019-02-12T12:18:53+00:00 | 2019-09-02T08:00:00+01:00 | 2019-10-25T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_001 | Dismissed | Planned | Production unavailability | 2016-11-02T12:09:25+00:00 | 2017-05-08T23:01:00+01:00 | 2019-12-02T00:00:00+00:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_002 | Dismissed | Planned | Production unavailability | 2016-11-15T15:05:28+00:00 | 2017-05-08T23:01:00+01:00 | 2018-09-16T22:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_003 | Dismissed | Planned | Production unavailability | 2017-03-23T14:50:31+00:00 | 2017-05-08T23:01:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_004 | Dismissed | Planned | Production unavailability | 2017-05-05T11:53:58+01:00 | 2017-05-05T23:00:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_005 | Dismissed | Planned | Production unavailability | 2017-05-05T21:30:08+01:00 | 2017-05-06T23:00:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_006 | Dismissed | Planned | Production unavailability | 2017-05-06T11:29:56+01:00 | 2017-05-06T23:59:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_007 | Dismissed | Planned | Production unavailability | 2017-05-06T22:38:28+01:00 | 2017-05-06T22:59:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_008 | Dismissed | Planned | Production unavailability | 2017-05-06T23:46:12+01:00 | 2017-05-07T01:30:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_009 | Dismissed | Planned | Production unavailability | 2017-05-07T02:02:31+01:00 | 2017-05-07T02:30:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_010 | Dismissed | Planned | Production unavailability | 2017-05-07T02:43:44+01:00 | 2017-05-07T03:30:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_011 | Dismissed | Planned | Production unavailability | 2017-05-07T03:36:39+01:00 | 2017-05-07T04:00:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_012 | Dismissed | Planned | Production unavailability | 2017-05-07T04:01:38+01:00 | 2017-05-07T04:30:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000002940_013 | Dismissed | Planned | Production unavailability | 2017-05-07T04:18:55+01:00 | 2017-05-07T04:20:00+01:00 | 2018-03-31T23:59:00+01:00 | MW | 800 | 380 | 1180 | Shutdown | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002944_001 | Dismissed | Planned | Production unavailability | 2016-11-07T12:42:39+00:00 | 2019-12-05T23:00:00+00:00 | 2019-12-09T06:00:00+00:00 | MW | 700 | 0 | 700 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002944_002 | Dismissed | Planned | Production unavailability | 2016-11-21T08:49:57+00:00 | 2019-12-05T23:00:00+00:00 | 2019-12-09T06:00:00+00:00 | MW | 700 | 10 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002944_003 | Dismissed | Planned | Production unavailability | 2016-11-21T10:32:02+00:00 | 2019-12-05T23:00:00+00:00 | 2019-12-09T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000002944_004 | Dismissed | Planned | Production unavailability | 2017-07-20T15:35:34+01:00 | 2019-12-05T23:00:00+00:00 | 2019-12-09T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |