Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008955_003 Dismissed Planned Production unavailability 2024-03-22T11:46:50+00:00 2024-03-22T10:30:00+00:00 2024-03-22T11:30:00+00:00 MW 10 0 10 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008955_002 Dismissed Planned Production unavailability 2024-03-22T11:10:29+00:00 2024-03-22T10:30:00+00:00 2024-03-22T11:30:00+00:00 MW 10 0 10 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008955_001 Dismissed Planned Production unavailability 2024-03-22T10:24:43+00:00 2024-03-22T10:30:00+00:00 2024-03-22T11:00:00+00:00 MW 10 0 10 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008915_002 Dismissed Planned Production unavailability 2024-03-06T17:00:02+00:00 2024-03-06T16:30:00+00:00 2024-03-06T17:00:00+00:00 MW 10 0 10 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008915_001 Dismissed Planned Production unavailability 2024-03-06T16:27:55+00:00 2024-03-06T16:30:00+00:00 2024-03-06T17:00:00+00:00 MW 10 0 10 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008880_003 Dismissed Planned Production unavailability 2024-02-26T15:27:37+00:00 2024-02-26T09:40:00+00:00 2024-02-26T15:00:00+00:00 MW 10 0 10 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008880_002 Dismissed Planned Production unavailability 2024-02-26T10:19:17+00:00 2024-02-26T09:40:00+00:00 2024-02-26T15:00:00+00:00 MW 10 0 10 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008880_001 Dismissed Planned Production unavailability 2024-02-26T09:38:02+00:00 2024-02-26T09:40:00+00:00 2024-02-26T10:00:00+00:00 MW 10 0 10 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008852_002 Dismissed Planned Production unavailability 2024-02-15T16:30:32+00:00 2024-02-15T15:31:00+00:00 2024-02-15T15:51:00+00:00 MW 10 0 10 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008852_001 Dismissed Planned Production unavailability 2024-02-15T15:32:03+00:00 2024-02-15T15:31:00+00:00 2024-02-15T15:51:00+00:00 MW 10 0 10 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008851_002 Dismissed Planned Production unavailability 2024-02-15T15:39:56+00:00 2024-02-15T15:10:00+00:00 2024-02-15T15:30:00+00:00 MW 0 0 0 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008851_001 Dismissed Planned Production unavailability 2024-02-15T15:10:53+00:00 2024-02-15T15:10:00+00:00 2024-02-15T15:30:00+00:00 MW 0 0 0 Foreseen Maintenance
Commissioning
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000008944_001 Active Planned Production unavailability 2024-03-19T09:12:05+00:00 2024-06-12T08:00:00+01:00 2024-06-12T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-2 48W00000STLGW-2C
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000008943_001 Active Planned Production unavailability 2024-03-19T09:10:59+00:00 2024-06-12T08:00:00+01:00 2024-06-12T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000008942_001 Active Planned Production unavailability 2024-03-19T09:10:02+00:00 2024-06-12T08:00:00+01:00 2024-06-12T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-2 48W00000STLGW-2C
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000008941_001 Active Planned Production unavailability 2024-03-19T09:08:23+00:00 2024-06-10T08:00:00+01:00 2024-06-11T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000008940_001 Active Planned Production unavailability 2024-03-19T09:06:18+00:00 2024-06-10T08:00:00+01:00 2024-06-11T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000008267_003 Inactive Planned Production unavailability 2023-07-26T17:02:32+01:00 2023-07-26T10:00:00+01:00 2023-07-26T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000008267_002 Dismissed Planned Production unavailability 2023-07-24T15:01:20+01:00 2023-07-26T10:00:00+01:00 2023-07-26T16:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000008267_001 Dismissed Planned Production unavailability 2023-07-24T09:29:48+01:00 2023-07-26T10:00:00+01:00 2023-07-26T18:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000007955_002 Dismissed Planned Production unavailability 2023-02-15T16:13:54+00:00 2023-02-15T16:10:00+00:00 2023-02-15T17:10:00+00:00 MW 108 0 108 Foreseen Maintenance
Testing
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000007955_001 Dismissed Planned Production unavailability 2023-02-15T16:05:51+00:00 2023-02-15T16:10:00+00:00 2023-02-15T17:10:00+00:00 MW 108 0 108 Foreseen Maintenance
Testing
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000007848_005 Inactive Planned Production unavailability 2023-01-16T17:02:32+00:00 2023-01-16T13:29:00+00:00 2023-01-16T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Testing
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000007848_004 Dismissed Planned Production unavailability 2023-01-16T15:02:20+00:00 2023-01-16T13:29:00+00:00 2023-01-16T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Testing
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000007848_003 Dismissed Planned Production unavailability 2023-01-16T14:56:16+00:00 2023-01-16T13:29:00+00:00 2023-01-16T15:30:00+00:00 MW 108 0 108 Foreseen Maintenance
Testing
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000007848_001 Dismissed Planned Production unavailability 2023-01-16T13:30:01+00:00 2023-01-16T13:29:00+00:00 2023-01-16T15:30:00+00:00 MW 108 0 108 Foreseen Maintenance
Testing
Wind Onshore 10YGB----------A
T_GRGBW-3 48W00000GRGBW-3R
SSE_GROUP
48X0000000000319 0000000000000000000007919_005 Dismissed Unplanned Production unavailability 2023-02-13T16:56:14+00:00 2023-01-26T11:55:00+00:00 2023-03-26T20:00:00+01:00 MW 165 0 165 Failure
Plant Fault - Electrical Equipment
Wind Offshore 10YGB----------A
T_GRGBW-3 48W00000GRGBW-3R
SSE_GROUP
48X0000000000319 0000000000000000000007919_004 Dismissed Unplanned Production unavailability 2023-01-30T10:51:28+00:00 2023-01-26T11:55:00+00:00 2023-03-26T20:00:00+01:00 MW 165 0 165 Failure
Plant Fault - Electrical Equipment
Wind Offshore 10YGB----------A
T_GRGBW-3 48W00000GRGBW-3R
SSE_GROUP
48X0000000000319 0000000000000000000007919_003 Dismissed Unplanned Production unavailability 2023-01-27T17:56:23+00:00 2023-01-26T11:55:00+00:00 2023-02-03T20:00:00+00:00 MW 165 0 165 Failure
Plant Fault - Electrical Equipment
Wind Offshore 10YGB----------A
T_GRGBW-3 48W00000GRGBW-3R
SSE_GROUP
48X0000000000319 0000000000000000000007919_002 Dismissed Unplanned Production unavailability 2023-01-26T13:08:14+00:00 2023-01-26T11:55:00+00:00 2023-01-27T20:00:00+00:00 MW 165 0 165 Failure
Plant Fault - Electrical Equipment
Wind Offshore 10YGB----------A
T_GRGBW-3 48W00000GRGBW-3R
SSE_GROUP
48X0000000000319 0000000000000000000007919_001 Dismissed Unplanned Production unavailability 2023-01-26T11:59:58+00:00 2023-01-26T11:55:00+00:00 2023-01-26T23:59:00+00:00 MW 165 0 165 Failure
Plant Fault - Electrical Equipment
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
SSE_GROUP
48X0000000000319 0000000000000000000007697_003 Dismissed Planned Production unavailability 2022-11-09T15:27:02+00:00 2022-11-21T08:00:00+00:00 2022-12-02T17:00:00+00:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
SSE_GROUP
48X0000000000319 0000000000000000000007696_003 Dismissed Planned Production unavailability 2022-11-09T15:26:24+00:00 2022-11-21T08:00:00+00:00 2022-12-02T17:00:00+00:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
SSE_GROUP
48X0000000000319 0000000000000000000007697_001 Dismissed Planned Production unavailability 2022-11-02T15:07:50+00:00 2022-11-21T08:00:00+00:00 2022-12-02T17:00:00+00:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
SSE_GROUP
48X0000000000319 0000000000000000000007696_001 Dismissed Planned Production unavailability 2022-11-02T15:06:31+00:00 2022-11-21T08:00:00+00:00 2022-12-02T17:00:00+00:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
SSE_GROUP
48X0000000000319 0000000000000000000007716_002 Dismissed Planned Production unavailability 2022-11-09T15:26:05+00:00 2030-01-01T00:00:00+00:00 2030-01-01T00:03:00+00:00 MW 126 0 126 Foreseen Maintenance
Testing
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
SSE_GROUP
48X0000000000319 0000000000000000000007648_002 Inactive Planned Production unavailability 2022-10-23T01:02:32+01:00 2022-10-20T00:00:00+01:00 2022-10-23T00:00:00+01:00 MW 2 124 126 Failure
Plant Fault - Auxiliary Equipment
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
SSE_GROUP
48X0000000000319 0000000000000000000007648_001 Dismissed Planned Production unavailability 2022-10-13T16:05:43+01:00 2022-10-20T00:00:00+01:00 2022-10-23T00:00:00+01:00 MW 2 124 126 Failure
Plant Fault - Auxiliary Equipment
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
SSE_GROUP
48X0000000000319 0000000000000000000007551_005 Inactive Planned Production unavailability 2022-09-22T14:32:33+01:00 2022-09-21T08:00:00+01:00 2022-09-22T13:30:00+01:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
SSE_GROUP
48X0000000000319 0000000000000000000007552_005 Inactive Planned Production unavailability 2022-09-22T14:32:33+01:00 2022-09-21T08:00:00+01:00 2022-09-22T13:30:00+01:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
SSE_GROUP
48X0000000000319 0000000000000000000007551_004 Dismissed Planned Production unavailability 2022-09-22T12:50:39+01:00 2022-09-21T08:00:00+01:00 2022-09-22T13:30:00+01:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
SSE_GROUP
48X0000000000319 0000000000000000000007552_004 Dismissed Planned Production unavailability 2022-09-22T12:49:51+01:00 2022-09-21T08:00:00+01:00 2022-09-22T13:30:00+01:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
SSE_GROUP
48X0000000000319 0000000000000000000007551_003 Dismissed Planned Production unavailability 2022-09-16T10:46:26+01:00 2022-09-21T08:00:00+01:00 2022-09-22T18:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
SSE_GROUP
48X0000000000319 0000000000000000000007552_003 Dismissed Planned Production unavailability 2022-09-16T10:46:52+01:00 2022-09-21T08:00:00+01:00 2022-09-22T18:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
SSE_GROUP
48X0000000000319 0000000000000000000007552_002 Dismissed Planned Production unavailability 2022-09-13T10:32:30+01:00 2022-09-19T08:00:00+01:00 2022-09-21T18:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
SSE_GROUP
48X0000000000319 0000000000000000000007551_002 Dismissed Planned Production unavailability 2022-09-13T10:32:00+01:00 2022-09-19T08:00:00+01:00 2022-09-21T18:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
SSE_GROUP
48X0000000000319 0000000000000000000007551_001 Dismissed Planned Production unavailability 2022-09-02T10:01:02+01:00 2022-09-15T08:00:00+01:00 2022-09-19T18:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
SSE_GROUP
48X0000000000319 0000000000000000000007552_001 Dismissed Planned Production unavailability 2022-09-02T10:02:28+01:00 2022-09-15T08:00:00+01:00 2022-09-19T18:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
SSE_GROUP
48X0000000000319 0000000000000000000007554_002 Dismissed Planned Production unavailability 2022-09-13T10:44:04+01:00 2022-09-20T08:00:00+01:00 2022-09-30T18:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
SSE_GROUP
48X0000000000319 0000000000000000000007554_001 Dismissed Planned Production unavailability 2022-09-02T10:05:04+01:00 2022-09-20T08:00:00+01:00 2022-09-30T18:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A