| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 1 2 3 4 5 > | ||||||||||||||||||
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_007 | Inactive | Planned | Production unavailability | 2024-11-22T18:02:35+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-22T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_006 | Dismissed | Planned | Production unavailability | 2024-11-15T10:42:04+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-22T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_005 | Dismissed | Planned | Production unavailability | 2024-11-08T10:49:21+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-15T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_004 | Dismissed | Planned | Production unavailability | 2024-11-04T14:22:05+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-08T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_003 | Dismissed | Planned | Production unavailability | 2024-11-01T11:20:09+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-08T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_002 | Dismissed | Planned | Production unavailability | 2024-10-25T10:58:20+00:00 | 2024-10-18T12:18:00+00:00 | 2024-11-01T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009559_001 | Dismissed | Planned | Production unavailability | 2024-10-22T12:16:33+00:00 | 2024-10-18T12:18:00+00:00 | 2024-10-25T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_007 | Inactive | Planned | Production unavailability | 2024-10-18T18:02:32+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-18T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_006 | Dismissed | Planned | Production unavailability | 2024-10-11T14:00:14+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-18T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_005 | Dismissed | Planned | Production unavailability | 2024-10-04T11:31:54+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-11T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_004 | Dismissed | Planned | Production unavailability | 2024-10-03T12:19:37+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-04T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_003 | Dismissed | Planned | Production unavailability | 2024-09-27T12:35:26+00:00 | 2024-09-20T23:00:00+00:00 | 2024-10-04T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_002 | Dismissed | Planned | Production unavailability | 2024-09-20T13:58:44+00:00 | 2024-09-20T23:00:00+00:00 | 2024-09-27T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009454_001 | Dismissed | Planned | Production unavailability | 2024-09-20T10:49:52+00:00 | 2024-09-20T20:00:00+00:00 | 2024-09-27T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_008 | Inactive | Planned | Production unavailability | 2024-09-20T09:02:32+00:00 | 2024-08-09T11:29:00+00:00 | 2024-09-20T08:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_007 | Dismissed | Planned | Production unavailability | 2024-09-20T07:57:21+00:00 | 2024-08-09T11:29:00+00:00 | 2024-09-20T08:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_006 | Dismissed | Planned | Production unavailability | 2024-09-13T15:43:46+00:00 | 2024-08-09T11:29:00+00:00 | 2024-09-20T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_005 | Dismissed | Planned | Production unavailability | 2024-09-06T09:51:34+00:00 | 2024-08-09T11:29:00+00:00 | 2024-09-13T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_004 | Dismissed | Planned | Production unavailability | 2024-08-22T10:34:07+00:00 | 2024-08-09T11:29:00+00:00 | 2024-09-06T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_003 | Dismissed | Planned | Production unavailability | 2024-08-16T10:41:23+00:00 | 2024-08-09T11:29:00+00:00 | 2024-08-23T17:00:00+00:00 | MW | 13 | 26 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_002 | Dismissed | Planned | Production unavailability | 2024-08-16T10:41:08+00:00 | 2024-08-09T11:29:00+00:00 | 2024-08-16T17:00:00+00:00 | MW | 13 | 26 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009332_001 | Dismissed | Planned | Production unavailability | 2024-08-09T11:30:12+00:00 | 2024-08-09T11:29:00+00:00 | 2024-08-16T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009278_004 | Inactive | Planned | Production unavailability | 2024-08-09T18:02:32+00:00 | 2024-07-24T17:00:00+00:00 | 2024-08-09T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009278_003 | Dismissed | Planned | Production unavailability | 2024-08-02T10:38:39+00:00 | 2024-07-24T17:00:00+00:00 | 2024-08-09T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009278_002 | Dismissed | Planned | Production unavailability | 2024-07-29T15:13:55+00:00 | 2024-07-24T17:00:00+00:00 | 2024-08-02T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009278_001 | Dismissed | Planned | Production unavailability | 2024-07-25T17:05:49+00:00 | 2024-07-24T17:00:00+00:00 | 2024-07-29T17:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009255_003 | Inactive | Planned | Production unavailability | 2024-07-19T10:17:32+00:00 | 2024-07-17T00:00:00+00:00 | 2024-07-19T09:07:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009255_002 | Dismissed | Planned | Production unavailability | 2024-07-19T08:30:15+00:00 | 2024-07-17T00:00:00+00:00 | 2024-07-19T09:07:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009255_001 | Dismissed | Planned | Production unavailability | 2024-07-18T09:22:35+00:00 | 2024-07-17T00:00:00+00:00 | 2024-07-25T00:00:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009218_002 | Dismissed | Planned | Production unavailability | 2024-07-04T10:54:01+00:00 | 2024-07-04T10:55:00+00:00 | 2024-07-04T11:00:00+00:00 | MW | 5 | 34 | 39 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009218_001 | Dismissed | Planned | Production unavailability | 2024-07-04T10:50:11+00:00 | 2024-07-04T10:55:00+00:00 | 2024-07-04T11:00:00+00:00 | MW | 5 | 34 | 39 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_011 | Inactive | Planned | Production unavailability | 2024-06-16T17:02:32+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-16T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_010 | Dismissed | Planned | Production unavailability | 2024-06-14T08:46:40+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-16T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_009 | Dismissed | Planned | Production unavailability | 2024-06-07T10:34:19+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-14T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_008 | Dismissed | Planned | Production unavailability | 2024-05-31T11:21:21+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-07T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_007 | Dismissed | Planned | Production unavailability | 2024-05-28T13:07:42+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-31T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_006 | Dismissed | Planned | Production unavailability | 2024-05-27T18:18:29+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-28T21:31:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_005 | Dismissed | Planned | Production unavailability | 2024-05-27T18:18:04+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-28T00:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_004 | Dismissed | Planned | Production unavailability | 2024-05-24T15:30:02+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-27T18:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_003 | Dismissed | Planned | Production unavailability | 2024-05-24T15:29:43+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-27T18:00:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_002 | Dismissed | Planned | Production unavailability | 2024-05-24T13:41:57+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-07T18:30:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_001 | Dismissed | Planned | Production unavailability | 2024-05-22T13:19:21+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-24T18:30:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| Coomacheo | 47W0000000002784 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010292_006 | Inactive | Planned | Production unavailability | 2025-07-05T16:17:31+00:00 | 2025-06-30T07:30:00+00:00 | 2025-07-05T15:11:00+00:00 | MW | 59 | 0 | 59 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Coomacheo | 47W0000000002784 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010292_005 | Dismissed | Planned | Production unavailability | 2025-07-05T15:09:47+00:00 | 2025-06-30T07:30:00+00:00 | 2025-07-05T15:11:00+00:00 | MW | 59 | 0 | 59 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Coomacheo | 47W0000000002784 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010292_004 | Dismissed | Planned | Production unavailability | 2025-07-05T15:03:20+00:00 | 2025-06-30T07:30:00+00:00 | 2025-07-05T16:00:00+00:00 | MW | 59 | 0 | 59 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Coomacheo | 47W0000000002784 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010292_003 | Dismissed | Planned | Production unavailability | 2025-07-04T14:54:39+00:00 | 2025-06-30T07:30:00+00:00 | 2025-07-05T15:00:00+00:00 | MW | 59 | 0 | 59 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Coomacheo | 47W0000000002784 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010292_002 | Dismissed | Planned | Production unavailability | 2025-06-24T12:37:34+00:00 | 2025-06-30T07:30:00+00:00 | 2025-07-05T17:00:00+00:00 | MW | 59 | 0 | 59 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Coomacheo | 47W0000000002784 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010292_001 | Dismissed | Planned | Production unavailability | 2025-06-16T09:38:09+00:00 | 2025-06-30T08:00:00+00:00 | 2025-07-05T17:00:00+00:00 | MW | 59 | 0 | 59 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| Coomacheo | 47W0000000002784 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009188_002 | Inactive | Planned | Production unavailability | 2024-07-20T17:02:32+00:00 | 2024-07-15T08:00:00+00:00 | 2024-07-20T16:00:00+00:00 | MW | 59 | 0 | 59 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Coomacheo | 47W0000000002784 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009188_001 | Dismissed | Planned | Production unavailability | 2024-06-26T14:17:17+00:00 | 2024-07-15T08:00:00+00:00 | 2024-07-20T16:00:00+00:00 | MW | 59 | 0 | 59 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |