SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-12-10T11:00:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_007 Inactive Planned Production unavailability 2024-11-22T18:02:35+00:00 2024-10-18T12:18:00+00:00 2024-11-22T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_006 Dismissed Planned Production unavailability 2024-11-15T10:42:04+00:00 2024-10-18T12:18:00+00:00 2024-11-22T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_005 Dismissed Planned Production unavailability 2024-11-08T10:49:21+00:00 2024-10-18T12:18:00+00:00 2024-11-15T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_004 Dismissed Planned Production unavailability 2024-11-04T14:22:05+00:00 2024-10-18T12:18:00+00:00 2024-11-08T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_003 Dismissed Planned Production unavailability 2024-11-01T11:20:09+00:00 2024-10-18T12:18:00+00:00 2024-11-08T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_002 Dismissed Planned Production unavailability 2024-10-25T10:58:20+00:00 2024-10-18T12:18:00+00:00 2024-11-01T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009559_001 Dismissed Planned Production unavailability 2024-10-22T12:16:33+00:00 2024-10-18T12:18:00+00:00 2024-10-25T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_007 Inactive Planned Production unavailability 2024-10-18T18:02:32+00:00 2024-09-20T23:00:00+00:00 2024-10-18T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_006 Dismissed Planned Production unavailability 2024-10-11T14:00:14+00:00 2024-09-20T23:00:00+00:00 2024-10-18T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_005 Dismissed Planned Production unavailability 2024-10-04T11:31:54+00:00 2024-09-20T23:00:00+00:00 2024-10-11T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_004 Dismissed Planned Production unavailability 2024-10-03T12:19:37+00:00 2024-09-20T23:00:00+00:00 2024-10-04T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_003 Dismissed Planned Production unavailability 2024-09-27T12:35:26+00:00 2024-09-20T23:00:00+00:00 2024-10-04T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_002 Dismissed Planned Production unavailability 2024-09-20T13:58:44+00:00 2024-09-20T23:00:00+00:00 2024-09-27T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009454_001 Dismissed Planned Production unavailability 2024-09-20T10:49:52+00:00 2024-09-20T20:00:00+00:00 2024-09-27T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_008 Inactive Planned Production unavailability 2024-09-20T09:02:32+00:00 2024-08-09T11:29:00+00:00 2024-09-20T08:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_007 Dismissed Planned Production unavailability 2024-09-20T07:57:21+00:00 2024-08-09T11:29:00+00:00 2024-09-20T08:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_006 Dismissed Planned Production unavailability 2024-09-13T15:43:46+00:00 2024-08-09T11:29:00+00:00 2024-09-20T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_005 Dismissed Planned Production unavailability 2024-09-06T09:51:34+00:00 2024-08-09T11:29:00+00:00 2024-09-13T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_004 Dismissed Planned Production unavailability 2024-08-22T10:34:07+00:00 2024-08-09T11:29:00+00:00 2024-09-06T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_003 Dismissed Planned Production unavailability 2024-08-16T10:41:23+00:00 2024-08-09T11:29:00+00:00 2024-08-23T17:00:00+00:00 MW 13 26 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_002 Dismissed Planned Production unavailability 2024-08-16T10:41:08+00:00 2024-08-09T11:29:00+00:00 2024-08-16T17:00:00+00:00 MW 13 26 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009332_001 Dismissed Planned Production unavailability 2024-08-09T11:30:12+00:00 2024-08-09T11:29:00+00:00 2024-08-16T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009278_004 Inactive Planned Production unavailability 2024-08-09T18:02:32+00:00 2024-07-24T17:00:00+00:00 2024-08-09T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009278_003 Dismissed Planned Production unavailability 2024-08-02T10:38:39+00:00 2024-07-24T17:00:00+00:00 2024-08-09T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009278_002 Dismissed Planned Production unavailability 2024-07-29T15:13:55+00:00 2024-07-24T17:00:00+00:00 2024-08-02T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009278_001 Dismissed Planned Production unavailability 2024-07-25T17:05:49+00:00 2024-07-24T17:00:00+00:00 2024-07-29T17:00:00+00:00 MW 39 0 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009255_003 Inactive Planned Production unavailability 2024-07-19T10:17:32+00:00 2024-07-17T00:00:00+00:00 2024-07-19T09:07:00+00:00 MW 0 39 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009255_002 Dismissed Planned Production unavailability 2024-07-19T08:30:15+00:00 2024-07-17T00:00:00+00:00 2024-07-19T09:07:00+00:00 MW 0 39 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009255_001 Dismissed Planned Production unavailability 2024-07-18T09:22:35+00:00 2024-07-17T00:00:00+00:00 2024-07-25T00:00:00+00:00 MW 0 39 39 Shutdown
Commissioning
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009218_002 Dismissed Planned Production unavailability 2024-07-04T10:54:01+00:00 2024-07-04T10:55:00+00:00 2024-07-04T11:00:00+00:00 MW 5 34 39 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009218_001 Dismissed Planned Production unavailability 2024-07-04T10:50:11+00:00 2024-07-04T10:55:00+00:00 2024-07-04T11:00:00+00:00 MW 5 34 39 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_011 Inactive Planned Production unavailability 2024-06-16T17:02:32+00:00 2024-05-22T13:00:00+00:00 2024-06-16T16:00:00+00:00 MW 39 0 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_010 Dismissed Planned Production unavailability 2024-06-14T08:46:40+00:00 2024-05-22T13:00:00+00:00 2024-06-16T16:00:00+00:00 MW 39 0 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_009 Dismissed Planned Production unavailability 2024-06-07T10:34:19+00:00 2024-05-22T13:00:00+00:00 2024-06-14T16:00:00+00:00 MW 39 0 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_008 Dismissed Planned Production unavailability 2024-05-31T11:21:21+00:00 2024-05-22T13:00:00+00:00 2024-06-07T16:00:00+00:00 MW 39 0 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_007 Dismissed Planned Production unavailability 2024-05-28T13:07:42+00:00 2024-05-22T13:00:00+00:00 2024-05-31T16:00:00+00:00 MW 39 0 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_006 Dismissed Planned Production unavailability 2024-05-27T18:18:29+00:00 2024-05-22T13:00:00+00:00 2024-05-28T21:31:00+00:00 MW 39 0 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_005 Dismissed Planned Production unavailability 2024-05-27T18:18:04+00:00 2024-05-22T13:00:00+00:00 2024-05-28T00:00:00+00:00 MW 39 0 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_004 Dismissed Planned Production unavailability 2024-05-24T15:30:02+00:00 2024-05-22T13:00:00+00:00 2024-05-27T18:00:00+00:00 MW 39 0 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_003 Dismissed Planned Production unavailability 2024-05-24T15:29:43+00:00 2024-05-22T13:00:00+00:00 2024-05-27T18:00:00+00:00 MW 0 39 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_002 Dismissed Planned Production unavailability 2024-05-24T13:41:57+00:00 2024-05-22T13:00:00+00:00 2024-06-07T18:30:00+00:00 MW 0 39 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009102_001 Dismissed Planned Production unavailability 2024-05-22T13:19:21+00:00 2024-05-22T13:00:00+00:00 2024-05-24T18:30:00+00:00 MW 39 0 39 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010292_006 Inactive Planned Production unavailability 2025-07-05T16:17:31+00:00 2025-06-30T07:30:00+00:00 2025-07-05T15:11:00+00:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010292_005 Dismissed Planned Production unavailability 2025-07-05T15:09:47+00:00 2025-06-30T07:30:00+00:00 2025-07-05T15:11:00+00:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010292_004 Dismissed Planned Production unavailability 2025-07-05T15:03:20+00:00 2025-06-30T07:30:00+00:00 2025-07-05T16:00:00+00:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010292_003 Dismissed Planned Production unavailability 2025-07-04T14:54:39+00:00 2025-06-30T07:30:00+00:00 2025-07-05T15:00:00+00:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010292_002 Dismissed Planned Production unavailability 2025-06-24T12:37:34+00:00 2025-06-30T07:30:00+00:00 2025-07-05T17:00:00+00:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010292_001 Dismissed Planned Production unavailability 2025-06-16T09:38:09+00:00 2025-06-30T08:00:00+00:00 2025-07-05T17:00:00+00:00 MW 59 0 59 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000009188_002 Inactive Planned Production unavailability 2024-07-20T17:02:32+00:00 2024-07-15T08:00:00+00:00 2024-07-20T16:00:00+00:00 MW 59 0 59 Foreseen Maintenance
Grid
Wind Onshore 10Y1001A1001A59C
Coomacheo 47W0000000002784
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000009188_001 Dismissed Planned Production unavailability 2024-06-26T14:17:17+00:00 2024-07-15T08:00:00+00:00 2024-07-20T16:00:00+00:00 MW 59 0 59 Foreseen Maintenance
Grid
Wind Onshore 10Y1001A1001A59C