Last update at: 2023-09-26T18:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005312_002 Dismissed Unplanned Production unavailability 2020-09-26T18:56:07+01:00 2020-09-26T18:00:00+01:00 2020-09-27T12:00:00+01:00 MW 150 0 150 Failure
Plant Fault - Electrical Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005313_002 Dismissed Unplanned Consumption unavailability 2020-09-26T18:55:39+01:00 2020-09-26T18:00:00+01:00 2020-09-27T12:00:00+01:00 MW 150 0 150 Failure
Plant Fault - Electrical Equipment
Hydro Pumped Storage 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005315_002 Dismissed Unplanned Production unavailability 2020-09-27T15:58:05+01:00 2020-09-27T15:47:00+01:00 2020-09-27T16:03:00+01:00 MW 500 680 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005315_001 Dismissed Unplanned Production unavailability 2020-09-27T15:47:48+01:00 2020-09-27T15:47:00+01:00 2020-09-27T16:03:00+01:00 MW 560 620 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005315_003 Dismissed Unplanned Production unavailability 2020-09-27T16:03:42+01:00 2020-09-27T15:47:00+01:00 2020-09-27T16:08:00+01:00 MW 500 680 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005315_005 Inactive Unplanned Production unavailability 2020-09-27T17:31:54+01:00 2020-09-27T15:47:00+01:00 2020-09-27T16:20:00+01:00 MW 500 680 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005315_004 Dismissed Unplanned Production unavailability 2020-09-27T16:13:01+01:00 2020-09-27T15:47:00+01:00 2020-09-27T16:20:00+01:00 MW 500 680 1180 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_007 Dismissed Planned Production unavailability 2019-01-25T14:04:04+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_006 Dismissed Planned Production unavailability 2018-10-26T09:02:16+01:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_005 Dismissed Planned Production unavailability 2018-07-16T14:22:42+01:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_004 Dismissed Planned Production unavailability 2018-03-02T12:12:35+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_003 Dismissed Planned Production unavailability 2017-11-17T09:22:09+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_002 Dismissed Planned Production unavailability 2017-11-17T09:15:07+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000003401_001 Dismissed Planned Production unavailability 2017-11-07T14:39:36+00:00 2020-09-13T23:00:00+01:00 2020-09-27T23:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005312_004 Dismissed Unplanned Production unavailability 2020-09-28T11:23:28+01:00 2020-09-26T18:00:00+01:00 2020-09-28T11:30:00+01:00 MW 150 0 150 Failure
Plant Fault - Electrical Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005313_004 Dismissed Unplanned Consumption unavailability 2020-09-28T11:22:58+01:00 2020-09-26T18:00:00+01:00 2020-09-28T11:30:00+01:00 MW 150 0 150 Failure
Plant Fault - Electrical Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005312_003 Dismissed Unplanned Production unavailability 2020-09-27T11:16:07+01:00 2020-09-26T18:00:00+01:00 2020-09-28T17:00:00+01:00 MW 150 0 150 Failure
Plant Fault - Electrical Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005313_003 Dismissed Unplanned Consumption unavailability 2020-09-27T11:16:40+01:00 2020-09-26T18:00:00+01:00 2020-09-28T17:00:00+01:00 MW 150 0 150 Failure
Plant Fault - Electrical Equipment
Hydro Pumped Storage 10YGB----------A
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005234_004 Dismissed Unplanned Production unavailability 2020-08-27T13:23:23+01:00 2020-08-07T10:34:00+01:00 2020-09-30T17:00:00+01:00 MW 50 191 241 Foreseen Maintenance
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000005316_002 Inactive Planned Production unavailability 2020-10-01T13:01:53+01:00 2020-10-01T10:00:00+01:00 2020-10-01T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005317_002 Inactive Planned Production unavailability 2020-10-01T13:01:53+01:00 2020-10-01T10:00:00+01:00 2020-10-01T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000005317_001 Dismissed Planned Production unavailability 2020-09-30T20:13:00+01:00 2020-10-01T10:00:00+01:00 2020-10-01T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000005316_001 Dismissed Planned Production unavailability 2020-09-30T20:11:56+01:00 2020-10-01T10:00:00+01:00 2020-10-01T12:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005320_002 Inactive Unplanned Production unavailability 2020-10-02T01:31:49+01:00 2020-10-01T22:38:00+01:00 2020-10-02T00:30:00+01:00 MW 243 0 243 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005320_001 Dismissed Unplanned Production unavailability 2020-10-01T23:47:33+01:00 2020-10-01T22:38:00+01:00 2020-10-02T00:30:00+01:00 MW 243 0 243 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003181_014 Inactive Planned Production unavailability 2020-10-05T00:01:52+01:00 2020-09-10T23:00:00+01:00 2020-10-04T23:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000003181_013 Dismissed Planned Production unavailability 2020-06-23T14:38:46+01:00 2020-09-10T23:00:00+01:00 2020-10-04T23:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000005318_002 Dismissed Planned Production unavailability 2020-10-02T12:11:48+01:00 2020-10-04T23:00:00+01:00 2020-10-05T06:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Testing
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000005318_004 Inactive Planned Production unavailability 2020-10-05T08:01:53+01:00 2020-10-04T23:00:00+01:00 2020-10-05T07:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Testing
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000005318_003 Dismissed Planned Production unavailability 2020-10-05T01:55:42+01:00 2020-10-04T23:00:00+01:00 2020-10-05T07:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Testing
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000005318_001 Dismissed Planned Production unavailability 2020-10-01T14:28:36+01:00 2020-10-04T23:00:00+01:00 2020-10-05T07:00:00+01:00 MW 710 0 710 Foreseen Maintenance
Testing
Fossil Gas 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005319_002 Inactive Planned Production unavailability 2020-10-08T14:46:43+01:00 2020-10-06T09:00:00+01:00 2020-10-08T14:37:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005319_001 Dismissed Planned Production unavailability 2020-10-01T18:31:04+01:00 2020-10-06T09:00:00+01:00 2020-10-08T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Maintenance
Hydro Water Reservoir 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005324_003 Inactive Planned Production unavailability 2020-10-09T16:01:51+01:00 2020-10-09T08:00:00+01:00 2020-10-09T15:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005324_002 Dismissed Planned Production unavailability 2020-10-09T13:56:59+01:00 2020-10-09T08:00:00+01:00 2020-10-09T15:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000005324_001 Dismissed Planned Production unavailability 2020-10-08T13:59:01+01:00 2020-10-09T08:00:00+01:00 2020-10-09T20:00:00+01:00 MW 1180 0 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005327_002 Dismissed Unplanned Production unavailability 2020-10-11T17:05:23+01:00 2020-10-11T13:55:00+01:00 2020-10-11T16:00:00+01:00 MW 20 223 243 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005325_010 Dismissed Planned Production unavailability 2020-10-11T14:00:35+01:00 2020-10-11T14:10:00+01:00 2020-10-11T18:00:00+01:00 MW 126 0 126 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005326_010 Dismissed Planned Production unavailability 2020-10-11T14:01:06+01:00 2020-10-11T14:10:00+01:00 2020-10-11T18:00:00+01:00 MW 168 0 168 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005326_009 Dismissed Planned Production unavailability 2020-10-11T13:54:49+01:00 2020-10-11T15:00:00+01:00 2020-10-11T18:00:00+01:00 MW 168 0 168 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005325_009 Dismissed Planned Production unavailability 2020-10-11T13:54:27+01:00 2020-10-11T15:00:00+01:00 2020-10-11T18:00:00+01:00 MW 126 0 126 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005325_008 Dismissed Planned Production unavailability 2020-10-11T12:46:24+01:00 2020-10-11T14:00:00+01:00 2020-10-11T18:00:00+01:00 MW 126 0 126 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005326_008 Dismissed Planned Production unavailability 2020-10-11T12:46:38+01:00 2020-10-11T14:00:00+01:00 2020-10-11T18:00:00+01:00 MW 168 0 168 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005326_007 Dismissed Planned Production unavailability 2020-10-11T11:30:19+01:00 2020-10-11T13:00:00+01:00 2020-10-11T18:00:00+01:00 MW 168 0 168 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005325_007 Dismissed Planned Production unavailability 2020-10-11T11:29:55+01:00 2020-10-11T13:00:00+01:00 2020-10-11T18:00:00+01:00 MW 126 0 126 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005325_006 Dismissed Planned Production unavailability 2020-10-11T10:35:15+01:00 2020-10-11T12:00:00+01:00 2020-10-11T18:00:00+01:00 MW 126 0 126 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005326_006 Dismissed Planned Production unavailability 2020-10-11T10:35:38+01:00 2020-10-11T12:00:00+01:00 2020-10-11T18:00:00+01:00 MW 168 0 168 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005326_005 Dismissed Planned Production unavailability 2020-10-11T09:53:01+01:00 2020-10-11T10:30:00+01:00 2020-10-11T18:00:00+01:00 MW 168 0 168 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005325_005 Dismissed Planned Production unavailability 2020-10-11T09:52:41+01:00 2020-10-11T10:30:00+01:00 2020-10-11T18:00:00+01:00 MW 126 0 126 Shutdown
Grid
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm
48X000000000208X 0000000000000000000005325_004 Dismissed Planned Production unavailability 2020-10-11T08:42:10+01:00 2020-10-11T10:00:00+01:00 2020-10-11T18:00:00+01:00 MW 126 0 126 Shutdown
Grid
Wind Offshore 10YGB----------A