This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2024-05-03T13:30:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 5 6 7 8 9 >
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000005629_001 Dismissed Planned Production unavailability 2021-03-18T18:58:43+00:00 2021-05-27T17:00:00+01:00 2021-05-27T20:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005898_002 Dismissed Planned Production unavailability 2021-05-07T15:50:30+01:00 2021-05-27T20:00:00+01:00 2021-05-28T07:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005898_001 Dismissed Planned Production unavailability 2021-03-19T18:07:37+00:00 2021-05-27T20:00:00+01:00 2021-05-28T07:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000006081_002 Inactive Unplanned Production unavailability 2021-05-28T08:16:53+01:00 2021-05-28T06:48:00+01:00 2021-05-28T07:05:00+01:00 MW 625 130 755 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000006081_001 Dismissed Unplanned Production unavailability 2021-05-28T06:50:29+01:00 2021-05-28T06:48:00+01:00 2021-05-28T07:05:00+01:00 MW 625 130 755 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000005631_002 Dismissed Planned Production unavailability 2021-05-07T14:51:28+01:00 2021-05-28T07:00:00+01:00 2021-05-28T09:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000005631_001 Dismissed Planned Production unavailability 2021-03-18T18:59:57+00:00 2021-05-28T07:00:00+01:00 2021-05-28T09:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006078_002 Dismissed Planned Production unavailability 2021-05-27T16:23:03+01:00 2021-05-28T11:00:00+01:00 2021-05-28T13:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006079_002 Dismissed Planned Consumption unavailability 2021-05-27T16:19:15+01:00 2021-05-28T11:00:00+01:00 2021-05-28T13:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006077_002 Dismissed Planned Consumption unavailability 2021-05-27T16:23:49+01:00 2021-05-28T11:00:00+01:00 2021-05-28T13:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006076_002 Dismissed Planned Production unavailability 2021-05-27T16:24:37+01:00 2021-05-28T11:00:00+01:00 2021-05-28T13:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006076_003 Dismissed Planned Production unavailability 2021-05-28T10:11:07+01:00 2021-05-28T11:00:00+01:00 2021-05-28T14:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006077_003 Dismissed Planned Consumption unavailability 2021-05-28T10:10:53+01:00 2021-05-28T11:00:00+01:00 2021-05-28T14:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006078_003 Dismissed Planned Production unavailability 2021-05-28T10:10:41+01:00 2021-05-28T11:00:00+01:00 2021-05-28T14:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006079_003 Dismissed Planned Consumption unavailability 2021-05-28T10:10:19+01:00 2021-05-28T11:00:00+01:00 2021-05-28T14:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006079_004 Dismissed Planned Consumption unavailability 2021-05-28T14:05:59+01:00 2021-05-28T11:00:00+01:00 2021-05-28T14:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006078_004 Dismissed Planned Production unavailability 2021-05-28T14:05:34+01:00 2021-05-28T11:00:00+01:00 2021-05-28T14:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006077_004 Dismissed Planned Consumption unavailability 2021-05-28T14:05:17+01:00 2021-05-28T11:00:00+01:00 2021-05-28T14:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006076_004 Dismissed Planned Production unavailability 2021-05-28T14:04:54+01:00 2021-05-28T11:00:00+01:00 2021-05-28T14:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006076_005 Dismissed Planned Production unavailability 2021-05-28T14:31:35+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006078_005 Dismissed Planned Production unavailability 2021-05-28T14:30:55+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006079_005 Dismissed Planned Consumption unavailability 2021-05-28T14:30:35+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006077_005 Dismissed Planned Consumption unavailability 2021-05-28T14:31:16+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006076_007 Inactive Planned Production unavailability 2021-05-28T16:16:52+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006077_007 Inactive Planned Consumption unavailability 2021-05-28T16:16:52+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006078_007 Inactive Planned Production unavailability 2021-05-28T16:16:52+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006079_007 Inactive Planned Consumption unavailability 2021-05-28T16:16:52+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006079_006 Dismissed Planned Consumption unavailability 2021-05-28T15:01:22+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006078_006 Dismissed Planned Production unavailability 2021-05-28T15:00:57+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006077_006 Dismissed Planned Consumption unavailability 2021-05-28T15:00:40+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006076_006 Dismissed Planned Production unavailability 2021-05-28T14:59:10+01:00 2021-05-28T11:00:00+01:00 2021-05-28T15:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005899_002 Dismissed Planned Production unavailability 2021-05-07T15:50:53+01:00 2021-05-28T09:00:00+01:00 2021-05-28T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005899_001 Dismissed Planned Production unavailability 2021-03-19T18:08:32+00:00 2021-05-28T09:00:00+01:00 2021-05-28T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000005632_002 Dismissed Planned Production unavailability 2021-05-07T14:53:39+01:00 2021-05-28T17:00:00+01:00 2021-05-28T20:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000005632_001 Dismissed Planned Production unavailability 2021-03-18T19:00:42+00:00 2021-05-28T17:00:00+01:00 2021-05-28T20:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000006057_002 Inactive Planned Production unavailability 2021-05-29T00:01:53+01:00 2021-05-24T23:00:00+01:00 2021-05-28T23:00:00+01:00 MW 780 400 1180 Foreseen Maintenance
Grid
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000006057_001 Dismissed Planned Production unavailability 2021-05-21T11:42:07+01:00 2021-05-24T23:00:00+01:00 2021-05-28T23:00:00+01:00 MW 780 400 1180 Foreseen Maintenance
Grid
Fossil Gas 10YGB----------A
TB2 47W000000000208P
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005100_003 Dismissed Planned Production unavailability 2021-05-19T16:42:12+01:00 2021-05-15T00:00:00+01:00 2021-05-29T00:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB1 47W000000000207R
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005099_004 Dismissed Planned Production unavailability 2021-05-19T16:17:39+01:00 2021-05-15T00:00:00+01:00 2021-05-29T00:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB1 47W000000000207R
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005099_003 Dismissed Planned Production unavailability 2021-05-19T16:14:07+01:00 2021-05-15T00:00:00+01:00 2021-05-29T00:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005861_002 Dismissed Planned Production unavailability 2021-05-07T15:52:03+01:00 2021-05-28T20:00:00+01:00 2021-05-29T07:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005861_001 Dismissed Planned Production unavailability 2021-03-19T17:02:13+00:00 2021-05-28T20:00:00+01:00 2021-05-29T07:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000005634_002 Dismissed Planned Production unavailability 2021-05-07T14:54:06+01:00 2021-05-29T07:00:00+01:00 2021-05-29T09:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000005634_001 Dismissed Planned Production unavailability 2021-03-18T19:01:25+00:00 2021-05-29T07:00:00+01:00 2021-05-29T09:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
TB1 47W000000000207R
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006053_001 Dismissed Unplanned Production unavailability 2021-05-19T16:38:34+01:00 2021-05-19T16:37:00+01:00 2021-05-29T17:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Outage Overrun
Fossil Oil 10Y1001A1001A59C
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005862_002 Dismissed Planned Production unavailability 2021-05-07T15:51:14+01:00 2021-05-29T09:00:00+01:00 2021-05-29T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000005862_001 Dismissed Planned Production unavailability 2021-03-19T17:03:13+00:00 2021-05-29T09:00:00+01:00 2021-05-29T17:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000005635_002 Dismissed Planned Production unavailability 2021-05-07T14:55:06+01:00 2021-05-29T17:00:00+01:00 2021-05-29T20:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000005635_001 Dismissed Planned Production unavailability 2021-03-18T19:02:07+00:00 2021-05-29T17:00:00+01:00 2021-05-29T20:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE GENERATION
48X000000000077M 0000000000000000000006080_001 Dismissed Planned Production unavailability 2021-05-27T11:12:16+01:00 2021-05-28T23:00:00+01:00 2021-05-29T23:00:00+01:00 MW 280 900 1180 Foreseen Maintenance
Grid