Last update at: 2024-04-28T19:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 3 4 5 6 7 > | ||||||||||||||||||
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005831_002 | Dismissed | Planned | Production unavailability | 2021-05-07T15:17:00+01:00 | 2021-05-12T20:00:00+01:00 | 2021-05-13T07:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005831_001 | Dismissed | Planned | Production unavailability | 2021-03-19T15:42:22+00:00 | 2021-05-12T20:00:00+01:00 | 2021-05-13T07:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005643_002 | Dismissed | Planned | Production unavailability | 2021-05-07T14:19:40+01:00 | 2021-05-13T07:00:00+01:00 | 2021-05-13T09:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005643_001 | Dismissed | Planned | Production unavailability | 2021-03-18T19:06:53+00:00 | 2021-05-13T07:00:00+01:00 | 2021-05-13T09:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006035_002 | Dismissed | Planned | Production unavailability | 2021-05-12T08:21:56+01:00 | 2021-04-12T09:00:00+01:00 | 2021-05-13T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005832_002 | Dismissed | Planned | Production unavailability | 2021-05-07T15:21:17+01:00 | 2021-05-13T09:00:00+01:00 | 2021-05-13T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005832_001 | Dismissed | Planned | Production unavailability | 2021-03-19T15:43:42+00:00 | 2021-05-13T09:00:00+01:00 | 2021-05-13T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005834_003 | Dismissed | Planned | Production unavailability | 2021-05-07T15:19:32+01:00 | 2021-05-13T09:00:00+01:00 | 2021-05-13T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005834_002 | Dismissed | Planned | Production unavailability | 2021-03-19T15:58:58+00:00 | 2021-05-13T09:00:00+01:00 | 2021-05-13T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005834_001 | Dismissed | Planned | Production unavailability | 2021-03-19T15:58:16+00:00 | 2021-05-13T09:00:00+01:00 | 2021-05-13T17:00:00+01:00 | MW | 100 | 0 | 100 | Failure | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005900_002 | Dismissed | Planned | Production unavailability | 2021-05-07T15:18:28+01:00 | 2021-05-13T09:00:00+01:00 | 2021-05-13T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005900_001 | Dismissed | Planned | Production unavailability | 2021-03-19T18:10:49+00:00 | 2021-05-13T09:00:00+01:00 | 2021-05-13T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005646_002 | Dismissed | Planned | Production unavailability | 2021-05-07T14:20:19+01:00 | 2021-05-13T17:00:00+01:00 | 2021-05-13T20:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005646_001 | Dismissed | Planned | Production unavailability | 2021-03-18T19:08:29+00:00 | 2021-05-13T17:00:00+01:00 | 2021-05-13T20:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005901_002 | Dismissed | Planned | Production unavailability | 2021-05-07T15:20:44+01:00 | 2021-05-13T20:00:00+01:00 | 2021-05-14T07:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005901_001 | Dismissed | Planned | Production unavailability | 2021-03-19T18:11:37+00:00 | 2021-05-13T20:00:00+01:00 | 2021-05-14T07:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005649_002 | Dismissed | Planned | Production unavailability | 2021-05-07T14:23:01+01:00 | 2021-05-14T07:00:00+01:00 | 2021-05-14T09:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005649_001 | Dismissed | Planned | Production unavailability | 2021-03-18T19:10:15+00:00 | 2021-05-14T07:00:00+01:00 | 2021-05-14T09:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000002961_014 | Dismissed | Planned | Production unavailability | 2021-05-14T16:09:43+01:00 | 2021-05-14T07:03:00+01:00 | 2021-05-14T16:10:00+01:00 | MW | 0 | 755 | 755 | Foreseen Maintenance | Grid |
Fossil Gas | 10YGB----------A |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006035_003 | Dismissed | Planned | Production unavailability | 2021-05-13T12:13:09+01:00 | 2021-04-12T09:00:00+01:00 | 2021-05-14T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005842_002 | Dismissed | Planned | Production unavailability | 2021-05-07T15:21:52+01:00 | 2021-05-14T09:00:00+01:00 | 2021-05-14T17:00:00+01:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005842_001 | Dismissed | Planned | Production unavailability | 2021-03-19T16:14:00+00:00 | 2021-05-14T09:00:00+01:00 | 2021-05-14T17:00:00+01:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005651_002 | Dismissed | Planned | Production unavailability | 2021-05-07T14:23:47+01:00 | 2021-05-14T17:00:00+01:00 | 2021-05-14T20:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005651_001 | Dismissed | Planned | Production unavailability | 2021-03-18T19:11:40+00:00 | 2021-05-14T17:00:00+01:00 | 2021-05-14T20:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
TB1 | 47W000000000207R | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006045_002 | Inactive | Unplanned | Production unavailability | 2021-05-15T01:01:52+01:00 | 2021-05-14T10:07:00+01:00 | 2021-05-15T00:00:00+01:00 | MW | 54 | 0 | 54 | Failure | Plant Fault - Boiler |
Fossil Oil | 10Y1001A1001A59C |
TB1 | 47W000000000207R | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006045_001 | Dismissed | Unplanned | Production unavailability | 2021-05-14T10:24:03+01:00 | 2021-05-14T10:07:00+01:00 | 2021-05-15T00:00:00+01:00 | MW | 54 | 0 | 54 | Failure | Plant Fault - Boiler |
Fossil Oil | 10Y1001A1001A59C |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000002961_013 | Dismissed | Planned | Production unavailability | 2021-05-14T07:03:45+01:00 | 2021-05-14T07:03:00+01:00 | 2021-05-15T00:00:00+01:00 | MW | 755 | 0 | 755 | Foreseen Maintenance | Grid |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000002961_012 | Dismissed | Planned | Production unavailability | 2021-05-14T07:03:20+01:00 | 2021-05-14T07:03:00+01:00 | 2021-05-15T00:00:00+01:00 | MW | 0 | 755 | 755 | Foreseen Maintenance | Grid |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000002961_011 | Dismissed | Planned | Production unavailability | 2021-05-14T06:54:12+01:00 | 2021-05-14T07:05:00+01:00 | 2021-05-15T00:00:00+01:00 | MW | 405 | 350 | 755 | Foreseen Maintenance | Grid |
Fossil Gas | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000002961_010 | Dismissed | Planned | Production unavailability | 2021-02-04T12:43:34+00:00 | 2021-05-10T00:00:00+01:00 | 2021-05-15T00:00:00+01:00 | MW | 755 | 0 | 755 | Foreseen Maintenance | Grid |
Fossil Gas | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005902_002 | Dismissed | Planned | Production unavailability | 2021-05-07T15:22:15+01:00 | 2021-05-14T20:00:00+01:00 | 2021-05-15T07:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005902_001 | Dismissed | Planned | Production unavailability | 2021-03-19T18:12:47+00:00 | 2021-05-14T20:00:00+01:00 | 2021-05-15T07:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005654_002 | Dismissed | Planned | Production unavailability | 2021-05-07T14:24:18+01:00 | 2021-05-15T07:00:00+01:00 | 2021-05-15T09:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005654_001 | Dismissed | Planned | Production unavailability | 2021-03-18T19:13:33+00:00 | 2021-05-15T07:00:00+01:00 | 2021-05-15T09:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006036_002 | Dismissed | Planned | Production unavailability | 2021-05-10T09:56:25+01:00 | 2021-04-12T09:00:00+01:00 | 2021-05-15T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Outage Overrun |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005162_005 | Dismissed | Planned | Production unavailability | 2021-05-07T18:02:44+01:00 | 2021-04-12T09:00:00+01:00 | 2021-05-15T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005162_004 | Dismissed | Planned | Production unavailability | 2021-05-07T15:54:15+01:00 | 2021-04-12T09:00:00+01:00 | 2021-05-15T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005903_002 | Dismissed | Planned | Production unavailability | 2021-05-07T15:22:37+01:00 | 2021-05-15T09:00:00+01:00 | 2021-05-15T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005903_001 | Dismissed | Planned | Production unavailability | 2021-03-19T18:14:50+00:00 | 2021-05-15T09:00:00+01:00 | 2021-05-15T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005657_002 | Dismissed | Unplanned | Production unavailability | 2021-05-07T14:24:48+01:00 | 2021-05-15T17:00:00+01:00 | 2021-05-15T20:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005657_001 | Dismissed | Unplanned | Production unavailability | 2021-03-18T19:15:20+00:00 | 2021-05-15T17:00:00+01:00 | 2021-05-15T20:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005904_002 | Dismissed | Planned | Production unavailability | 2021-05-07T15:23:25+01:00 | 2021-05-15T20:00:00+01:00 | 2021-05-16T07:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005904_001 | Dismissed | Planned | Production unavailability | 2021-03-19T18:15:48+00:00 | 2021-05-15T20:00:00+01:00 | 2021-05-16T07:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005659_002 | Dismissed | Planned | Production unavailability | 2021-05-07T14:25:43+01:00 | 2021-05-16T07:00:00+01:00 | 2021-05-16T09:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005659_001 | Dismissed | Planned | Production unavailability | 2021-03-18T19:16:51+00:00 | 2021-05-16T07:00:00+01:00 | 2021-05-16T09:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_GRGBW-2 | 48W00000GRGBW-2T | SSE_GROUP |
48X0000000000319 | 0000000000000000000005932_002 | Dismissed | Planned | Production unavailability | 2021-05-10T08:22:40+01:00 | 2021-05-16T08:00:00+01:00 | 2021-05-16T16:00:00+01:00 | MW | 139 | 26 | 165 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_GRGBW-2 | 48W00000GRGBW-2T | SSE_GROUP |
48X0000000000319 | 0000000000000000000005932_001 | Dismissed | Planned | Production unavailability | 2021-03-31T09:45:26+01:00 | 2021-05-16T08:00:00+01:00 | 2021-05-16T16:00:00+01:00 | MW | 139 | 26 | 165 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005905_002 | Dismissed | Planned | Production unavailability | 2021-05-07T15:23:48+01:00 | 2021-05-16T09:00:00+01:00 | 2021-05-16T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000005905_001 | Dismissed | Planned | Production unavailability | 2021-03-19T18:16:40+00:00 | 2021-05-16T09:00:00+01:00 | 2021-05-16T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000005662_002 | Dismissed | Planned | Production unavailability | 2021-05-07T14:26:09+01:00 | 2021-05-16T17:00:00+01:00 | 2021-05-16T20:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |