This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2022-06-30T01:30:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007355_004 Inactive Planned Production unavailability 2022-06-29T10:02:32+01:00 2022-06-28T16:04:00+01:00 2022-06-29T09:00:00+01:00 MW 893 0 893 Failure
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007264_003 Inactive Planned Production unavailability 2022-06-29T10:02:32+01:00 2022-06-29T03:00:00+01:00 2022-06-29T09:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007357_003 Inactive Planned Consumption unavailability 2022-06-29T07:02:31+01:00 2022-06-28T20:05:00+01:00 2022-06-29T06:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007356_004 Inactive Planned Consumption unavailability 2022-06-29T05:02:32+01:00 2022-06-28T20:15:00+01:00 2022-06-29T04:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007354_002 Inactive Planned Production unavailability 2022-06-29T04:02:32+01:00 2022-06-28T16:20:00+01:00 2022-06-29T03:00:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007353_003 Inactive Planned Production unavailability 2022-06-28T17:32:32+01:00 2022-06-28T16:10:00+01:00 2022-06-28T16:20:00+01:00 MW 663 230 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007352_002 Inactive Planned Production unavailability 2022-06-28T17:17:31+01:00 2022-06-28T16:00:00+01:00 2022-06-28T16:10:00+01:00 MW 506 387 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007351_002 Inactive Planned Production unavailability 2022-06-28T17:02:31+01:00 2022-06-28T15:33:00+01:00 2022-06-28T16:00:00+01:00 MW 891 2 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007258_008 Inactive Planned Production unavailability 2022-06-28T12:17:31+01:00 2022-06-27T16:30:00+01:00 2022-06-28T11:05:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007338_002 Inactive Planned Production unavailability 2022-06-27T17:32:32+01:00 2022-06-27T16:00:00+01:00 2022-06-27T16:30:00+01:00 MW 566 327 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007337_002 Inactive Planned Production unavailability 2022-06-27T17:02:32+01:00 2022-06-27T15:10:00+01:00 2022-06-27T16:00:00+01:00 MW 706 187 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007339_004 Inactive Unplanned Production unavailability 2022-06-27T14:17:32+01:00 2022-06-27T12:21:00+01:00 2022-06-27T13:15:00+01:00 MW 657 236 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007257_004 Inactive Planned Production unavailability 2022-06-27T13:02:32+01:00 2022-06-27T10:00:00+01:00 2022-06-27T12:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007334_003 Inactive Planned Production unavailability 2022-06-27T08:02:32+01:00 2022-06-25T18:00:00+01:00 2022-06-27T07:00:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007270_014 Inactive Planned Production unavailability 2022-06-26T19:02:31+01:00 2022-06-16T09:01:00+01:00 2022-06-26T18:00:00+01:00 MW 405 350 755 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007336_002 Inactive Planned Production unavailability 2022-06-25T17:32:32+01:00 2022-06-25T15:45:00+01:00 2022-06-25T16:30:00+01:00 MW 131 762 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007335_002 Inactive Planned Production unavailability 2022-06-25T16:47:32+01:00 2022-06-25T14:50:00+01:00 2022-06-25T15:45:00+01:00 MW 210 683 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007333_004 Inactive Planned Production unavailability 2022-06-25T16:02:31+01:00 2022-06-25T14:00:00+01:00 2022-06-25T14:50:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007332_005 Inactive Planned Production unavailability 2022-06-25T15:02:31+01:00 2022-06-25T13:20:00+01:00 2022-06-25T14:00:00+01:00 MW 362 531 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007329_008 Inactive Planned Production unavailability 2022-06-25T13:47:31+01:00 2022-06-25T11:40:00+01:00 2022-06-25T12:46:00+01:00 MW 507 386 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007327_007 Inactive Planned Production unavailability 2022-06-25T12:47:31+01:00 2022-06-25T09:00:00+01:00 2022-06-25T11:40:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007223_004 Inactive Planned Production unavailability 2022-06-25T10:02:32+01:00 2022-06-24T19:00:00+01:00 2022-06-25T09:00:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007326_003 Inactive Planned Production unavailability 2022-06-24T20:02:33+01:00 2022-06-24T18:30:00+01:00 2022-06-24T18:58:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007325_003 Inactive Planned Production unavailability 2022-06-24T19:02:33+01:00 2022-06-24T17:30:00+01:00 2022-06-24T17:55:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007324_004 Inactive Planned Production unavailability 2022-06-24T18:02:33+01:00 2022-06-24T16:30:00+01:00 2022-06-24T16:54:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007130_002 Inactive Planned Production unavailability 2022-06-24T17:32:33+01:00 2022-06-24T08:00:00+01:00 2022-06-24T16:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007131_002 Inactive Planned Consumption unavailability 2022-06-24T17:32:33+01:00 2022-06-24T08:00:00+01:00 2022-06-24T16:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007323_002 Inactive Planned Production unavailability 2022-06-24T16:47:33+01:00 2022-06-24T15:30:00+01:00 2022-06-24T15:44:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007322_003 Inactive Planned Production unavailability 2022-06-24T15:47:32+01:00 2022-06-24T14:15:00+01:00 2022-06-24T14:45:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007222_005 Inactive Planned Production unavailability 2022-06-24T08:02:31+01:00 2022-06-23T23:00:00+01:00 2022-06-24T06:53:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007321_003 Inactive Planned Production unavailability 2022-06-24T00:02:31+01:00 2022-06-23T18:18:00+01:00 2022-06-23T23:00:00+01:00 MW 93 800 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006063_010 Inactive Planned Production unavailability 2022-06-23T20:47:32+01:00 2022-06-23T08:00:00+01:00 2022-06-23T19:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006064_010 Inactive Planned Consumption unavailability 2022-06-23T20:47:32+01:00 2022-06-23T08:00:00+01:00 2022-06-23T19:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007311_009 Inactive Planned Production unavailability 2022-06-23T18:17:33+01:00 2022-06-23T14:30:00+01:00 2022-06-23T17:10:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007320_002 Inactive Planned Production unavailability 2022-06-23T15:32:33+01:00 2022-06-23T11:40:00+01:00 2022-06-23T14:30:00+01:00 MW 123 770 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007319_002 Inactive Planned Production unavailability 2022-06-23T08:02:31+01:00 2022-06-23T03:00:00+01:00 2022-06-23T07:00:00+01:00 MW 322 571 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007318_002 Inactive Planned Production unavailability 2022-06-23T04:02:31+01:00 2022-06-22T23:00:00+01:00 2022-06-23T03:00:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007316_002 Inactive Planned Production unavailability 2022-06-23T00:02:30+01:00 2022-06-22T19:00:00+01:00 2022-06-22T23:00:00+01:00 MW 131 762 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007310_005 Inactive Planned Production unavailability 2022-06-22T18:17:31+01:00 2022-06-22T14:30:00+01:00 2022-06-22T17:10:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007315_005 Inactive Planned Production unavailability 2022-06-22T12:32:33+01:00 2022-06-22T10:00:00+01:00 2022-06-22T11:20:00+01:00 MW 210 683 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007314_002 Inactive Planned Production unavailability 2022-06-22T11:02:33+01:00 2022-06-22T08:00:00+01:00 2022-06-22T10:00:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007313_002 Inactive Planned Production unavailability 2022-06-22T05:32:31+01:00 2022-06-21T23:59:00+01:00 2022-06-22T04:30:00+01:00 MW 210 683 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007308_004 Inactive Planned Production unavailability 2022-06-22T01:02:31+01:00 2022-06-21T22:30:00+01:00 2022-06-21T23:59:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007307_004 Inactive Planned Production unavailability 2022-06-21T23:32:31+01:00 2022-06-21T18:30:00+01:00 2022-06-21T22:30:00+01:00 MW 243 650 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007312_002 Inactive Planned Production unavailability 2022-06-21T19:32:32+01:00 2022-06-21T17:19:00+01:00 2022-06-21T18:30:00+01:00 MW 118 775 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000007309_006 Inactive Unplanned Production unavailability 2022-06-21T18:02:32+01:00 2022-06-21T03:38:00+01:00 2022-06-21T17:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - Control System
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007306_003 Inactive Planned Production unavailability 2022-06-21T17:02:32+01:00 2022-06-21T14:00:00+01:00 2022-06-21T16:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007304_006 Inactive Planned Production unavailability 2022-06-21T14:47:31+01:00 2022-06-21T09:30:00+01:00 2022-06-21T13:45:00+01:00 MW 507 386 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007303_002 Inactive Planned Production unavailability 2022-06-21T10:32:32+01:00 2022-06-21T08:00:00+01:00 2022-06-21T09:30:00+01:00 MW 210 683 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007302_004 Inactive Planned Production unavailability 2022-06-21T08:32:32+01:00 2022-06-20T19:00:00+01:00 2022-06-21T07:22:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A