Last update at: 2024-09-17T17:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009431_003 | Inactive | Unplanned | Production unavailability | 2024-09-17T17:02:32+01:00 | 2024-09-17T11:30:00+01:00 | 2024-09-17T16:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009432_003 | Inactive | Unplanned | Consumption unavailability | 2024-09-17T17:02:32+01:00 | 2024-09-17T11:30:00+01:00 | 2024-09-17T16:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009427_005 | Inactive | Planned | Production unavailability | 2024-09-17T16:17:32+01:00 | 2024-09-17T14:00:00+01:00 | 2024-09-17T15:16:00+01:00 | MW | 100 | 12 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009426_004 | Inactive | Planned | Production unavailability | 2024-09-17T11:02:32+01:00 | 2024-09-17T08:00:00+01:00 | 2024-09-17T10:00:00+01:00 | MW | 100 | 12 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009424_003 | Inactive | Unplanned | Production unavailability | 2024-09-16T08:17:32+01:00 | 2024-09-16T04:24:00+01:00 | 2024-09-16T07:15:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009425_003 | Inactive | Unplanned | Consumption unavailability | 2024-09-16T08:17:32+01:00 | 2024-09-16T04:24:00+01:00 | 2024-09-16T07:15:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009422_002 | Inactive | Unplanned | Production unavailability | 2024-09-15T23:02:32+01:00 | 2024-09-15T21:19:00+01:00 | 2024-09-15T22:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Turbine |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009423_002 | Inactive | Unplanned | Consumption unavailability | 2024-09-15T23:02:32+01:00 | 2024-09-15T21:19:00+01:00 | 2024-09-15T22:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Turbine |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009421_002 | Inactive | Planned | Consumption unavailability | 2024-09-15T13:02:32+01:00 | 2024-09-15T03:06:00+01:00 | 2024-09-15T12:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009412_003 | Inactive | Planned | Consumption unavailability | 2024-09-13T14:02:33+01:00 | 2024-09-13T09:00:00+01:00 | 2024-09-13T13:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009411_002 | Inactive | Planned | Production unavailability | 2024-09-13T14:02:33+01:00 | 2024-09-13T09:00:00+01:00 | 2024-09-13T13:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009407_003 | Inactive | Planned | Production unavailability | 2024-09-13T10:02:32+01:00 | 2024-09-12T17:00:00+01:00 | 2024-09-13T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Outage Overrun |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009392_003 | Inactive | Planned | Consumption unavailability | 2024-09-13T10:02:32+01:00 | 2024-09-06T13:30:00+01:00 | 2024-09-13T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Outage Overrun |
Hydro Pumped Storage | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009397_002 | Inactive | Planned | Production unavailability | 2024-09-13T06:02:32+01:00 | 2024-09-12T23:00:00+01:00 | 2024-09-13T05:00:00+01:00 | MW | 370 | 340 | 710 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009406_002 | Inactive | Planned | Production unavailability | 2024-09-12T18:02:32+01:00 | 2024-09-12T12:00:00+01:00 | 2024-09-12T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009399_004 | Inactive | Planned | Production unavailability | 2024-09-12T13:02:32+01:00 | 2024-09-11T10:12:00+01:00 | 2024-09-12T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Outage Overrun |
Hydro Pumped Storage | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009402_003 | Inactive | Planned | Production unavailability | 2024-09-12T10:02:32+01:00 | 2024-09-12T09:00:00+01:00 | 2024-09-12T09:01:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009403_003 | Inactive | Planned | Production unavailability | 2024-09-12T10:02:32+01:00 | 2024-09-12T09:00:00+01:00 | 2024-09-12T09:01:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009404_003 | Inactive | Planned | Production unavailability | 2024-09-12T10:02:32+01:00 | 2024-09-12T09:00:00+01:00 | 2024-09-12T09:01:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009405_003 | Inactive | Planned | Production unavailability | 2024-09-12T10:02:32+01:00 | 2024-09-12T09:00:00+01:00 | 2024-09-12T09:01:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009396_002 | Inactive | Planned | Production unavailability | 2024-09-12T06:02:32+01:00 | 2024-09-11T23:00:00+01:00 | 2024-09-12T05:00:00+01:00 | MW | 370 | 340 | 710 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009401_003 | Inactive | Unplanned | Production unavailability | 2024-09-11T12:02:32+01:00 | 2024-09-11T10:23:00+01:00 | 2024-09-11T11:00:00+01:00 | MW | 107 | 5 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009400_006 | Inactive | Unplanned | Production unavailability | 2024-09-11T11:32:32+01:00 | 2024-09-11T08:58:00+01:00 | 2024-09-11T10:23:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009391_003 | Inactive | Planned | Production unavailability | 2024-09-11T11:02:32+01:00 | 2024-09-06T13:30:00+01:00 | 2024-09-11T10:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Outage Overrun |
Hydro Pumped Storage | 10YGB----------A |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000009393_003 | Inactive | Unplanned | Production unavailability | 2024-09-09T10:32:32+01:00 | 2024-09-08T11:15:00+01:00 | 2024-09-09T09:30:00+01:00 | MW | 26 | 26 | 52 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000006218_004 | Inactive | Planned | Production unavailability | 2024-09-09T07:02:32+01:00 | 2024-09-05T23:00:00+01:00 | 2024-09-09T06:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008432_010 | Inactive | Planned | Production unavailability | 2024-09-08T18:02:32+01:00 | 2024-09-05T07:00:00+01:00 | 2024-09-08T17:00:00+01:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008433_009 | Inactive | Planned | Production unavailability | 2024-09-08T18:02:32+01:00 | 2024-09-05T07:00:00+01:00 | 2024-09-08T17:00:00+01:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008434_008 | Inactive | Planned | Production unavailability | 2024-09-08T18:02:32+01:00 | 2024-09-05T07:00:00+01:00 | 2024-09-08T17:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009389_004 | Inactive | Planned | Production unavailability | 2024-09-06T14:32:32+01:00 | 2024-09-06T10:00:00+01:00 | 2024-09-06T13:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009390_003 | Inactive | Planned | Consumption unavailability | 2024-09-06T14:32:32+01:00 | 2024-09-06T10:00:00+01:00 | 2024-09-06T13:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009388_004 | Inactive | Planned | Consumption unavailability | 2024-09-06T11:02:32+01:00 | 2024-09-05T15:00:00+01:00 | 2024-09-06T10:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Outage Overrun |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009387_003 | Inactive | Planned | Production unavailability | 2024-09-06T11:02:32+01:00 | 2024-09-05T15:00:00+01:00 | 2024-09-06T10:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Outage Overrun |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009385_002 | Inactive | Planned | Production unavailability | 2024-09-05T16:02:32+01:00 | 2024-09-05T12:00:00+01:00 | 2024-09-05T15:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009386_002 | Inactive | Planned | Consumption unavailability | 2024-09-05T16:02:32+01:00 | 2024-09-05T12:00:00+01:00 | 2024-09-05T15:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009384_002 | Inactive | Planned | Consumption unavailability | 2024-09-05T13:02:32+01:00 | 2024-09-04T11:30:00+01:00 | 2024-09-05T12:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Outage Overrun |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009383_002 | Inactive | Planned | Production unavailability | 2024-09-05T13:02:32+01:00 | 2024-09-04T11:30:00+01:00 | 2024-09-05T12:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Outage Overrun |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009382_003 | Inactive | Planned | Consumption unavailability | 2024-09-04T12:47:31+01:00 | 2024-09-04T10:00:00+01:00 | 2024-09-04T11:39:00+01:00 | MW | 150 | 0 | 150 | Failure | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009381_003 | Inactive | Planned | Production unavailability | 2024-09-04T12:47:31+01:00 | 2024-09-04T10:00:00+01:00 | 2024-09-04T11:39:00+01:00 | MW | 150 | 0 | 150 | Failure | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009378_003 | Inactive | Planned | Production unavailability | 2024-09-04T11:02:32+01:00 | 2024-09-03T15:55:00+01:00 | 2024-09-04T10:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Turbine |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009379_003 | Inactive | Planned | Consumption unavailability | 2024-09-04T11:02:32+01:00 | 2024-09-03T15:55:00+01:00 | 2024-09-04T10:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Turbine |
Hydro Pumped Storage | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009377_005 | Inactive | Unplanned | Production unavailability | 2024-09-03T21:32:32+01:00 | 2024-09-03T15:13:00+01:00 | 2024-09-03T20:30:00+01:00 | MW | 112 | 0 | 112 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009380_002 | Inactive | Unplanned | Production unavailability | 2024-09-03T20:02:32+01:00 | 2024-09-03T16:06:00+01:00 | 2024-09-03T19:00:00+01:00 | MW | 632 | 78 | 710 | Failure | Plant Fault - Control System |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009372_005 | Inactive | Planned | Production unavailability | 2024-09-03T17:02:32+01:00 | 2024-09-03T12:00:00+01:00 | 2024-09-03T15:55:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009373_005 | Inactive | Planned | Consumption unavailability | 2024-09-03T17:02:32+01:00 | 2024-09-03T12:00:00+01:00 | 2024-09-03T15:57:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000006071_011 | Inactive | Planned | Production unavailability | 2024-09-03T13:02:32+01:00 | 2024-08-12T08:00:00+01:00 | 2024-09-03T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000006562_011 | Inactive | Planned | Consumption unavailability | 2024-09-03T13:02:32+01:00 | 2024-08-12T08:00:00+01:00 | 2024-09-03T12:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009376_003 | Inactive | Planned | Production unavailability | 2024-09-02T21:32:31+01:00 | 2024-09-02T13:00:00+01:00 | 2024-09-02T20:30:00+01:00 | MW | 755 | 0 | 755 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_STLGW-3 | 48W00000STLGW-3A | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009324_005 | Inactive | Planned | Production unavailability | 2024-08-30T18:17:31+01:00 | 2024-08-29T09:00:00+01:00 | 2024-08-30T17:11:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_STLGW-1 | 48W00000STLGW-1E | Stronelairg Wind Farm Limited |
48X000000000332W | 0000000000000000000009317_002 | Inactive | Planned | Production unavailability | 2024-08-30T17:02:32+01:00 | 2024-08-29T08:00:00+01:00 | 2024-08-30T16:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |