Last update at: 2023-09-26T18:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 2 3 4 5 > | ||||||||||||||||||
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008447_008 | Active | Planned | Consumption unavailability | 2023-09-26T17:38:31+01:00 | 2023-09-24T20:00:00+01:00 | 2023-09-27T12:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
DBAWO-5 | 48W00000DBAWO-5B | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008256_020 | Active | Planned | Production unavailability | 2023-09-26T15:41:35+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-27T19:00:00+01:00 | MW | 138 | 0 | 138 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-4 | 48W00000DBAWO-4D | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008255_020 | Active | Planned | Production unavailability | 2023-09-26T15:41:11+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-27T19:00:00+01:00 | MW | 153 | 0 | 153 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008254_020 | Active | Planned | Production unavailability | 2023-09-26T15:40:35+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-27T19:00:00+01:00 | MW | 303 | 0 | 303 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_020 | Active | Planned | Production unavailability | 2023-09-26T15:40:09+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-27T19:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008253_020 | Active | Planned | Production unavailability | 2023-09-26T15:31:13+01:00 | 2023-07-18T14:00:00+01:00 | 2023-09-27T19:00:00+01:00 | MW | 304 | 0 | 304 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008298_002 | Active | Planned | Production unavailability | 2023-09-26T12:18:45+01:00 | 2023-09-25T06:00:00+01:00 | 2023-09-27T23:59:00+01:00 | MW | 710 | 0 | 710 | Failure | Grid |
Fossil Gas | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008405_004 | Active | Planned | Production unavailability | 2023-09-25T17:28:49+01:00 | 2023-10-25T09:00:00+01:00 | 2023-10-25T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008406_004 | Active | Planned | Consumption unavailability | 2023-09-25T17:27:39+01:00 | 2023-10-25T09:00:00+01:00 | 2023-10-25T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007533_009 | Active | Planned | Consumption unavailability | 2023-09-25T17:25:47+01:00 | 2023-08-25T08:00:00+01:00 | 2023-10-25T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000007532_008 | Active | Planned | Production unavailability | 2023-09-25T17:25:05+01:00 | 2023-08-25T08:00:00+01:00 | 2023-10-25T09:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_003 | Active | Planned | Production unavailability | 2023-09-25T12:18:19+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-04T12:00:00+01:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_004 | Active | Planned | Production unavailability | 2023-09-25T12:17:43+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-04T12:00:00+01:00 | MW | 90 | 210 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008419_002 | Active | Planned | Production unavailability | 2023-09-25T11:21:53+01:00 | 2023-10-02T08:01:00+01:00 | 2023-10-05T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008417_003 | Active | Planned | Production unavailability | 2023-09-25T11:21:00+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008415_003 | Active | Planned | Production unavailability | 2023-09-25T11:19:23+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 138 | 0 | 138 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008413_003 | Active | Planned | Production unavailability | 2023-09-25T11:17:17+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-13T18:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008168_005 | Active | Planned | Production unavailability | 2023-09-25T11:13:55+01:00 | 2023-06-03T14:26:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 80 | 0 | 80 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008392_002 | Active | Planned | Production unavailability | 2023-09-25T11:13:33+01:00 | 2023-10-17T09:00:00+01:00 | 2023-10-17T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000006562_006 | Active | Planned | Consumption unavailability | 2023-09-25T11:13:33+01:00 | 2024-08-12T08:00:00+01:00 | 2024-08-30T18:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000006071_006 | Active | Planned | Production unavailability | 2023-09-25T11:13:33+01:00 | 2024-08-12T08:00:00+01:00 | 2024-08-30T18:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000006073_003 | Active | Planned | Production unavailability | 2023-09-25T11:13:33+01:00 | 2024-06-03T08:00:00+01:00 | 2024-06-21T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
T_FERR-4 | 48W000000FERR-44 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001025_013 | Active | Planned | Production unavailability | 2023-09-25T11:13:33+01:00 | 2015-05-20T07:00:00+01:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_FERR-3 | 48W000000FERR-36 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000001023_014 | Active | Planned | Production unavailability | 2023-09-25T11:13:33+01:00 | 2016-03-23T13:00:00+00:00 | 2050-01-01T00:00:00+00:00 | MW | 490 | 0 | 490 | Shutdown | Maintenance |
Fossil Hard coal | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008067_018 | Active | Planned | Production unavailability | 2023-09-25T11:12:05+01:00 | 2023-06-03T14:26:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 300 | 0 | 300 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008434_001 | Active | Planned | Production unavailability | 2023-09-20T01:17:06+01:00 | 2024-09-10T08:00:00+01:00 | 2024-09-10T16:00:00+01:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008433_001 | Active | Planned | Production unavailability | 2023-09-20T01:14:53+01:00 | 2024-09-10T08:00:00+01:00 | 2024-09-10T16:00:00+01:00 | MW | 138 | 0 | 138 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008432_001 | Active | Planned | Production unavailability | 2023-09-20T01:12:43+01:00 | 2024-09-10T08:00:00+01:00 | 2024-09-10T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008431_001 | Active | Planned | Production unavailability | 2023-09-20T01:10:31+01:00 | 2024-08-12T08:00:00+01:00 | 2024-08-12T16:00:00+01:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008430_001 | Active | Planned | Production unavailability | 2023-09-20T01:06:09+01:00 | 2024-08-12T08:00:00+01:00 | 2024-08-12T16:00:00+01:00 | MW | 138 | 0 | 138 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008429_001 | Active | Planned | Production unavailability | 2023-09-20T01:04:04+01:00 | 2024-08-12T08:00:00+01:00 | 2024-08-12T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008428_001 | Active | Planned | Production unavailability | 2023-09-20T01:00:41+01:00 | 2024-08-13T08:00:00+01:00 | 2024-08-13T16:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008427_001 | Active | Planned | Production unavailability | 2023-09-20T00:55:25+01:00 | 2024-04-10T08:00:00+01:00 | 2024-04-10T16:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008426_001 | Active | Planned | Production unavailability | 2023-09-20T00:52:29+01:00 | 2024-04-08T08:00:00+01:00 | 2024-04-08T17:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008425_001 | Active | Planned | Production unavailability | 2023-09-20T00:50:09+01:00 | 2024-04-08T08:00:00+01:00 | 2024-04-08T17:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008060_002 | Active | Planned | Production unavailability | 2023-09-06T10:24:18+01:00 | 2026-06-27T09:00:00+01:00 | 2026-09-26T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008061_002 | Active | Planned | Production unavailability | 2023-09-06T10:23:02+01:00 | 2026-06-27T09:00:00+01:00 | 2026-09-26T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008342_001 | Active | Planned | Production unavailability | 2023-08-24T20:01:47+01:00 | 2023-10-15T06:01:00+01:00 | 2023-10-18T20:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008065_003 | Active | Planned | Production unavailability | 2023-08-24T19:54:34+01:00 | 2023-10-01T18:01:00+01:00 | 2023-10-15T06:00:00+01:00 | MW | 370 | 340 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000006040_006 | Active | Planned | Production unavailability | 2023-08-09T12:00:28+01:00 | 2024-06-06T23:00:00+01:00 | 2024-07-18T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000006642_004 | Active | Planned | Production unavailability | 2023-08-07T15:51:37+01:00 | 2024-08-23T08:00:00+01:00 | 2024-09-13T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000006643_004 | Active | Planned | Consumption unavailability | 2023-08-07T15:51:00+01:00 | 2024-08-23T08:00:00+01:00 | 2024-09-13T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008273_001 | Active | Planned | Production unavailability | 2023-07-28T16:34:00+01:00 | 2024-02-10T06:00:00+00:00 | 2024-02-13T23:59:00+00:00 | MW | 370 | 340 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008064_002 | Active | Planned | Production unavailability | 2023-07-14T16:42:01+01:00 | 2023-09-29T06:00:00+01:00 | 2023-10-01T18:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000006466_015 | Active | Planned | Production unavailability | 2023-06-07T15:09:39+01:00 | 2023-08-01T00:01:00+01:00 | 2023-11-14T00:00:00+00:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_006 | Active | Planned | Production unavailability | 2023-05-31T15:15:31+01:00 | 2024-05-17T22:00:00+01:00 | 2024-06-09T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008161_001 | Active | Planned | Production unavailability | 2023-05-29T16:06:45+01:00 | 2024-05-25T08:00:00+01:00 | 2024-05-31T16:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008160_001 | Active | Planned | Production unavailability | 2023-05-29T16:04:29+01:00 | 2024-05-25T08:00:00+01:00 | 2024-05-31T16:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008153_002 | Active | Planned | Production unavailability | 2023-05-25T09:00:06+01:00 | 2023-10-31T16:00:00+00:00 | 2023-10-31T20:00:00+00:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008154_002 | Active | Planned | Production unavailability | 2023-05-25T08:58:44+01:00 | 2023-10-31T16:00:00+00:00 | 2023-10-31T20:00:00+00:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |