Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_009 Dismissed Planned Production unavailability 2023-08-25T10:11:37+01:00 2023-07-18T14:00:00+01:00 2023-08-31T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_008 Dismissed Planned Production unavailability 2023-08-22T11:15:32+01:00 2023-07-18T14:00:00+01:00 2023-08-28T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_007 Dismissed Planned Production unavailability 2023-08-18T09:16:38+01:00 2023-07-18T14:00:00+01:00 2023-08-23T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_006 Dismissed Planned Production unavailability 2023-08-14T14:35:26+01:00 2023-07-18T14:00:00+01:00 2023-08-20T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_005 Dismissed Planned Production unavailability 2023-08-09T17:29:30+01:00 2023-07-18T14:00:00+01:00 2023-08-15T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_004 Dismissed Planned Production unavailability 2023-08-04T15:43:26+01:00 2023-07-18T14:00:00+01:00 2023-08-11T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_003 Dismissed Planned Production unavailability 2023-07-28T15:56:11+01:00 2023-07-18T14:00:00+01:00 2023-08-07T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_002 Dismissed Planned Production unavailability 2023-07-24T10:49:57+01:00 2023-07-18T14:00:00+01:00 2023-08-02T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008253_001 Dismissed Planned Production unavailability 2023-07-18T13:48:39+01:00 2023-07-18T14:00:00+01:00 2023-07-28T07:00:00+01:00 MW 304 0 304 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008448_004 Inactive Planned Production unavailability 2023-09-26T15:02:31+01:00 2023-09-25T23:59:00+01:00 2023-09-26T14:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008448_003 Dismissed Planned Production unavailability 2023-09-26T13:52:21+01:00 2023-09-25T23:59:00+01:00 2023-09-26T14:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008448_002 Dismissed Planned Production unavailability 2023-09-25T14:10:34+01:00 2023-09-25T23:59:00+01:00 2023-09-26T23:59:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008448_001 Dismissed Planned Production unavailability 2023-09-25T12:59:39+01:00 2022-09-25T23:59:00+01:00 2023-09-26T23:59:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008449_005 Inactive Unplanned Production unavailability 2023-09-26T13:47:32+01:00 2023-09-26T04:15:00+01:00 2023-09-26T12:35:00+01:00 MW 150 0 150 Failure
Plant Fault - Generator
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008449_004 Dismissed Unplanned Production unavailability 2023-09-26T12:33:31+01:00 2023-09-26T04:15:00+01:00 2023-09-26T12:35:00+01:00 MW 150 0 150 Failure
Plant Fault - Generator
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008449_003 Dismissed Unplanned Production unavailability 2023-09-26T11:19:55+01:00 2023-09-26T04:15:00+01:00 2023-09-26T15:00:00+01:00 MW 150 0 150 Failure
Plant Fault - Generator
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008449_002 Dismissed Unplanned Production unavailability 2023-09-26T08:20:57+01:00 2023-09-26T04:15:00+01:00 2023-09-26T12:00:00+01:00 MW 150 0 150 Failure
Plant Fault - Generator
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008449_001 Dismissed Unplanned Production unavailability 2023-09-26T04:16:26+01:00 2023-09-26T04:15:00+01:00 2023-09-26T09:00:00+01:00 MW 150 0 150 Failure
Plant Fault - Generator
Hydro Pumped Storage 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000008298_002 Active Planned Production unavailability 2023-09-26T12:18:45+01:00 2023-09-25T06:00:00+01:00 2023-09-27T23:59:00+01:00 MW 710 0 710 Failure
Grid
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000008298_001 Dismissed Planned Production unavailability 2023-08-09T12:21:30+01:00 2023-09-25T06:00:00+01:00 2023-09-27T23:59:00+01:00 MW 370 340 710 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008405_004 Active Planned Production unavailability 2023-09-25T17:28:49+01:00 2023-10-25T09:00:00+01:00 2023-10-25T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008405_003 Dismissed Planned Production unavailability 2023-09-18T23:13:26+01:00 2023-09-27T09:00:00+01:00 2023-09-27T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008405_002 Dismissed Planned Production unavailability 2023-09-14T15:39:00+01:00 2023-09-20T09:00:00+01:00 2023-09-20T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008405_001 Dismissed Planned Production unavailability 2023-09-14T12:39:57+01:00 2023-09-15T09:00:00+01:00 2023-09-15T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008406_004 Active Planned Consumption unavailability 2023-09-25T17:27:39+01:00 2023-10-25T09:00:00+01:00 2023-10-25T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008406_003 Dismissed Planned Consumption unavailability 2023-09-18T23:14:46+01:00 2023-09-27T09:00:00+01:00 2023-09-27T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008406_002 Dismissed Planned Consumption unavailability 2023-09-14T15:38:15+01:00 2023-09-20T09:00:00+01:00 2023-09-20T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008406_001 Dismissed Planned Consumption unavailability 2023-09-14T12:41:57+01:00 2023-09-15T09:00:00+01:00 2023-09-15T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_009 Active Planned Consumption unavailability 2023-09-25T17:25:47+01:00 2023-08-25T08:00:00+01:00 2023-10-25T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_008 Dismissed Planned Consumption unavailability 2023-09-25T11:13:33+01:00 2023-08-25T08:00:00+01:00 2023-09-27T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_007 Dismissed Planned Consumption unavailability 2023-09-18T23:11:59+01:00 2023-08-25T08:00:00+01:00 2023-09-27T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_006 Dismissed Planned Consumption unavailability 2023-09-14T15:39:44+01:00 2023-08-25T08:00:00+01:00 2023-09-20T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_005 Dismissed Planned Consumption unavailability 2023-09-14T12:37:18+01:00 2023-08-25T08:00:00+01:00 2023-09-15T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_004 Dismissed Planned Consumption unavailability 2022-09-15T14:26:05+01:00 2023-08-25T08:00:00+01:00 2023-09-15T15:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_003 Dismissed Planned Consumption unavailability 2022-09-13T14:06:13+01:00 2023-08-25T08:00:00+01:00 2023-09-13T15:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_002 Dismissed Planned Consumption unavailability 2022-09-13T14:00:45+01:00 2023-08-25T08:00:00+01:00 2023-09-13T15:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007533_001 Dismissed Planned Consumption unavailability 2022-08-23T14:02:24+01:00 2023-08-25T08:00:00+01:00 2023-09-15T16:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007532_008 Active Planned Production unavailability 2023-09-25T17:25:05+01:00 2023-08-25T08:00:00+01:00 2023-10-25T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007532_007 Dismissed Planned Production unavailability 2023-09-25T11:13:33+01:00 2023-08-25T08:00:00+01:00 2023-09-27T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007532_006 Dismissed Planned Production unavailability 2023-09-18T23:10:45+01:00 2023-08-25T08:00:00+01:00 2023-09-27T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007532_005 Dismissed Planned Production unavailability 2023-09-14T15:40:24+01:00 2023-08-25T08:00:00+01:00 2023-09-20T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007532_004 Dismissed Planned Production unavailability 2023-09-14T12:35:50+01:00 2023-08-25T08:00:00+01:00 2023-09-15T09:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007532_003 Dismissed Planned Production unavailability 2022-09-15T14:26:37+01:00 2023-08-25T08:00:00+01:00 2023-09-15T15:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007532_002 Dismissed Planned Production unavailability 2022-09-13T14:03:06+01:00 2023-08-25T08:00:00+01:00 2023-09-13T15:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007532_001 Dismissed Planned Production unavailability 2022-08-23T14:01:21+01:00 2023-08-25T08:00:00+01:00 2023-09-15T16:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008411_003 Active Planned Production unavailability 2023-09-25T12:18:19+01:00 2023-09-29T12:01:00+01:00 2023-10-04T12:00:00+01:00 MW 30 50 80 Foreseen Maintenance
Testing
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008411_002 Dismissed Planned Production unavailability 2023-09-25T11:14:47+01:00 2023-09-29T12:01:00+01:00 2023-10-04T12:00:00+01:00 MW 30 50 80 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008411_001 Dismissed Planned Production unavailability 2023-09-15T12:41:24+01:00 2023-09-29T12:01:00+01:00 2023-10-04T12:00:00+01:00 MW 30 50 80 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008410_004 Active Planned Production unavailability 2023-09-25T12:17:43+01:00 2023-09-29T12:01:00+01:00 2023-10-04T12:00:00+01:00 MW 90 210 300 Foreseen Maintenance
Testing
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008410_003 Dismissed Planned Production unavailability 2023-09-25T11:15:04+01:00 2023-09-29T12:01:00+01:00 2023-10-04T12:00:00+01:00 MW 90 210 300 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A