Last update at: 2024-07-26T12:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | ||||||||||||||||||
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009271_002 | Inactive | Planned | Production unavailability | 2024-07-24T05:02:32+01:00 | 2024-07-23T20:31:00+01:00 | 2024-07-24T04:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009271_001 | Dismissed | Planned | Production unavailability | 2024-07-23T20:00:48+01:00 | 2024-07-23T20:31:00+01:00 | 2024-07-24T04:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009273_001 | Dismissed | Planned | Production unavailability | 2024-07-23T21:14:48+01:00 | 2024-07-23T21:15:00+01:00 | 2024-07-24T04:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009272_004 | Inactive | Unplanned | Production unavailability | 2024-07-24T00:32:31+01:00 | 2024-07-23T20:23:00+01:00 | 2024-07-23T23:30:00+01:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009272_003 | Dismissed | Unplanned | Production unavailability | 2024-07-23T23:08:38+01:00 | 2024-07-23T20:23:00+01:00 | 2024-07-23T23:30:00+01:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009272_002 | Dismissed | Unplanned | Production unavailability | 2024-07-23T21:29:08+01:00 | 2024-07-23T20:23:00+01:00 | 2024-07-23T23:00:00+01:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009272_001 | Dismissed | Unplanned | Production unavailability | 2024-07-23T20:24:02+01:00 | 2024-07-23T20:23:00+01:00 | 2024-07-23T22:00:00+01:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009242_006 | Inactive | Planned | Production unavailability | 2024-07-23T21:02:31+01:00 | 2024-07-19T23:59:00+01:00 | 2024-07-23T20:00:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009242_005 | Dismissed | Planned | Production unavailability | 2024-07-23T16:22:26+01:00 | 2024-07-19T23:59:00+01:00 | 2024-07-23T20:00:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009242_004 | Dismissed | Planned | Production unavailability | 2024-07-22T17:48:55+01:00 | 2024-07-19T23:59:00+01:00 | 2024-07-23T22:00:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009242_003 | Dismissed | Planned | Production unavailability | 2024-07-18T16:07:22+01:00 | 2024-07-19T23:59:00+01:00 | 2024-07-23T04:59:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009242_002 | Dismissed | Planned | Production unavailability | 2024-07-17T09:22:31+01:00 | 2024-07-19T23:59:00+01:00 | 2024-07-22T23:59:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000009242_001 | Dismissed | Planned | Production unavailability | 2024-07-12T11:59:40+01:00 | 2024-07-18T23:59:00+01:00 | 2024-07-21T23:59:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_008 | Dismissed | Planned | Production unavailability | 2024-07-23T13:42:46+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-23T13:44:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_007 | Dismissed | Planned | Production unavailability | 2024-07-19T10:32:08+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-26T17:00:00+01:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_006 | Dismissed | Planned | Production unavailability | 2024-07-16T10:52:02+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_005 | Dismissed | Planned | Production unavailability | 2024-07-15T16:06:08+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_004 | Dismissed | Planned | Production unavailability | 2024-07-12T08:58:34+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-15T17:00:00+01:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_003 | Dismissed | Planned | Production unavailability | 2024-07-05T11:23:01+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-12T16:30:00+01:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_002 | Dismissed | Planned | Production unavailability | 2024-07-04T11:06:09+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-05T16:30:00+01:00 | MW | 79 | 78 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_001 | Dismissed | Planned | Production unavailability | 2024-07-02T08:28:24+01:00 | 2024-05-22T13:00:00+01:00 | 2024-07-05T16:30:00+01:00 | MW | 79 | 78 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009268_001 | Active | Planned | Production unavailability | 2024-07-22T16:19:40+01:00 | 2024-08-20T13:00:00+01:00 | 2024-08-22T12:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Testing |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000009267_001 | Active | Planned | Production unavailability | 2024-07-22T16:15:35+01:00 | 2024-08-20T08:00:00+01:00 | 2024-08-20T13:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009265_003 | Dismissed | Unplanned | Production unavailability | 2024-07-22T16:08:31+01:00 | 2024-07-22T12:15:00+01:00 | 2024-07-22T16:15:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009265_002 | Dismissed | Unplanned | Production unavailability | 2024-07-22T15:46:00+01:00 | 2024-07-22T12:15:00+01:00 | 2024-07-22T18:15:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000009265_001 | Dismissed | Unplanned | Production unavailability | 2024-07-22T12:17:25+01:00 | 2024-07-22T12:15:00+01:00 | 2024-07-22T16:15:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009266_003 | Inactive | Planned | Consumption unavailability | 2024-07-22T14:32:31+01:00 | 2024-07-22T13:00:00+01:00 | 2024-07-22T13:20:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009266_002 | Dismissed | Planned | Consumption unavailability | 2024-07-22T13:15:26+01:00 | 2024-07-22T13:00:00+01:00 | 2024-07-22T13:20:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009266_001 | Dismissed | Planned | Consumption unavailability | 2024-07-22T12:18:44+01:00 | 2024-07-22T13:00:00+01:00 | 2024-07-22T15:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009263_005 | Inactive | Planned | Consumption unavailability | 2024-07-22T14:02:31+01:00 | 2024-07-21T12:10:00+01:00 | 2024-07-22T13:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009263_004 | Dismissed | Planned | Consumption unavailability | 2024-07-22T12:19:50+01:00 | 2024-07-21T12:10:00+01:00 | 2024-07-22T13:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009263_003 | Dismissed | Planned | Consumption unavailability | 2024-07-21T13:23:20+01:00 | 2024-07-21T12:10:00+01:00 | 2024-07-22T15:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009263_002 | Dismissed | Planned | Consumption unavailability | 2024-07-21T12:47:04+01:00 | 2024-07-21T12:10:00+01:00 | 2024-07-21T21:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009263_001 | Dismissed | Planned | Consumption unavailability | 2024-07-21T12:09:47+01:00 | 2024-07-21T12:10:00+01:00 | 2024-07-21T13:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009264_003 | Inactive | Unplanned | Production unavailability | 2024-07-21T14:02:32+01:00 | 2024-07-21T12:10:00+01:00 | 2024-07-21T13:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009264_002 | Dismissed | Unplanned | Production unavailability | 2024-07-21T12:11:37+01:00 | 2024-07-21T12:10:00+01:00 | 2024-07-21T13:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009264_001 | Dismissed | Unplanned | Production unavailability | 2024-07-21T12:10:56+01:00 | 2024-07-21T12:10:00+01:00 | 2024-07-21T13:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009092_004 | Inactive | Planned | Production unavailability | 2024-07-20T20:02:32+01:00 | 2024-07-17T07:00:00+01:00 | 2024-07-20T19:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009092_003 | Dismissed | Planned | Production unavailability | 2024-07-18T19:33:04+01:00 | 2024-07-17T07:00:00+01:00 | 2024-07-20T19:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009249_003 | Inactive | Planned | Production unavailability | 2024-07-20T20:02:32+01:00 | 2024-07-17T07:00:00+01:00 | 2024-07-20T19:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009249_002 | Dismissed | Planned | Production unavailability | 2024-07-18T19:31:43+01:00 | 2024-07-17T07:00:00+01:00 | 2024-07-20T19:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009092_002 | Dismissed | Planned | Production unavailability | 2024-05-29T15:51:38+01:00 | 2024-07-17T07:00:00+01:00 | 2024-07-21T19:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009092_001 | Dismissed | Planned | Production unavailability | 2024-05-20T16:53:02+01:00 | 2024-07-09T09:00:00+01:00 | 2024-07-12T17:00:00+01:00 | MW | 300 | 0 | 300 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009249_001 | Dismissed | Planned | Production unavailability | 2024-07-17T02:51:43+01:00 | 2024-07-17T07:00:00+01:00 | 2024-07-21T19:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009261_002 | Inactive | Planned | Consumption unavailability | 2024-07-20T09:02:32+01:00 | 2024-07-19T21:01:00+01:00 | 2024-07-20T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009261_001 | Dismissed | Planned | Consumption unavailability | 2024-07-19T21:01:29+01:00 | 2024-07-19T21:01:00+01:00 | 2024-07-20T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009262_003 | Inactive | Planned | Consumption unavailability | 2024-07-20T03:02:31+01:00 | 2024-07-19T22:00:00+01:00 | 2024-07-20T02:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009262_002 | Dismissed | Planned | Consumption unavailability | 2024-07-20T02:00:17+01:00 | 2024-07-19T22:00:00+01:00 | 2024-07-20T02:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009262_001 | Dismissed | Planned | Consumption unavailability | 2024-07-19T21:04:20+01:00 | 2024-07-19T22:00:00+01:00 | 2024-07-20T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009251_003 | Inactive | Unplanned | Production unavailability | 2024-07-20T01:02:31+01:00 | 2024-07-17T23:56:00+01:00 | 2024-07-19T23:59:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |