Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 2 3 4 5 6 >
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005999_005 Dismissed Unplanned Production unavailability 2021-08-06T17:44:02+01:00 2021-04-13T15:15:00+01:00 2021-08-31T17:00:00+01:00 MW 243 0 243 Failure
Plant Fault - Turbine
Fossil Oil 10Y1001A1001A59C
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005999_004 Dismissed Unplanned Production unavailability 2021-07-30T14:47:15+01:00 2021-04-13T15:15:00+01:00 2021-08-06T17:00:00+01:00 MW 243 0 243 Failure
Plant Fault - Turbine
Fossil Oil 10Y1001A1001A59C
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005999_003 Dismissed Unplanned Production unavailability 2021-06-24T10:59:32+01:00 2021-04-13T15:15:00+01:00 2021-07-31T17:00:00+01:00 MW 243 0 243 Failure
Plant Fault - Turbine
Fossil Oil 10Y1001A1001A59C
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005999_002 Dismissed Unplanned Production unavailability 2021-04-16T10:22:56+01:00 2021-04-13T15:15:00+01:00 2021-06-30T17:00:00+01:00 MW 243 0 243 Failure
Plant Fault - Turbine
Fossil Oil 10Y1001A1001A59C
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005999_001 Dismissed Unplanned Production unavailability 2021-04-13T15:33:30+01:00 2021-04-13T15:15:00+01:00 2021-04-16T17:00:00+01:00 MW 243 0 243 Failure
Plant Fault - Turbine
Fossil Oil 10Y1001A1001A59C
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000003886_004 Dismissed Planned Production unavailability 2022-02-25T12:20:07+00:00 2022-06-25T00:00:00+01:00 2022-07-02T00:00:00+01:00 MW 243 0 243 Foreseen Maintenance
Planned Operational Activities
Fossil Oil 10Y1001A1001A59C
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000003886_003 Dismissed Planned Production unavailability 2020-07-01T17:10:14+01:00 2022-06-25T00:00:00+01:00 2022-07-02T00:00:00+01:00 MW 243 0 243 Foreseen Maintenance
Planned Operational Activities
Fossil Oil 10Y1001A1001A59C
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000003886_002 Dismissed Planned Production unavailability 2018-10-26T09:01:56+01:00 2022-06-11T00:00:00+01:00 2022-06-18T00:00:00+01:00 MW 243 0 243 Foreseen Maintenance
Planned Operational Activities
Fossil Oil 10Y1001A1001A59C
TB4 47W0000000001008
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000003886_001 Dismissed Planned Production unavailability 2018-07-16T15:51:59+01:00 2022-06-11T00:00:00+01:00 2022-06-18T00:00:00+01:00 MW 243 0 243 Foreseen Maintenance
Planned Operational Activities
Fossil Oil 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006781_006 Inactive Planned Production unavailability 2022-02-24T16:02:33+00:00 2022-02-23T09:00:00+00:00 2022-02-24T14:50:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006781_005 Dismissed Planned Production unavailability 2022-02-24T14:47:48+00:00 2022-02-23T09:00:00+00:00 2022-02-24T14:50:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006781_004 Dismissed Planned Production unavailability 2022-02-23T09:08:01+00:00 2022-02-23T09:00:00+00:00 2022-02-24T17:00:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006781_003 Dismissed Planned Production unavailability 2022-02-23T09:05:22+00:00 2022-02-23T09:00:00+00:00 2022-02-25T17:00:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006781_002 Dismissed Planned Production unavailability 2022-02-21T16:54:04+00:00 2022-02-28T09:00:00+00:00 2022-03-01T17:00:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006781_001 Dismissed Planned Production unavailability 2022-02-16T11:48:28+00:00 2022-02-23T09:00:00+00:00 2022-02-24T17:00:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006780_004 Inactive Planned Production unavailability 2022-02-23T10:17:32+00:00 2022-02-21T09:00:00+00:00 2022-02-23T09:05:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006780_003 Dismissed Planned Production unavailability 2022-02-23T09:04:00+00:00 2022-02-21T09:00:00+00:00 2022-02-23T09:05:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006780_002 Dismissed Planned Production unavailability 2022-02-21T16:52:29+00:00 2022-02-21T09:00:00+00:00 2022-02-24T17:00:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006780_001 Dismissed Planned Production unavailability 2022-02-16T11:41:25+00:00 2022-02-21T09:00:00+00:00 2022-02-22T17:00:00+00:00 MW 52 0 52 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006670_004 Dismissed Planned Production unavailability 2022-01-31T00:06:00+00:00 2022-01-27T20:00:00+00:00 2022-01-31T01:45:00+00:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006670_003 Dismissed Planned Production unavailability 2022-01-30T17:54:33+00:00 2022-01-27T20:00:00+00:00 2022-01-31T01:45:00+00:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006670_002 Dismissed Planned Production unavailability 2022-01-30T13:05:43+00:00 2022-01-27T20:00:00+00:00 2022-01-31T13:00:00+00:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006670_001 Dismissed Planned Production unavailability 2022-01-26T10:05:46+00:00 2022-01-27T20:00:00+00:00 2022-01-30T17:00:00+00:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006549_006 Inactive Planned Production unavailability 2021-12-31T17:31:53+00:00 2021-12-27T21:00:00+00:00 2021-12-31T16:30:00+00:00 MW 241 0 241 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006549_005 Dismissed Planned Production unavailability 2021-12-27T12:03:12+00:00 2021-12-27T21:00:00+00:00 2021-12-31T16:30:00+00:00 MW 241 0 241 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006549_004 Dismissed Planned Production unavailability 2021-12-27T12:02:27+00:00 2021-12-27T00:00:00+00:00 2021-12-31T16:30:00+00:00 MW 241 0 241 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006549_003 Dismissed Planned Production unavailability 2021-12-25T11:26:04+00:00 2021-12-28T21:00:00+00:00 2021-12-31T16:30:00+00:00 MW 241 0 241 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006549_002 Dismissed Planned Production unavailability 2021-12-19T13:33:24+00:00 2021-12-29T00:00:00+00:00 2021-12-31T16:30:00+00:00 MW 241 0 241 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006549_001 Dismissed Planned Production unavailability 2021-12-17T16:29:05+00:00 2021-12-29T00:00:00+00:00 2021-12-31T18:00:00+00:00 MW 241 0 241 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006572_002 Dismissed Unplanned Production unavailability 2021-12-24T14:55:10+00:00 2021-12-24T09:54:00+00:00 2021-12-24T17:00:00+00:00 MW 241 0 241 Failure
Plant Fault - Auxiliary Equipment
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006572_001 Dismissed Unplanned Production unavailability 2021-12-24T10:31:51+00:00 2021-12-24T09:54:00+00:00 2021-12-24T17:00:00+00:00 MW 241 0 241 Failure
Plant Fault - Auxiliary Equipment
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006552_002 Dismissed Unplanned Production unavailability 2021-12-19T22:24:14+00:00 2021-12-19T21:30:00+00:00 2021-12-19T22:23:00+00:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006552_001 Dismissed Unplanned Production unavailability 2021-12-19T21:35:19+00:00 2021-12-19T21:30:00+00:00 2021-12-19T23:00:00+00:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006548_002 Inactive Planned Production unavailability 2021-12-19T19:01:52+00:00 2021-12-18T22:00:00+00:00 2021-12-19T18:00:00+00:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006548_001 Dismissed Planned Production unavailability 2021-12-17T16:03:25+00:00 2021-12-18T22:00:00+00:00 2021-12-19T18:00:00+00:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006546_002 Dismissed Unplanned Production unavailability 2021-12-17T00:56:37+00:00 2021-12-16T21:47:00+00:00 2021-12-17T02:00:00+00:00 MW 241 0 241 Failure
Plant Fault - Auxiliary Equipment
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006546_001 Dismissed Unplanned Production unavailability 2021-12-16T21:56:25+00:00 2021-12-16T21:47:00+00:00 2021-12-17T02:00:00+00:00 MW 241 0 241 Failure
Plant Fault - Auxiliary Equipment
Fossil Oil 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006529_005 Inactive Unplanned Production unavailability 2021-12-15T17:46:53+00:00 2021-12-15T00:00:00+00:00 2021-12-15T16:37:00+00:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006529_004 Dismissed Unplanned Production unavailability 2021-12-15T16:36:17+00:00 2021-12-15T00:00:00+00:00 2021-12-15T16:37:00+00:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006529_003 Dismissed Unplanned Production unavailability 2021-12-15T12:33:45+00:00 2021-12-15T00:00:00+00:00 2021-12-15T18:30:00+00:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006529_002 Dismissed Unplanned Production unavailability 2021-12-15T11:25:12+00:00 2021-12-15T00:00:00+00:00 2021-12-15T18:00:00+00:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006529_001 Dismissed Unplanned Production unavailability 2021-12-15T08:49:37+00:00 2021-12-15T00:00:00+00:00 2021-12-15T13:00:00+00:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
TB1 47W000000000207R
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005101_003 Dismissed Planned Production unavailability 2021-12-15T08:54:49+00:00 2022-05-04T00:00:00+01:00 2022-05-06T00:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB1 47W000000000207R
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005101_002 Dismissed Planned Production unavailability 2020-11-24T11:00:34+00:00 2022-05-04T00:00:00+01:00 2022-05-06T00:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB1 47W000000000207R
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005101_001 Dismissed Planned Production unavailability 2020-03-31T11:40:40+01:00 2022-05-04T00:00:00+01:00 2022-05-06T00:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB2 47W000000000208P
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005102_003 Dismissed Planned Production unavailability 2021-12-15T08:53:37+00:00 2022-05-04T00:00:00+01:00 2022-05-06T00:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB2 47W000000000208P
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005102_002 Dismissed Planned Production unavailability 2020-11-24T11:00:34+00:00 2022-05-04T00:00:00+01:00 2022-05-06T00:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
TB2 47W000000000208P
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000005102_001 Dismissed Planned Production unavailability 2020-03-31T11:42:03+01:00 2022-05-04T00:00:00+01:00 2022-05-06T00:00:00+01:00 MW 54 0 54 Foreseen Maintenance
Planned Outage
Fossil Oil 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006528_002 Inactive Unplanned Production unavailability 2021-12-15T01:01:53+00:00 2021-12-14T16:00:00+00:00 2021-12-15T00:00:00+00:00 MW 52 0 52 Failure
Plant Fault - Generator
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000006528_001 Dismissed Unplanned Production unavailability 2021-12-14T16:48:14+00:00 2021-12-14T16:00:00+00:00 2021-12-15T00:00:00+00:00 MW 52 0 52 Failure
Plant Fault - Generator
Fossil Gas 10Y1001A1001A59C