Last update at: 2024-04-19T21:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009022_003 Active Unplanned Production unavailability 2024-04-19T15:21:57+01:00 2024-04-19T15:19:00+01:00 2024-04-22T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009022_002 Dismissed Unplanned Production unavailability 2024-04-17T14:41:10+01:00 2024-04-16T16:19:00+01:00 2024-04-19T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009022_001 Dismissed Unplanned Production unavailability 2024-04-16T16:20:43+01:00 2024-04-16T16:19:00+01:00 2024-04-17T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009023_003 Active Unplanned Production unavailability 2024-04-19T15:18:09+01:00 2024-04-19T15:13:00+01:00 2024-04-22T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009023_002 Dismissed Unplanned Production unavailability 2024-04-17T14:46:09+01:00 2024-04-16T18:00:00+01:00 2024-04-19T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009023_001 Dismissed Unplanned Production unavailability 2024-04-16T18:04:15+01:00 2024-04-16T18:00:00+01:00 2024-04-17T17:00:00+01:00 MW 52 0 52 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008849_005 Inactive Planned Production unavailability 2024-04-16T18:02:31+01:00 2024-03-18T09:00:00+00:00 2024-04-16T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008849_004 Dismissed Planned Production unavailability 2024-04-15T16:49:30+01:00 2024-03-18T09:00:00+00:00 2024-04-16T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008849_003 Dismissed Planned Production unavailability 2024-04-12T15:40:47+01:00 2024-03-18T09:00:00+00:00 2024-04-15T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008849_002 Dismissed Planned Production unavailability 2024-04-10T11:12:51+01:00 2024-03-18T09:00:00+00:00 2024-04-12T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008849_001 Dismissed Planned Production unavailability 2024-02-14T13:58:02+00:00 2024-03-18T09:00:00+00:00 2024-04-10T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008848_006 Inactive Planned Production unavailability 2024-04-16T16:47:31+01:00 2024-03-18T09:00:00+00:00 2024-04-16T15:40:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008848_005 Dismissed Planned Production unavailability 2024-04-16T15:36:26+01:00 2024-03-18T09:00:00+00:00 2024-04-16T15:40:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008848_004 Dismissed Planned Production unavailability 2024-04-15T16:50:15+01:00 2024-03-18T09:00:00+00:00 2024-04-16T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008848_003 Dismissed Planned Production unavailability 2024-04-12T15:40:03+01:00 2024-03-18T09:00:00+00:00 2024-04-15T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008848_002 Dismissed Planned Production unavailability 2024-04-10T11:06:19+01:00 2024-03-18T09:00:00+00:00 2024-04-12T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008848_001 Dismissed Planned Production unavailability 2024-02-14T13:55:40+00:00 2024-03-18T09:00:00+00:00 2024-04-10T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Grid
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009020_003 Inactive Unplanned Production unavailability 2024-04-16T07:02:32+01:00 2024-04-16T03:30:00+01:00 2024-04-16T06:00:00+01:00 MW 464 0 464 Failure
Plant Fault - HRSG
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009020_002 Dismissed Unplanned Production unavailability 2024-04-16T05:30:50+01:00 2024-04-16T03:30:00+01:00 2024-04-16T06:00:00+01:00 MW 464 0 464 Failure
Plant Fault - HRSG
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009020_001 Dismissed Unplanned Production unavailability 2024-04-16T03:50:36+01:00 2024-04-16T03:30:00+01:00 2024-04-16T09:00:00+01:00 MW 464 0 464 Failure
Plant Fault - HRSG
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_009 Inactive Planned Production unavailability 2024-04-12T12:47:32+01:00 2024-01-23T10:00:00+00:00 2024-04-12T11:40:00+01:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_008 Dismissed Planned Production unavailability 2024-04-12T11:36:40+01:00 2024-01-23T10:00:00+00:00 2024-04-12T11:40:00+01:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_007 Dismissed Planned Production unavailability 2024-03-27T11:50:42+00:00 2024-01-23T10:00:00+00:00 2024-04-12T17:00:00+01:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_006 Dismissed Planned Production unavailability 2024-03-14T09:18:29+00:00 2024-01-23T10:00:00+00:00 2024-03-29T17:00:00+00:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_005 Dismissed Planned Production unavailability 2024-03-13T22:55:04+00:00 2024-01-23T10:00:00+00:00 2024-05-15T00:00:00+01:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_004 Dismissed Planned Production unavailability 2024-02-09T09:59:42+00:00 2024-01-23T10:00:00+00:00 2024-03-15T00:00:00+00:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_003 Dismissed Planned Production unavailability 2024-01-23T09:58:32+00:00 2024-01-23T10:00:00+00:00 2024-02-29T17:00:00+00:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_002 Dismissed Planned Production unavailability 2024-01-22T13:32:41+00:00 2024-06-29T09:00:00+01:00 2024-07-05T17:00:00+01:00 MW 26 26 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_001 Dismissed Planned Production unavailability 2023-11-27T12:35:21+00:00 2024-06-29T09:00:00+01:00 2024-07-05T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009005_002 Inactive Unplanned Production unavailability 2024-04-11T11:47:32+01:00 2024-04-11T08:11:00+01:00 2024-04-11T10:45:00+01:00 MW 464 0 464 Failure
Plant Fault - HRSG
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000009005_001 Dismissed Unplanned Production unavailability 2024-04-11T08:36:55+01:00 2024-04-11T08:11:00+01:00 2024-04-11T10:45:00+01:00 MW 464 0 464 Failure
Plant Fault - HRSG
Fossil Gas 10Y1001A1001A59C
Cloosh 47W0000000003918
CLOOSH VALLEY WIND FARM DESIGNATED ACTIVITY COMPANY
47X0000000002099 0000000000000000000009001_002 Active Planned Production unavailability 2024-04-10T15:43:55+01:00 2024-04-22T11:00:00+01:00 2024-04-27T15:00:00+01:00 MW 105 0 105 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Cloosh 47W0000000003918
CLOOSH VALLEY WIND FARM DESIGNATED ACTIVITY COMPANY
47X0000000002099 0000000000000000000009001_001 Dismissed Planned Production unavailability 2024-04-10T15:39:51+01:00 2024-04-22T11:00:00+01:00 2024-04-27T15:00:00+01:00 MW 105 0 105 Foreseen Maintenance
Maintenance
Wind Onshore 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008997_001 Active Planned Production unavailability 2024-04-08T15:36:38+01:00 2027-06-21T00:00:00+01:00 2027-06-28T00:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008996_001 Active Planned Production unavailability 2024-04-08T15:34:58+01:00 2027-06-14T00:00:00+01:00 2027-06-21T00:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008995_001 Active Planned Production unavailability 2024-04-08T15:32:49+01:00 2027-05-17T00:00:00+01:00 2027-05-28T00:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008994_001 Active Planned Production unavailability 2024-04-08T15:31:01+01:00 2027-05-17T00:00:00+01:00 2027-05-28T00:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008980_002 Inactive Unplanned Production unavailability 2024-03-31T09:02:31+01:00 2024-03-31T07:00:00+01:00 2024-03-31T08:00:00+01:00 MW 464 0 464 Failure
Plant Fault - HRSG
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008980_001 Dismissed Unplanned Production unavailability 2024-03-31T07:11:00+01:00 2024-03-31T07:00:00+01:00 2024-03-31T08:00:00+01:00 MW 464 0 464 Failure
Plant Fault - HRSG
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008977_002 Inactive Unplanned Production unavailability 2024-03-28T20:32:31+00:00 2024-03-28T18:00:00+00:00 2024-03-28T19:30:00+00:00 MW 52 0 52 Failure
Plant Fault - Auxiliary Equipment
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008977_001 Dismissed Unplanned Production unavailability 2024-03-28T18:36:03+00:00 2024-03-28T18:00:00+00:00 2024-03-28T19:30:00+00:00 MW 52 0 52 Failure
Plant Fault - Auxiliary Equipment
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008061_003 Active Planned Production unavailability 2024-03-28T16:09:00+00:00 2026-04-04T09:00:00+01:00 2026-08-31T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008061_002 Dismissed Planned Production unavailability 2023-09-06T10:23:02+01:00 2026-06-27T09:00:00+01:00 2026-09-26T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008061_001 Dismissed Planned Production unavailability 2023-04-04T12:23:14+01:00 2024-06-29T09:00:00+01:00 2024-09-28T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008060_003 Active Planned Production unavailability 2024-03-28T16:07:39+00:00 2026-04-04T09:00:00+01:00 2026-08-31T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008060_002 Dismissed Planned Production unavailability 2023-09-06T10:24:18+01:00 2026-06-27T09:00:00+01:00 2026-09-26T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008060_001 Dismissed Planned Production unavailability 2023-04-04T12:20:38+01:00 2024-06-29T09:00:00+01:00 2024-09-28T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
RHODE2 47W000000000213W
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008975_001 Active Planned Production unavailability 2024-03-28T16:05:45+00:00 2026-05-18T09:00:00+01:00 2026-05-29T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
RHODE1 47W000000000212Y
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008974_001 Active Planned Production unavailability 2024-03-28T16:04:07+00:00 2026-05-18T09:00:00+01:00 2026-05-29T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
TAWN3 47W000000000215S
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008968_001 Active Planned Production unavailability 2024-03-27T16:10:27+00:00 2025-06-21T09:00:00+01:00 2025-06-28T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C