Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | ||||||||||||||||||
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_002 | Dismissed | Planned | Production unavailability | 2024-04-19T10:56:40+01:00 | 2024-06-28T16:00:00+01:00 | 2024-06-28T20:00:00+01:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_001 | Dismissed | Planned | Production unavailability | 2024-03-20T12:52:32+00:00 | 2024-05-10T16:00:00+01:00 | 2024-05-10T20:00:00+01:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008948_004 | Active | Planned | Production unavailability | 2024-05-10T13:50:57+01:00 | 2024-06-21T16:00:00+01:00 | 2024-06-21T20:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008948_003 | Dismissed | Planned | Production unavailability | 2024-04-19T10:56:19+01:00 | 2024-06-28T16:00:00+01:00 | 2024-06-28T20:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008948_002 | Dismissed | Planned | Production unavailability | 2024-03-20T12:51:11+00:00 | 2024-05-10T16:00:00+01:00 | 2024-05-10T20:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008948_001 | Dismissed | Planned | Production unavailability | 2024-03-20T12:50:43+00:00 | 2024-05-10T16:00:00+01:00 | 2024-05-10T20:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008947_004 | Active | Planned | Production unavailability | 2024-05-10T13:46:16+01:00 | 2024-06-21T16:00:00+01:00 | 2024-06-21T20:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008947_003 | Dismissed | Planned | Production unavailability | 2024-04-19T10:55:51+01:00 | 2024-06-28T16:00:00+01:00 | 2024-06-28T20:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008947_002 | Dismissed | Planned | Production unavailability | 2024-03-20T12:51:00+00:00 | 2024-05-10T16:00:00+01:00 | 2024-05-10T20:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008947_001 | Dismissed | Planned | Production unavailability | 2024-03-20T12:49:38+00:00 | 2024-05-10T16:00:00+01:00 | 2024-05-10T20:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_003 | Active | Planned | Production unavailability | 2024-05-10T07:31:39+01:00 | 2024-05-05T10:00:00+01:00 | 2024-05-15T12:20:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_002 | Dismissed | Planned | Production unavailability | 2024-05-07T17:19:55+01:00 | 2024-05-05T10:00:00+01:00 | 2024-05-10T08:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009066_001 | Dismissed | Planned | Production unavailability | 2024-05-06T07:50:42+01:00 | 2024-05-05T10:00:00+01:00 | 2024-05-08T08:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009075_003 | Inactive | Unplanned | Consumption unavailability | 2024-05-10T00:02:31+01:00 | 2024-05-09T15:34:00+01:00 | 2024-05-09T23:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009075_002 | Dismissed | Unplanned | Consumption unavailability | 2024-05-09T22:51:44+01:00 | 2024-05-09T15:34:00+01:00 | 2024-05-09T23:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009075_001 | Dismissed | Unplanned | Consumption unavailability | 2024-05-09T15:38:30+01:00 | 2024-05-09T15:34:00+01:00 | 2024-05-10T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009074_002 | Inactive | Planned | Consumption unavailability | 2024-05-09T16:02:32+01:00 | 2024-05-09T07:25:00+01:00 | 2024-05-09T15:00:00+01:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009074_001 | Dismissed | Planned | Consumption unavailability | 2024-05-09T07:21:18+01:00 | 2024-05-09T07:25:00+01:00 | 2024-05-09T15:00:00+01:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008645_002 | Active | Planned | Production unavailability | 2024-05-09T11:51:04+01:00 | 2024-05-28T07:00:00+01:00 | 2024-05-28T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008645_001 | Dismissed | Planned | Production unavailability | 2023-11-28T13:35:29+00:00 | 2024-05-28T08:00:00+01:00 | 2024-05-28T16:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008646_002 | Active | Planned | Consumption unavailability | 2024-05-09T11:50:16+01:00 | 2024-05-28T07:00:00+01:00 | 2024-05-28T17:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008646_001 | Dismissed | Planned | Consumption unavailability | 2023-11-28T13:37:59+00:00 | 2024-05-28T08:00:00+01:00 | 2024-05-28T16:30:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Outage |
Hydro Pumped Storage | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009073_001 | Active | Planned | Production unavailability | 2024-05-08T16:08:09+01:00 | 2027-03-05T23:00:00+00:00 | 2027-03-09T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009060_002 | Active | Planned | Production unavailability | 2024-05-08T10:08:48+01:00 | 2024-05-03T13:24:00+01:00 | 2024-05-24T08:00:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009060_001 | Dismissed | Planned | Production unavailability | 2024-05-03T13:25:15+01:00 | 2024-05-03T13:24:00+01:00 | 2024-05-17T08:00:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009061_002 | Active | Planned | Production unavailability | 2024-05-08T10:08:34+01:00 | 2024-05-03T13:25:00+01:00 | 2024-05-24T08:00:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009061_001 | Dismissed | Planned | Production unavailability | 2024-05-03T13:26:31+01:00 | 2024-05-03T13:25:00+01:00 | 2024-05-17T08:00:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009062_002 | Active | Planned | Production unavailability | 2024-05-08T10:08:19+01:00 | 2024-05-03T13:27:00+01:00 | 2024-05-24T08:00:00+01:00 | MW | 108 | 0 | 108 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009062_001 | Dismissed | Planned | Production unavailability | 2024-05-03T13:27:43+01:00 | 2024-05-03T13:27:00+01:00 | 2024-05-17T08:00:00+01:00 | MW | 108 | 0 | 108 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009063_002 | Active | Planned | Production unavailability | 2024-05-08T10:08:03+01:00 | 2024-05-03T13:28:00+01:00 | 2024-05-24T08:00:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009063_001 | Dismissed | Planned | Production unavailability | 2024-05-03T13:28:41+01:00 | 2024-05-03T13:28:00+01:00 | 2024-05-17T08:00:00+01:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009071_001 | Active | Planned | Production unavailability | 2024-05-08T08:11:21+01:00 | 2024-05-20T14:00:00+01:00 | 2024-05-20T15:00:00+01:00 | MW | 263 | 37 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009070_001 | Active | Planned | Production unavailability | 2024-05-08T08:04:53+01:00 | 2024-05-20T13:00:00+01:00 | 2024-05-20T14:00:00+01:00 | MW | 171 | 129 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008606_003 | Active | Planned | Production unavailability | 2024-05-07T14:01:23+01:00 | 2024-04-27T23:00:00+01:00 | 2024-05-15T08:00:00+01:00 | MW | 810 | 370 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008606_002 | Dismissed | Planned | Production unavailability | 2024-04-04T16:03:12+01:00 | 2024-04-27T23:00:00+01:00 | 2024-05-17T23:00:00+01:00 | MW | 810 | 370 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008606_001 | Dismissed | Planned | Production unavailability | 2023-11-24T14:39:03+00:00 | 2024-04-27T23:00:00+01:00 | 2024-05-05T23:00:00+01:00 | MW | 810 | 370 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009064_002 | Inactive | Unplanned | Consumption unavailability | 2024-05-05T21:02:32+01:00 | 2024-05-05T17:11:00+01:00 | 2024-05-05T20:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009065_002 | Inactive | Unplanned | Consumption unavailability | 2024-05-05T21:02:32+01:00 | 2024-05-05T17:11:00+01:00 | 2024-05-05T20:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009065_001 | Dismissed | Unplanned | Consumption unavailability | 2024-05-05T17:15:05+01:00 | 2024-05-05T17:11:00+01:00 | 2024-05-05T20:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009064_001 | Dismissed | Unplanned | Consumption unavailability | 2024-05-05T17:13:06+01:00 | 2024-05-05T17:11:00+01:00 | 2024-05-05T20:00:00+01:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Electrical Equipment |
Hydro Pumped Storage | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009054_003 | Inactive | Planned | Production unavailability | 2024-05-05T11:02:32+01:00 | 2024-04-29T10:00:00+01:00 | 2024-05-05T10:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009054_002 | Dismissed | Planned | Production unavailability | 2024-05-01T13:03:03+01:00 | 2024-04-29T10:00:00+01:00 | 2024-05-05T10:00:00+01:00 | MW | 157 | 0 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009054_001 | Dismissed | Planned | Production unavailability | 2024-04-29T14:25:36+01:00 | 2024-04-29T10:00:00+01:00 | 2024-05-03T14:26:00+01:00 | MW | 105 | 52 | 157 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_006 | Inactive | Unplanned | Consumption unavailability | 2024-05-01T09:02:32+01:00 | 2024-04-29T18:19:00+01:00 | 2024-05-01T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_005 | Dismissed | Unplanned | Consumption unavailability | 2024-04-30T20:06:16+01:00 | 2024-04-29T18:19:00+01:00 | 2024-05-01T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009057_005 | Inactive | Planned | Consumption unavailability | 2024-05-01T09:02:32+01:00 | 2024-04-29T21:10:00+01:00 | 2024-05-01T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009057_004 | Dismissed | Planned | Consumption unavailability | 2024-04-30T20:06:33+01:00 | 2024-04-29T21:10:00+01:00 | 2024-05-01T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_004 | Dismissed | Unplanned | Consumption unavailability | 2024-04-30T14:14:36+01:00 | 2024-04-29T18:19:00+01:00 | 2024-04-30T21:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009056_003 | Dismissed | Unplanned | Consumption unavailability | 2024-04-30T06:31:22+01:00 | 2024-04-29T18:19:00+01:00 | 2024-04-30T15:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009057_003 | Dismissed | Planned | Consumption unavailability | 2024-04-30T14:14:13+01:00 | 2024-04-29T21:10:00+01:00 | 2024-04-30T21:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |