Last update at: 2024-05-12T21:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 6 7 8 9 10 >
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000008017_001 Dismissed Unplanned Production unavailability 2023-03-13T12:29:57+00:00 2023-03-13T12:28:00+00:00 2023-03-13T13:00:00+00:00 MW 103 790 893 Failure
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007896_003 Dismissed Planned Production unavailability 2023-01-24T17:45:20+00:00 2023-01-24T17:35:00+00:00 2023-01-24T18:30:00+00:00 MW 105 788 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000006922_002 Dismissed Planned Production unavailability 2022-04-26T09:25:12+01:00 2022-05-09T09:00:00+01:00 2022-05-09T09:30:00+01:00 MW 79 788 867 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000006922_001 Dismissed Planned Production unavailability 2022-04-22T15:39:30+01:00 2022-05-09T09:00:00+01:00 2022-05-09T09:30:00+01:00 MW 79 788 867 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007866_004 Inactive Planned Production unavailability 2023-01-23T16:32:32+00:00 2023-01-23T15:00:00+00:00 2023-01-23T15:20:00+00:00 MW 108 785 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007866_003 Dismissed Planned Production unavailability 2023-01-23T15:19:58+00:00 2023-01-23T15:00:00+00:00 2023-01-23T15:20:00+00:00 MW 108 785 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007866_002 Dismissed Planned Production unavailability 2023-01-23T14:59:35+00:00 2023-01-23T15:00:00+00:00 2023-01-23T15:30:00+00:00 MW 108 785 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007212_001 Dismissed Planned Production unavailability 2022-06-08T23:54:01+01:00 2022-06-09T15:30:00+01:00 2022-06-09T15:59:00+01:00 MW 109 784 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007410_002 Inactive Planned Production unavailability 2022-07-12T19:01:53+01:00 2022-07-12T15:21:00+01:00 2022-07-12T18:00:00+01:00 MW 111 782 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007410_001 Dismissed Planned Production unavailability 2022-07-12T15:21:42+01:00 2022-07-12T15:21:00+01:00 2022-07-12T18:00:00+01:00 MW 111 782 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007409_002 Inactive Planned Production unavailability 2022-07-12T15:02:32+01:00 2022-07-12T13:07:00+01:00 2022-07-12T14:01:00+01:00 MW 111 782 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007409_001 Dismissed Planned Production unavailability 2022-07-12T13:08:06+01:00 2022-07-12T13:07:00+01:00 2022-07-12T14:01:00+01:00 MW 111 782 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007408_002 Inactive Planned Production unavailability 2022-07-12T13:02:31+01:00 2022-07-12T11:30:00+01:00 2022-07-12T11:59:00+01:00 MW 111 782 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007408_001 Dismissed Planned Production unavailability 2022-07-12T11:31:20+01:00 2022-07-12T11:30:00+01:00 2022-07-12T11:59:00+01:00 MW 111 782 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008505_005 Active Planned Production unavailability 2024-05-07T13:57:49+01:00 2024-05-15T08:00:00+01:00 2024-06-01T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008505_004 Dismissed Planned Production unavailability 2024-04-04T16:12:08+01:00 2024-05-17T23:00:00+01:00 2024-06-01T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008505_003 Dismissed Planned Production unavailability 2023-11-24T15:02:12+00:00 2024-05-17T23:00:00+01:00 2024-06-28T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008505_002 Dismissed Planned Production unavailability 2023-10-20T13:18:23+01:00 2024-05-27T23:00:00+01:00 2024-07-14T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008505_001 Dismissed Planned Production unavailability 2023-10-20T08:59:14+01:00 2024-05-15T23:00:00+01:00 2024-06-24T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000007674_005 Inactive Planned Production unavailability 2024-04-28T00:02:31+01:00 2024-04-05T23:00:00+01:00 2024-04-27T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000007674_004 Dismissed Planned Production unavailability 2023-11-24T14:31:54+00:00 2024-04-05T23:00:00+01:00 2024-04-27T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000007674_003 Dismissed Planned Production unavailability 2023-10-20T13:15:24+01:00 2024-04-05T23:00:00+01:00 2024-05-22T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000007674_002 Dismissed Planned Production unavailability 2023-10-20T08:53:05+01:00 2024-04-05T23:00:00+01:00 2024-05-12T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000009045_003 Inactive Unplanned Production unavailability 2024-04-25T01:17:32+01:00 2024-04-24T23:10:00+01:00 2024-04-25T00:15:00+01:00 MW 400 780 1180 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000009045_002 Dismissed Unplanned Production unavailability 2024-04-25T00:00:04+01:00 2024-04-24T23:10:00+01:00 2024-04-25T00:15:00+01:00 MW 400 780 1180 Failure
Plant Fault - Electrical Equipment
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008607_002 Active Planned Production unavailability 2024-04-04T16:27:59+01:00 2024-06-26T23:00:00+01:00 2024-06-28T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000006400_005 Dismissed Planned Production unavailability 2023-11-27T10:33:24+00:00 2025-04-04T23:00:00+01:00 2025-04-11T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000006400_004 Dismissed Planned Production unavailability 2022-10-26T10:11:01+01:00 2025-04-04T23:00:00+01:00 2025-04-11T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000006400_003 Dismissed Planned Production unavailability 2022-08-05T15:14:33+01:00 2025-02-21T23:00:00+00:00 2025-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000006400_002 Dismissed Planned Production unavailability 2022-03-23T10:54:49+00:00 2025-02-21T23:00:00+00:00 2025-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000006400_001 Dismissed Planned Production unavailability 2021-11-03T11:30:03+00:00 2025-02-21T23:00:00+00:00 2025-02-28T23:00:00+00:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008594_001 Active Planned Production unavailability 2023-11-23T11:39:00+00:00 2028-06-02T23:00:00+01:00 2028-06-09T23:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Planned Outage
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008452_003 Inactive Planned Production unavailability 2023-09-30T03:47:32+01:00 2023-09-29T08:00:00+01:00 2023-09-30T02:40:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008452_002 Dismissed Planned Production unavailability 2023-09-30T02:39:10+01:00 2023-09-29T08:00:00+01:00 2023-09-30T02:40:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008452_001 Dismissed Planned Production unavailability 2023-09-28T12:43:29+01:00 2023-09-29T08:00:00+01:00 2023-09-30T12:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008448_004 Inactive Planned Production unavailability 2023-09-26T15:02:31+01:00 2023-09-25T23:59:00+01:00 2023-09-26T14:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008448_003 Dismissed Planned Production unavailability 2023-09-26T13:52:21+01:00 2023-09-25T23:59:00+01:00 2023-09-26T14:00:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008448_002 Dismissed Planned Production unavailability 2023-09-25T14:10:34+01:00 2023-09-25T23:59:00+01:00 2023-09-26T23:59:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008448_001 Dismissed Planned Production unavailability 2023-09-25T12:59:39+01:00 2022-09-25T23:59:00+01:00 2023-09-26T23:59:00+01:00 MW 400 780 1180 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008446_004 Inactive Planned Production unavailability 2023-09-21T18:47:31+01:00 2023-09-21T11:00:00+01:00 2023-09-21T17:45:00+01:00 MW 400 780 1180 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008446_003 Dismissed Planned Production unavailability 2023-09-21T17:40:46+01:00 2023-09-21T11:00:00+01:00 2023-09-21T17:45:00+01:00 MW 400 780 1180 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008446_002 Dismissed Planned Production unavailability 2023-09-21T16:28:07+01:00 2023-09-21T11:00:00+01:00 2023-09-21T19:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008446_001 Dismissed Planned Production unavailability 2023-09-21T11:18:14+01:00 2023-09-21T11:00:00+01:00 2023-09-21T17:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008435_003 Inactive Planned Production unavailability 2023-09-20T14:47:32+01:00 2023-09-20T08:30:00+01:00 2023-09-20T13:40:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008435_002 Dismissed Planned Production unavailability 2023-09-20T13:40:29+01:00 2023-09-20T08:30:00+01:00 2023-09-20T13:40:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008435_001 Dismissed Planned Production unavailability 2023-09-20T08:22:05+01:00 2023-09-20T08:30:00+01:00 2023-09-20T17:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008424_004 Inactive Planned Production unavailability 2023-09-19T16:17:32+01:00 2023-09-19T09:30:00+01:00 2023-09-19T15:10:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008424_003 Dismissed Planned Production unavailability 2023-09-19T15:06:31+01:00 2023-09-19T09:30:00+01:00 2023-09-19T15:10:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008424_002 Dismissed Planned Production unavailability 2023-09-19T12:04:35+01:00 2023-09-19T09:30:00+01:00 2023-09-19T17:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Maintenance
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008325_004 Inactive Planned Production unavailability 2023-08-18T21:02:31+01:00 2023-08-18T18:00:00+01:00 2023-08-18T20:00:00+01:00 MW 400 780 1180 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A