Last update at: 2023-05-31T15:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 3 4 5 6 7 > | ||||||||||||||||||
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008092_007 | Inactive | Unplanned | Production unavailability | 2023-04-27T21:17:32+01:00 | 2023-04-27T05:15:00+01:00 | 2023-04-27T20:07:00+01:00 | MW | 100 | 0 | 100 | Failure | Plant Fault - Control System |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008092_006 | Dismissed | Unplanned | Production unavailability | 2023-04-27T20:07:10+01:00 | 2023-04-27T05:15:00+01:00 | 2023-04-27T20:07:00+01:00 | MW | 100 | 0 | 100 | Failure | Plant Fault - Control System |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008092_005 | Dismissed | Unplanned | Production unavailability | 2023-04-27T18:15:56+01:00 | 2023-04-27T05:15:00+01:00 | 2023-04-28T18:20:00+01:00 | MW | 100 | 0 | 100 | Failure | Plant Fault - Control System |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008092_004 | Dismissed | Unplanned | Production unavailability | 2023-04-27T16:24:31+01:00 | 2023-04-27T05:15:00+01:00 | 2023-04-28T15:00:00+01:00 | MW | 100 | 0 | 100 | Failure | Plant Fault - Control System |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008092_003 | Dismissed | Unplanned | Production unavailability | 2023-04-27T13:12:06+01:00 | 2023-04-27T05:15:00+01:00 | 2023-04-27T18:00:00+01:00 | MW | 100 | 0 | 100 | Failure | Plant Fault - Control System |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008092_002 | Dismissed | Unplanned | Production unavailability | 2023-04-27T07:29:25+01:00 | 2023-04-27T05:15:00+01:00 | 2023-04-27T15:30:00+01:00 | MW | 100 | 0 | 100 | Failure | Plant Fault - Control System |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008092_001 | Dismissed | Unplanned | Production unavailability | 2023-04-27T05:18:56+01:00 | 2023-04-27T05:15:00+01:00 | 2023-04-27T08:30:00+01:00 | MW | 100 | 0 | 100 | Failure | Plant Fault - Control System |
Hydro Water Reservoir | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007765_004 | Dismissed | Planned | Production unavailability | 2023-04-27T10:32:19+01:00 | 2023-08-16T08:00:00+01:00 | 2023-08-30T17:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007765_003 | Dismissed | Planned | Production unavailability | 2023-02-23T12:45:36+00:00 | 2023-08-16T08:00:00+01:00 | 2023-08-30T17:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007765_002 | Dismissed | Planned | Production unavailability | 2022-12-07T08:41:31+00:00 | 2023-07-23T08:00:00+01:00 | 2023-08-12T17:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007765_001 | Dismissed | Planned | Production unavailability | 2022-12-06T15:48:39+00:00 | 2023-07-23T08:00:00+01:00 | 2023-08-12T17:00:00+01:00 | MW | 126 | 0 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007766_004 | Dismissed | Planned | Production unavailability | 2023-04-27T10:31:13+01:00 | 2023-08-16T08:00:00+01:00 | 2023-08-30T17:00:00+01:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007766_003 | Dismissed | Planned | Production unavailability | 2023-02-23T12:46:21+00:00 | 2023-08-16T08:00:00+01:00 | 2023-08-30T17:00:00+01:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007766_002 | Dismissed | Planned | Production unavailability | 2022-12-07T08:41:31+00:00 | 2023-07-23T08:00:00+01:00 | 2023-08-12T17:00:00+01:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007766_001 | Dismissed | Planned | Production unavailability | 2022-12-06T15:50:39+00:00 | 2023-07-23T08:00:00+01:00 | 2023-08-12T17:00:00+01:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008095_001 | Active | Planned | Production unavailability | 2023-04-27T09:51:10+01:00 | 2026-12-04T23:00:00+00:00 | 2026-12-08T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008094_001 | Active | Planned | Production unavailability | 2023-04-27T09:49:21+01:00 | 2026-09-04T23:00:00+01:00 | 2026-09-08T06:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008093_001 | Active | Planned | Production unavailability | 2023-04-27T09:46:46+01:00 | 2026-06-04T23:00:00+01:00 | 2026-06-19T12:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008090_005 | Inactive | Planned | Consumption unavailability | 2023-04-24T23:02:32+01:00 | 2023-04-24T07:55:00+01:00 | 2023-04-24T22:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008090_004 | Dismissed | Planned | Consumption unavailability | 2023-04-24T21:34:09+01:00 | 2023-04-24T07:55:00+01:00 | 2023-04-24T22:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008090_003 | Dismissed | Planned | Consumption unavailability | 2023-04-24T19:11:34+01:00 | 2023-04-24T07:55:00+01:00 | 2023-04-25T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008090_002 | Dismissed | Planned | Consumption unavailability | 2023-04-24T15:31:23+01:00 | 2023-04-24T07:55:00+01:00 | 2023-04-24T22:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008090_001 | Dismissed | Planned | Consumption unavailability | 2023-04-24T07:51:34+01:00 | 2023-04-24T07:55:00+01:00 | 2023-04-24T16:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008089_002 | Inactive | Planned | Consumption unavailability | 2023-04-24T01:02:32+01:00 | 2023-04-23T17:30:00+01:00 | 2023-04-24T00:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008089_001 | Dismissed | Planned | Consumption unavailability | 2023-04-23T17:20:51+01:00 | 2023-04-23T17:30:00+01:00 | 2023-04-24T00:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008082_002 | Inactive | Planned | Production unavailability | 2023-04-23T23:02:32+01:00 | 2023-04-21T22:00:00+01:00 | 2023-04-23T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008082_001 | Dismissed | Planned | Production unavailability | 2023-04-12T16:02:58+01:00 | 2023-04-21T22:00:00+01:00 | 2023-04-23T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008066_005 | Inactive | Planned | Production unavailability | 2023-04-23T13:02:32+01:00 | 2023-04-20T08:00:00+01:00 | 2023-04-23T12:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008066_004 | Dismissed | Planned | Production unavailability | 2023-04-22T12:04:38+01:00 | 2023-04-20T08:00:00+01:00 | 2023-04-23T12:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008068_004 | Inactive | Planned | Production unavailability | 2023-04-23T13:02:32+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-23T12:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008068_003 | Dismissed | Planned | Production unavailability | 2023-04-22T12:07:12+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-23T12:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008066_003 | Dismissed | Planned | Production unavailability | 2023-04-13T17:35:58+01:00 | 2023-04-20T08:00:00+01:00 | 2023-04-23T14:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008066_002 | Dismissed | Planned | Production unavailability | 2023-04-05T16:27:06+01:00 | 2023-04-17T08:00:00+01:00 | 2023-04-23T16:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008068_002 | Dismissed | Planned | Production unavailability | 2023-04-13T17:37:18+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-23T13:59:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008068_001 | Dismissed | Planned | Production unavailability | 2023-04-05T16:26:32+01:00 | 2023-03-31T12:00:00+01:00 | 2023-04-23T15:59:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008066_001 | Dismissed | Planned | Production unavailability | 2023-04-05T16:20:46+01:00 | 2023-04-17T08:00:00+01:00 | 2023-04-23T16:00:00+01:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008081_004 | Dismissed | Unplanned | Production unavailability | 2023-04-14T07:59:19+01:00 | 2023-04-11T17:50:00+01:00 | 2023-04-14T20:00:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Auxiliary Equipment |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008081_003 | Dismissed | Unplanned | Production unavailability | 2023-04-13T08:59:52+01:00 | 2023-04-11T17:50:00+01:00 | 2023-04-14T20:00:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Auxiliary Equipment |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008081_002 | Dismissed | Unplanned | Production unavailability | 2023-04-13T08:54:41+01:00 | 2023-04-11T17:50:00+01:00 | 2023-04-14T20:00:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Auxiliary Equipment |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008081_001 | Dismissed | Unplanned | Production unavailability | 2023-04-11T17:54:09+01:00 | 2023-04-11T17:50:00+01:00 | 2023-04-14T20:00:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Auxiliary Equipment |
Fossil Gas | 10YGB----------A |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_016 | Active | Unplanned | Production unavailability | 2023-04-13T09:15:01+01:00 | 2021-04-13T15:15:00+01:00 | 2023-12-31T23:59:00+00:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_015 | Dismissed | Unplanned | Production unavailability | 2023-02-28T10:16:02+00:00 | 2021-04-13T15:15:00+01:00 | 2023-12-31T23:59:00+00:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_014 | Dismissed | Unplanned | Production unavailability | 2022-10-13T12:05:33+01:00 | 2021-04-13T15:15:00+01:00 | 2023-12-31T23:59:00+00:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_013 | Dismissed | Unplanned | Production unavailability | 2022-02-25T12:21:12+00:00 | 2021-04-13T15:15:00+01:00 | 2023-03-31T17:00:00+01:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_012 | Dismissed | Unplanned | Production unavailability | 2022-02-23T14:34:50+00:00 | 2021-04-13T15:15:00+01:00 | 2022-03-31T17:00:00+01:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_011 | Dismissed | Unplanned | Production unavailability | 2022-01-26T10:06:50+00:00 | 2021-04-13T15:15:00+01:00 | 2022-02-28T17:00:00+00:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_010 | Dismissed | Unplanned | Production unavailability | 2022-01-17T19:49:04+00:00 | 2021-04-13T15:15:00+01:00 | 2022-01-28T17:00:00+00:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_009 | Dismissed | Unplanned | Production unavailability | 2022-01-14T12:10:42+00:00 | 2021-04-13T15:15:00+01:00 | 2022-01-18T17:00:00+00:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_008 | Dismissed | Unplanned | Production unavailability | 2021-12-17T14:40:11+00:00 | 2021-04-13T15:15:00+01:00 | 2022-01-15T17:00:00+00:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |
TB4 | 47W0000000001008 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005999_007 | Dismissed | Unplanned | Production unavailability | 2021-10-11T17:51:36+01:00 | 2021-04-13T15:15:00+01:00 | 2021-12-31T17:00:00+00:00 | MW | 243 | 0 | 243 | Failure | Plant Fault - Turbine |
Fossil Oil | 10Y1001A1001A59C |