Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | ||||||||||||||||||
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009262_003 | Inactive | Planned | Consumption unavailability | 2024-07-20T03:02:31+01:00 | 2024-07-19T22:00:00+01:00 | 2024-07-20T02:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009262_002 | Dismissed | Planned | Consumption unavailability | 2024-07-20T02:00:17+01:00 | 2024-07-19T22:00:00+01:00 | 2024-07-20T02:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009262_001 | Dismissed | Planned | Consumption unavailability | 2024-07-19T21:04:20+01:00 | 2024-07-19T22:00:00+01:00 | 2024-07-20T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009251_003 | Inactive | Unplanned | Production unavailability | 2024-07-20T01:02:31+01:00 | 2024-07-17T23:56:00+01:00 | 2024-07-19T23:59:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009251_002 | Dismissed | Unplanned | Production unavailability | 2024-07-18T17:20:33+01:00 | 2024-07-17T23:56:00+01:00 | 2024-07-19T23:59:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009251_001 | Dismissed | Unplanned | Production unavailability | 2024-07-18T00:00:05+01:00 | 2024-07-17T23:56:00+01:00 | 2024-07-18T23:59:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008838_006 | Inactive | Planned | Production unavailability | 2024-07-19T19:32:32+01:00 | 2024-07-08T13:00:00+01:00 | 2024-07-19T18:30:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008838_005 | Dismissed | Planned | Production unavailability | 2024-07-19T18:15:49+01:00 | 2024-07-08T13:00:00+01:00 | 2024-07-19T18:30:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008838_004 | Dismissed | Planned | Production unavailability | 2024-07-19T16:48:02+01:00 | 2024-07-08T13:00:00+01:00 | 2024-07-19T19:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008838_003 | Dismissed | Planned | Production unavailability | 2024-07-07T10:29:27+01:00 | 2024-07-08T13:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008838_002 | Dismissed | Planned | Production unavailability | 2024-03-27T15:22:28+00:00 | 2024-07-08T09:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN1 | 47W000000000214U | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008838_001 | Dismissed | Planned | Production unavailability | 2024-02-09T09:42:37+00:00 | 2024-06-29T09:00:00+01:00 | 2024-07-05T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008642_005 | Inactive | Planned | Production unavailability | 2024-07-19T15:47:32+01:00 | 2024-07-08T13:00:00+01:00 | 2024-07-19T14:45:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008642_004 | Dismissed | Planned | Production unavailability | 2024-07-19T14:36:01+01:00 | 2024-07-08T13:00:00+01:00 | 2024-07-19T14:45:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008642_003 | Dismissed | Planned | Production unavailability | 2024-07-07T10:27:15+01:00 | 2024-07-08T13:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008642_002 | Dismissed | Planned | Production unavailability | 2024-03-27T15:23:48+00:00 | 2024-07-08T09:00:00+01:00 | 2024-07-19T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
TAWN3 | 47W000000000215S | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008642_001 | Dismissed | Planned | Production unavailability | 2023-11-27T12:37:44+00:00 | 2024-07-06T09:00:00+01:00 | 2024-07-12T17:00:00+01:00 | MW | 52 | 0 | 52 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_011 | Active | Planned | Production unavailability | 2024-07-18T15:59:40+01:00 | 2024-05-17T22:00:00+01:00 | 2024-07-27T23:59:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_010 | Dismissed | Planned | Production unavailability | 2024-06-19T14:53:45+01:00 | 2024-05-17T22:00:00+01:00 | 2024-07-31T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_009 | Dismissed | Planned | Production unavailability | 2024-06-04T12:04:31+01:00 | 2024-05-17T22:00:00+01:00 | 2024-07-18T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_008 | Dismissed | Planned | Production unavailability | 2024-05-27T11:59:47+01:00 | 2024-05-17T22:00:00+01:00 | 2024-07-10T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_007 | Dismissed | Planned | Production unavailability | 2023-10-20T15:18:38+01:00 | 2024-05-17T22:00:00+01:00 | 2024-06-16T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_006 | Dismissed | Planned | Production unavailability | 2023-05-31T15:15:31+01:00 | 2024-05-17T22:00:00+01:00 | 2024-06-09T22:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_005 | Dismissed | Planned | Production unavailability | 2022-08-05T15:14:33+01:00 | 2024-03-18T00:00:00+00:00 | 2024-04-08T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_004 | Dismissed | Planned | Production unavailability | 2022-03-23T10:54:49+00:00 | 2024-03-18T00:00:00+00:00 | 2024-04-08T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_003 | Dismissed | Planned | Production unavailability | 2021-07-28T08:46:33+01:00 | 2024-03-18T00:00:00+00:00 | 2024-04-08T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_002 | Dismissed | Planned | Production unavailability | 2020-11-24T11:00:34+00:00 | 2024-03-04T00:00:00+00:00 | 2024-03-25T00:00:00+00:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005173_001 | Dismissed | Planned | Production unavailability | 2020-06-15T21:38:47+01:00 | 2024-03-04T00:00:00+00:00 | 2024-03-25T00:00:00+00:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009250_003 | Inactive | Planned | Production unavailability | 2024-07-17T22:02:31+01:00 | 2024-07-17T15:30:00+01:00 | 2024-07-17T21:00:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009250_002 | Dismissed | Planned | Production unavailability | 2024-07-17T20:56:08+01:00 | 2024-07-17T15:30:00+01:00 | 2024-07-17T21:00:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009250_001 | Dismissed | Planned | Production unavailability | 2024-07-17T15:29:32+01:00 | 2024-07-17T15:30:00+01:00 | 2024-07-19T15:30:00+01:00 | MW | 710 | 0 | 710 | Failure | Plant Fault - Turbine |
Fossil Gas | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008813_002 | Dismissed | Planned | Production unavailability | 2024-07-15T14:18:55+01:00 | 2024-07-30T09:00:00+01:00 | 2024-07-30T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000008813_001 | Dismissed | Planned | Production unavailability | 2024-01-29T08:51:26+00:00 | 2024-07-30T09:00:00+01:00 | 2024-07-30T16:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Hydro Water Reservoir | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009234_002 | Inactive | Planned | Production unavailability | 2024-07-15T03:02:32+01:00 | 2024-07-12T12:00:00+01:00 | 2024-07-15T02:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000009234_001 | Dismissed | Planned | Production unavailability | 2024-07-09T15:30:02+01:00 | 2024-07-12T12:00:00+01:00 | 2024-07-15T02:00:00+01:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009246_002 | Inactive | Planned | Production unavailability | 2024-07-13T12:02:32+01:00 | 2024-07-13T10:00:00+01:00 | 2024-07-13T11:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009243_002 | Inactive | Unplanned | Production unavailability | 2024-07-13T12:02:32+01:00 | 2024-07-13T10:00:00+01:00 | 2024-07-13T11:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009244_002 | Inactive | Planned | Production unavailability | 2024-07-13T12:02:32+01:00 | 2024-07-13T10:00:00+01:00 | 2024-07-13T11:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009244_001 | Dismissed | Planned | Production unavailability | 2024-07-13T10:11:12+01:00 | 2024-07-13T10:00:00+01:00 | 2024-07-13T11:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009243_001 | Dismissed | Unplanned | Production unavailability | 2024-07-13T10:08:55+01:00 | 2024-07-13T10:00:00+01:00 | 2024-07-13T11:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009246_001 | Dismissed | Planned | Production unavailability | 2024-07-13T10:17:05+01:00 | 2024-07-13T10:00:00+01:00 | 2024-07-13T11:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009208_017 | Inactive | Planned | Production unavailability | 2024-07-13T11:47:32+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-13T10:45:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009208_016 | Dismissed | Planned | Production unavailability | 2024-07-13T10:44:23+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-13T10:45:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009208_015 | Dismissed | Planned | Production unavailability | 2024-07-13T10:19:54+01:00 | 2024-07-09T10:00:00+01:00 | 2024-07-13T11:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009208_014 | Dismissed | Planned | Production unavailability | 2024-07-13T10:04:48+01:00 | 2024-07-09T10:00:00+01:00 | 2024-08-13T11:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009208_013 | Dismissed | Planned | Production unavailability | 2024-07-12T16:58:38+01:00 | 2024-07-09T10:00:00+01:00 | 2024-08-13T09:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009208_012 | Dismissed | Planned | Production unavailability | 2024-07-12T15:25:52+01:00 | 2024-07-09T10:00:00+01:00 | 2024-08-12T18:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009208_011 | Dismissed | Planned | Production unavailability | 2024-07-12T13:11:12+01:00 | 2024-07-09T10:00:00+01:00 | 2024-08-12T16:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009208_010 | Dismissed | Planned | Production unavailability | 2024-07-12T10:22:51+01:00 | 2024-07-09T10:00:00+01:00 | 2024-08-12T14:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009208_009 | Dismissed | Planned | Production unavailability | 2024-07-12T08:59:03+01:00 | 2024-07-09T10:00:00+01:00 | 2024-08-12T12:00:00+01:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |