Last update at: 2024-05-16T19:30:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009060_003 Active Planned Production unavailability 2024-05-16T17:32:51+01:00 2024-05-03T13:25:00+01:00 2024-05-24T08:00:00+01:00 MW 112 0 112 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009060_002 Dismissed Planned Production unavailability 2024-05-08T10:08:48+01:00 2024-05-03T13:24:00+01:00 2024-05-24T08:00:00+01:00 MW 112 0 112 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009060_001 Dismissed Planned Production unavailability 2024-05-03T13:25:15+01:00 2024-05-03T13:24:00+01:00 2024-05-17T08:00:00+01:00 MW 112 0 112 Shutdown
Commissioning
Wind Onshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_004 Active Planned Production unavailability 2024-05-15T08:32:56+01:00 2024-05-05T10:00:00+01:00 2024-05-20T10:30:00+01:00 MW 157 0 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_003 Dismissed Planned Production unavailability 2024-05-10T07:31:39+01:00 2024-05-05T10:00:00+01:00 2024-05-15T12:20:00+01:00 MW 157 0 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_002 Dismissed Planned Production unavailability 2024-05-07T17:19:55+01:00 2024-05-05T10:00:00+01:00 2024-05-10T08:00:00+01:00 MW 157 0 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_001 Dismissed Planned Production unavailability 2024-05-06T07:50:42+01:00 2024-05-05T10:00:00+01:00 2024-05-08T08:00:00+01:00 MW 157 0 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000009080_005 Inactive Unplanned Production unavailability 2024-05-13T17:32:31+01:00 2024-05-13T05:39:00+01:00 2024-05-13T16:30:00+01:00 MW 840 0 840 Failure
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000009080_004 Dismissed Unplanned Production unavailability 2024-05-13T15:22:20+01:00 2024-05-13T05:39:00+01:00 2024-05-13T16:30:00+01:00 MW 840 0 840 Failure
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000009080_003 Dismissed Unplanned Production unavailability 2024-05-13T12:38:05+01:00 2024-05-13T05:39:00+01:00 2024-05-13T16:00:00+01:00 MW 840 0 840 Failure
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000009080_002 Dismissed Unplanned Production unavailability 2024-05-13T10:09:14+01:00 2024-05-13T05:39:00+01:00 2024-05-13T14:00:00+01:00 MW 840 0 840 Failure
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000009080_001 Dismissed Unplanned Production unavailability 2024-05-13T05:40:06+01:00 2024-05-13T05:39:00+01:00 2024-05-13T12:00:00+01:00 MW 840 0 840 Failure
Plant Fault - Gas Turbine
Fossil Gas 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009078_003 Inactive Planned Consumption unavailability 2024-05-13T09:02:32+01:00 2024-05-12T17:45:00+01:00 2024-05-13T08:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009078_002 Dismissed Planned Consumption unavailability 2024-05-12T20:35:17+01:00 2024-05-12T17:45:00+01:00 2024-05-13T08:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009078_001 Dismissed Planned Consumption unavailability 2024-05-12T16:46:10+01:00 2024-05-12T17:45:00+01:00 2024-05-13T00:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009077_004 Inactive Planned Production unavailability 2024-05-11T17:17:32+01:00 2024-05-11T10:30:00+01:00 2024-05-11T16:10:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009077_003 Dismissed Planned Production unavailability 2024-05-11T16:02:04+01:00 2024-05-11T10:30:00+01:00 2024-05-11T16:10:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009077_002 Dismissed Planned Production unavailability 2024-05-11T12:27:54+01:00 2024-05-11T10:30:00+01:00 2024-05-11T18:30:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009077_001 Dismissed Planned Production unavailability 2024-05-11T10:20:02+01:00 2024-05-11T10:30:00+01:00 2024-05-11T18:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009037_002 Active Planned Production unavailability 2024-05-10T14:09:59+01:00 2024-06-03T07:00:00+01:00 2024-06-03T11:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009037_001 Dismissed Planned Production unavailability 2024-04-19T11:03:06+01:00 2024-06-10T07:00:00+01:00 2024-06-10T11:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009036_002 Active Planned Production unavailability 2024-05-10T14:07:37+01:00 2024-06-03T07:00:00+01:00 2024-06-03T11:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009036_001 Dismissed Planned Production unavailability 2024-04-19T11:02:11+01:00 2024-06-10T07:00:00+01:00 2024-06-10T11:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009035_002 Active Planned Production unavailability 2024-05-10T14:05:09+01:00 2024-06-03T07:00:00+01:00 2024-06-03T11:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009035_001 Dismissed Planned Production unavailability 2024-04-19T11:01:09+01:00 2024-06-10T07:00:00+01:00 2024-06-10T11:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009034_003 Active Planned Production unavailability 2024-05-10T14:03:00+01:00 2024-06-03T07:00:00+01:00 2024-06-03T11:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009034_002 Dismissed Planned Production unavailability 2024-05-10T14:01:36+01:00 2024-06-03T07:00:00+01:00 2024-06-03T11:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009034_001 Dismissed Planned Production unavailability 2024-04-19T11:00:15+01:00 2024-06-10T07:00:00+01:00 2024-06-10T11:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008950_003 Active Planned Production unavailability 2024-05-10T13:58:38+01:00 2024-06-21T16:00:00+01:00 2024-06-21T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008950_002 Dismissed Planned Production unavailability 2024-04-19T10:57:08+01:00 2024-06-28T16:00:00+01:00 2024-06-28T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008950_001 Dismissed Planned Production unavailability 2024-03-20T12:53:31+00:00 2024-05-10T16:00:00+01:00 2024-05-10T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008949_003 Active Planned Production unavailability 2024-05-10T13:53:51+01:00 2024-06-21T16:00:00+01:00 2024-06-21T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008949_002 Dismissed Planned Production unavailability 2024-04-19T10:56:40+01:00 2024-06-28T16:00:00+01:00 2024-06-28T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008949_001 Dismissed Planned Production unavailability 2024-03-20T12:52:32+00:00 2024-05-10T16:00:00+01:00 2024-05-10T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008948_004 Active Planned Production unavailability 2024-05-10T13:50:57+01:00 2024-06-21T16:00:00+01:00 2024-06-21T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008948_003 Dismissed Planned Production unavailability 2024-04-19T10:56:19+01:00 2024-06-28T16:00:00+01:00 2024-06-28T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008948_002 Dismissed Planned Production unavailability 2024-03-20T12:51:11+00:00 2024-05-10T16:00:00+01:00 2024-05-10T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008948_001 Dismissed Planned Production unavailability 2024-03-20T12:50:43+00:00 2024-05-10T16:00:00+01:00 2024-05-10T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008947_004 Active Planned Production unavailability 2024-05-10T13:46:16+01:00 2024-06-21T16:00:00+01:00 2024-06-21T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008947_003 Dismissed Planned Production unavailability 2024-04-19T10:55:51+01:00 2024-06-28T16:00:00+01:00 2024-06-28T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008947_002 Dismissed Planned Production unavailability 2024-03-20T12:51:00+00:00 2024-05-10T16:00:00+01:00 2024-05-10T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008947_001 Dismissed Planned Production unavailability 2024-03-20T12:49:38+00:00 2024-05-10T16:00:00+01:00 2024-05-10T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009075_003 Inactive Unplanned Consumption unavailability 2024-05-10T00:02:31+01:00 2024-05-09T15:34:00+01:00 2024-05-09T23:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009075_002 Dismissed Unplanned Consumption unavailability 2024-05-09T22:51:44+01:00 2024-05-09T15:34:00+01:00 2024-05-09T23:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009075_001 Dismissed Unplanned Consumption unavailability 2024-05-09T15:38:30+01:00 2024-05-09T15:34:00+01:00 2024-05-10T08:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
Meentycat 47W000000000272G
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000009076_003 Dismissed Planned Production unavailability 2024-05-09T20:22:59+01:00 2024-05-09T18:04:00+01:00 2024-05-09T22:00:00+01:00 MW 85 0 85 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Meentycat 47W000000000272G
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000009076_002 Dismissed Planned Production unavailability 2024-05-09T20:16:46+01:00 2024-05-09T18:04:00+01:00 2024-05-09T22:00:00+01:00 MW 85 0 85 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Meentycat 47W000000000272G
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000009076_001 Dismissed Planned Production unavailability 2024-05-09T18:05:48+01:00 2024-05-09T18:04:00+01:00 2024-05-09T20:00:00+01:00 MW 85 0 85 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Meentycat 47W000000000272G
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000009049_002 Inactive Planned Production unavailability 2024-05-09T17:02:32+01:00 2024-05-07T08:45:00+01:00 2024-05-09T16:00:00+01:00 MW 85 0 85 Failure
Testing
Wind Onshore 10Y1001A1001A59C
Meentycat 47W000000000272G
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000009049_001 Dismissed Planned Production unavailability 2024-04-26T12:12:16+01:00 2024-05-07T08:45:00+01:00 2024-05-09T16:00:00+01:00 MW 85 0 85 Failure
Testing
Wind Onshore 10Y1001A1001A59C