Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 3 4 5 6 7 > | ||||||||||||||||||
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008347_002 | Inactive | Planned | Production unavailability | 2023-09-01T00:02:31+01:00 | 2023-08-31T07:01:00+01:00 | 2023-08-31T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008347_001 | Dismissed | Planned | Production unavailability | 2023-08-25T19:43:05+01:00 | 2023-08-31T07:01:00+01:00 | 2023-08-31T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008346_002 | Inactive | Planned | Production unavailability | 2023-08-31T08:02:32+01:00 | 2023-08-30T23:01:00+01:00 | 2023-08-31T07:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008346_001 | Dismissed | Planned | Production unavailability | 2023-08-25T19:41:23+01:00 | 2023-08-30T23:01:00+01:00 | 2023-08-31T07:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008345_002 | Inactive | Planned | Production unavailability | 2023-08-31T00:02:31+01:00 | 2023-08-30T07:01:00+01:00 | 2023-08-30T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008345_001 | Dismissed | Planned | Production unavailability | 2023-08-25T19:39:09+01:00 | 2023-08-30T07:01:00+01:00 | 2023-08-30T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008344_002 | Inactive | Planned | Production unavailability | 2023-08-30T08:02:32+01:00 | 2023-08-29T23:01:00+01:00 | 2023-08-30T07:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008344_001 | Dismissed | Planned | Production unavailability | 2023-08-25T19:37:28+01:00 | 2023-08-29T23:01:00+01:00 | 2023-08-30T07:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008343_002 | Inactive | Planned | Production unavailability | 2023-08-30T00:02:32+01:00 | 2023-08-29T07:01:00+01:00 | 2023-08-29T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008343_001 | Dismissed | Planned | Production unavailability | 2023-08-25T19:12:59+01:00 | 2023-08-29T07:01:00+01:00 | 2023-08-29T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008322_004 | Inactive | Planned | Production unavailability | 2023-08-29T08:02:32+01:00 | 2023-08-23T18:01:00+01:00 | 2023-08-29T07:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008322_003 | Dismissed | Planned | Production unavailability | 2023-08-25T19:09:36+01:00 | 2023-08-23T18:01:00+01:00 | 2023-08-29T07:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008322_002 | Dismissed | Planned | Production unavailability | 2023-08-23T17:23:08+01:00 | 2023-08-23T18:01:00+01:00 | 2023-08-28T18:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008322_001 | Dismissed | Planned | Production unavailability | 2023-08-17T17:21:27+01:00 | 2023-08-23T18:01:00+01:00 | 2023-08-28T18:00:00+01:00 | MW | 78 | 280 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008328_003 | Inactive | Planned | Production unavailability | 2023-08-23T19:02:32+01:00 | 2023-08-23T08:01:00+01:00 | 2023-08-23T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008328_002 | Dismissed | Planned | Production unavailability | 2023-08-23T13:59:47+01:00 | 2023-08-23T08:01:00+01:00 | 2023-08-23T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008328_001 | Dismissed | Planned | Production unavailability | 2023-08-22T09:20:36+01:00 | 2023-08-23T08:01:00+01:00 | 2023-08-23T18:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008327_006 | Inactive | Planned | Production unavailability | 2023-08-23T09:02:32+01:00 | 2023-08-22T12:31:00+01:00 | 2023-08-23T08:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008327_005 | Dismissed | Planned | Production unavailability | 2023-08-22T16:23:15+01:00 | 2023-08-22T12:31:00+01:00 | 2023-08-23T08:00:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008327_004 | Dismissed | Planned | Production unavailability | 2023-08-22T13:24:01+01:00 | 2023-08-22T12:31:00+01:00 | 2023-08-23T08:00:00+01:00 | MW | 278 | 80 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008327_003 | Dismissed | Planned | Production unavailability | 2023-08-22T11:44:35+01:00 | 2023-08-22T12:31:00+01:00 | 2023-08-23T08:00:00+01:00 | MW | 268 | 90 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008327_002 | Dismissed | Planned | Production unavailability | 2023-08-22T10:36:42+01:00 | 2023-08-22T12:01:00+01:00 | 2023-08-23T08:00:00+01:00 | MW | 268 | 90 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008327_001 | Dismissed | Planned | Production unavailability | 2023-08-22T09:18:15+01:00 | 2023-08-22T10:31:00+01:00 | 2023-08-23T08:00:00+01:00 | MW | 268 | 90 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_021 | Inactive | Planned | Production unavailability | 2023-08-22T13:32:32+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-22T12:30:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_020 | Dismissed | Planned | Production unavailability | 2023-08-22T11:44:07+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-22T12:30:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_019 | Dismissed | Planned | Production unavailability | 2023-08-22T10:36:05+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-22T12:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_018 | Dismissed | Planned | Production unavailability | 2023-08-22T09:21:19+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-22T10:30:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_017 | Dismissed | Planned | Production unavailability | 2023-08-21T18:05:34+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-23T18:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_016 | Dismissed | Planned | Production unavailability | 2023-08-15T17:56:58+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-22T18:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_015 | Dismissed | Planned | Production unavailability | 2023-08-14T18:00:38+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-16T18:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_014 | Dismissed | Planned | Production unavailability | 2023-08-14T11:39:29+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-15T18:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_013 | Dismissed | Planned | Production unavailability | 2023-08-11T17:15:40+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-15T12:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_012 | Dismissed | Planned | Production unavailability | 2023-08-10T16:56:13+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-12T18:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_011 | Dismissed | Planned | Production unavailability | 2023-08-01T09:44:23+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-11T17:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_010 | Dismissed | Planned | Production unavailability | 2023-07-26T18:04:24+01:00 | 2023-07-07T18:00:00+01:00 | 2023-08-04T17:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_009 | Dismissed | Planned | Production unavailability | 2023-07-19T17:36:00+01:00 | 2023-07-07T18:00:00+01:00 | 2023-07-28T17:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_008 | Dismissed | Planned | Production unavailability | 2023-07-17T17:49:14+01:00 | 2023-07-07T18:00:00+01:00 | 2023-07-21T17:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_007 | Dismissed | Planned | Production unavailability | 2023-07-17T09:00:11+01:00 | 2023-07-07T18:00:00+01:00 | 2023-07-20T23:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_006 | Dismissed | Planned | Production unavailability | 2023-07-13T17:02:20+01:00 | 2023-07-07T18:00:00+01:00 | 2023-07-17T23:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_005 | Dismissed | Planned | Production unavailability | 2023-07-13T08:50:17+01:00 | 2023-07-07T18:00:00+01:00 | 2023-07-14T23:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_004 | Dismissed | Planned | Production unavailability | 2023-07-12T08:58:05+01:00 | 2023-07-07T18:00:00+01:00 | 2023-07-13T23:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_003 | Dismissed | Planned | Production unavailability | 2023-07-11T08:12:35+01:00 | 2023-07-07T18:00:00+01:00 | 2023-07-12T12:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_002 | Dismissed | Planned | Production unavailability | 2023-07-10T08:46:13+01:00 | 2023-07-07T18:00:00+01:00 | 2023-07-11T12:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008232_001 | Dismissed | Planned | Production unavailability | 2023-07-07T18:10:17+01:00 | 2023-07-07T18:00:00+01:00 | 2023-07-10T15:00:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008320_002 | Dismissed | Planned | Production unavailability | 2023-08-21T18:06:58+01:00 | 2023-08-22T18:01:00+01:00 | 2023-08-23T08:01:00+01:00 | MW | 78 | 280 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008320_001 | Dismissed | Planned | Production unavailability | 2023-08-17T17:19:10+01:00 | 2023-08-22T18:01:00+01:00 | 2023-08-23T08:01:00+01:00 | MW | 78 | 280 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008321_002 | Dismissed | Planned | Production unavailability | 2023-08-21T18:06:13+01:00 | 2023-08-23T08:01:00+01:00 | 2023-08-23T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008321_001 | Dismissed | Planned | Production unavailability | 2023-08-17T17:20:25+01:00 | 2023-08-23T08:01:00+01:00 | 2023-08-23T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008207_009 | Dismissed | Planned | Production unavailability | 2023-07-17T09:47:44+01:00 | 2023-07-20T23:01:00+01:00 | 2023-07-21T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008207_008 | Dismissed | Planned | Production unavailability | 2023-07-17T09:00:40+01:00 | 2023-07-20T23:01:00+01:00 | 2023-07-21T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |