| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 2 3 4 5 6 > | ||||||||||||||||||
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009492_003 | Inactive | Unplanned | Production unavailability | 2024-10-02T15:02:32+00:00 | 2024-10-02T11:55:00+00:00 | 2024-10-02T13:50:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009492_002 | Dismissed | Unplanned | Production unavailability | 2024-10-02T13:47:50+00:00 | 2024-10-02T11:55:00+00:00 | 2024-10-02T13:50:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009492_001 | Dismissed | Unplanned | Production unavailability | 2024-10-02T12:05:33+00:00 | 2024-10-02T11:55:00+00:00 | 2024-10-02T15:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009335_006 | Inactive | Planned | Production unavailability | 2024-08-24T16:32:32+00:00 | 2024-08-19T07:30:00+00:00 | 2024-08-24T15:30:00+00:00 | MW | 64 | 0 | 64 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009335_005 | Dismissed | Planned | Production unavailability | 2024-08-23T18:46:08+00:00 | 2024-08-19T07:30:00+00:00 | 2024-08-24T15:30:00+00:00 | MW | 64 | 0 | 64 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009335_004 | Dismissed | Planned | Production unavailability | 2024-08-16T10:50:26+00:00 | 2024-08-19T07:30:00+00:00 | 2024-08-24T19:00:00+00:00 | MW | 64 | 0 | 64 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009335_003 | Dismissed | Planned | Production unavailability | 2024-08-16T10:37:39+00:00 | 2024-08-19T07:30:00+00:00 | 2024-08-23T19:00:00+00:00 | MW | 64 | 0 | 64 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009335_002 | Dismissed | Planned | Production unavailability | 2024-08-14T09:29:10+00:00 | 2024-08-19T08:00:00+00:00 | 2024-08-23T17:30:00+00:00 | MW | 64 | 0 | 64 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009335_001 | Dismissed | Planned | Production unavailability | 2024-08-14T09:12:18+00:00 | 2024-08-19T08:00:00+00:00 | 2024-08-23T16:30:00+00:00 | MW | 64 | 0 | 64 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008802_007 | Inactive | Unplanned | Production unavailability | 2024-02-03T15:02:32+00:00 | 2024-01-26T18:22:00+00:00 | 2024-02-03T13:52:00+00:00 | MW | 64 | 0 | 64 | Failure | Plant Fault - Auxiliary Equipment |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008802_006 | Dismissed | Unplanned | Production unavailability | 2024-02-03T13:51:03+00:00 | 2024-01-26T18:22:00+00:00 | 2024-02-03T13:52:00+00:00 | MW | 64 | 0 | 64 | Failure | Plant Fault - Auxiliary Equipment |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008802_005 | Dismissed | Unplanned | Production unavailability | 2024-02-02T11:15:09+00:00 | 2024-01-26T18:22:00+00:00 | 2024-02-03T15:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Plant Fault - Auxiliary Equipment |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008802_004 | Dismissed | Unplanned | Production unavailability | 2024-02-01T09:58:14+00:00 | 2024-01-26T18:22:00+00:00 | 2024-02-02T21:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Plant Fault - Auxiliary Equipment |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008802_003 | Dismissed | Unplanned | Production unavailability | 2024-01-27T11:40:59+00:00 | 2024-01-26T18:22:00+00:00 | 2024-02-01T17:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Plant Fault - Auxiliary Equipment |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008802_002 | Dismissed | Unplanned | Production unavailability | 2024-01-26T19:02:19+00:00 | 2024-01-26T18:22:00+00:00 | 2024-01-27T12:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Plant Fault - Auxiliary Equipment |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008802_001 | Dismissed | Unplanned | Production unavailability | 2024-01-26T18:43:28+00:00 | 2024-01-26T18:22:00+00:00 | 2024-01-26T23:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Plant Fault - Auxiliary Equipment |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008226_003 | Inactive | Planned | Production unavailability | 2023-07-21T19:02:31+00:00 | 2023-07-17T08:00:00+00:00 | 2023-07-21T18:00:00+00:00 | MW | 64 | 0 | 64 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008226_002 | Dismissed | Planned | Production unavailability | 2023-07-20T09:36:07+00:00 | 2023-07-17T08:00:00+00:00 | 2023-07-21T18:00:00+00:00 | MW | 64 | 0 | 64 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008226_001 | Dismissed | Planned | Production unavailability | 2023-07-06T11:35:03+00:00 | 2023-07-17T08:00:00+00:00 | 2023-07-22T16:00:00+00:00 | MW | 64 | 0 | 64 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008110_004 | Inactive | Unplanned | Production unavailability | 2023-05-03T14:47:32+00:00 | 2023-05-03T11:51:00+00:00 | 2023-05-03T13:45:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008110_003 | Dismissed | Unplanned | Production unavailability | 2023-05-03T13:43:51+00:00 | 2023-05-03T11:51:00+00:00 | 2023-05-03T13:45:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008110_002 | Dismissed | Unplanned | Production unavailability | 2023-05-03T13:31:13+00:00 | 2023-05-03T11:51:00+00:00 | 2023-05-03T15:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008110_001 | Dismissed | Unplanned | Production unavailability | 2023-05-03T12:20:27+00:00 | 2023-05-03T11:51:00+00:00 | 2023-05-03T14:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000007968_004 | Inactive | Unplanned | Production unavailability | 2023-02-25T23:02:31+00:00 | 2023-02-22T02:59:00+00:00 | 2023-02-25T22:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000007968_003 | Dismissed | Unplanned | Production unavailability | 2023-02-24T16:42:33+00:00 | 2023-02-22T02:59:00+00:00 | 2023-02-25T22:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000007968_002 | Dismissed | Unplanned | Production unavailability | 2023-02-22T12:53:05+00:00 | 2023-02-22T02:59:00+00:00 | 2023-02-25T18:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000007968_001 | Dismissed | Unplanned | Production unavailability | 2023-02-22T03:26:20+00:00 | 2023-02-22T02:59:00+00:00 | 2023-02-22T17:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000007816_003 | Inactive | Unplanned | Production unavailability | 2022-12-23T14:17:31+00:00 | 2022-12-23T11:51:00+00:00 | 2022-12-23T13:15:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000007816_002 | Dismissed | Unplanned | Production unavailability | 2022-12-23T13:14:48+00:00 | 2022-12-23T11:51:00+00:00 | 2022-12-23T13:15:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000007816_001 | Dismissed | Unplanned | Production unavailability | 2022-12-23T12:19:34+00:00 | 2022-12-23T11:51:00+00:00 | 2022-12-23T14:00:00+00:00 | MW | 64 | 0 | 64 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006861_003 | Dismissed | Planned | Production unavailability | 2022-08-04T15:33:14+00:00 | 2023-01-01T00:00:00+00:00 | 2023-01-01T00:01:00+00:00 | MW | 1 | 63 | 64 | Foreseen Maintenance | Testing |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006861_002 | Dismissed | Planned | Production unavailability | 2022-08-04T15:28:29+00:00 | 2023-01-01T00:00:00+00:00 | 2023-01-01T00:01:00+00:00 | MW | 1 | 63 | 64 | Foreseen Maintenance | Testing |
Wind Onshore | 10Y1001A1001A59C |
| CGT | 47W000000000443F | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006861_001 | Dismissed | Planned | Production unavailability | 2022-03-23T11:00:40+00:00 | 2023-01-01T00:00:00+00:00 | 2023-01-01T00:01:00+00:00 | MW | 1 | 63 | 64 | Foreseen Maintenance | Testing |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010702_002 | Dismissed | Planned | Production unavailability | 2025-11-25T14:02:45+00:00 | 2025-11-25T14:00:00+00:00 | 2025-11-25T14:15:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010702_001 | Dismissed | Planned | Production unavailability | 2025-11-25T13:59:14+00:00 | 2025-11-25T14:00:00+00:00 | 2025-11-25T14:15:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010639_006 | Inactive | Unplanned | Production unavailability | 2025-10-30T19:02:32+00:00 | 2025-10-24T12:03:00+00:00 | 2025-10-30T18:00:00+00:00 | MW | 101 | 0 | 101 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010639_005 | Dismissed | Unplanned | Production unavailability | 2025-10-30T16:51:38+00:00 | 2025-10-24T12:03:00+00:00 | 2025-10-30T18:00:00+00:00 | MW | 101 | 0 | 101 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010639_004 | Dismissed | Unplanned | Production unavailability | 2025-10-29T11:46:11+00:00 | 2025-10-24T12:03:00+00:00 | 2025-10-30T17:00:00+00:00 | MW | 101 | 0 | 101 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010639_003 | Dismissed | Unplanned | Production unavailability | 2025-10-24T16:16:56+00:00 | 2025-10-24T12:03:00+00:00 | 2025-10-29T12:00:00+00:00 | MW | 101 | 0 | 101 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010639_002 | Dismissed | Unplanned | Production unavailability | 2025-10-24T12:57:35+00:00 | 2025-10-24T12:03:00+00:00 | 2025-10-24T19:00:00+00:00 | MW | 101 | 0 | 101 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010639_001 | Dismissed | Unplanned | Production unavailability | 2025-10-24T12:26:05+00:00 | 2025-10-24T12:03:00+00:00 | 2025-10-24T19:00:00+00:00 | MW | 101 | 0 | 101 | Failure | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010237_013 | Dismissed | Planned | Production unavailability | 2025-09-26T15:08:21+00:00 | 2025-07-21T08:00:00+00:00 | 2025-09-26T16:00:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010237_012 | Dismissed | Planned | Production unavailability | 2025-09-26T14:30:31+00:00 | 2025-07-21T08:00:00+00:00 | 2025-09-26T16:00:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010237_011 | Dismissed | Planned | Production unavailability | 2025-09-26T13:32:20+00:00 | 2025-07-21T08:00:00+00:00 | 2025-09-26T17:00:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010237_010 | Dismissed | Planned | Production unavailability | 2025-09-26T11:53:15+00:00 | 2025-07-21T08:00:00+00:00 | 2025-09-26T13:30:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010237_009 | Dismissed | Planned | Production unavailability | 2025-09-23T14:50:03+00:00 | 2025-07-21T08:00:00+00:00 | 2025-09-26T12:30:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010237_008 | Dismissed | Planned | Production unavailability | 2025-09-15T16:32:12+00:00 | 2025-07-21T08:00:00+00:00 | 2025-09-25T17:00:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010237_007 | Dismissed | Planned | Production unavailability | 2025-08-27T08:03:21+00:00 | 2025-07-21T08:00:00+00:00 | 2025-09-29T17:00:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010237_006 | Dismissed | Planned | Production unavailability | 2025-07-17T14:15:40+00:00 | 2025-07-21T08:00:00+00:00 | 2025-09-22T17:00:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010237_005 | Dismissed | Planned | Production unavailability | 2025-07-17T10:00:53+00:00 | 2025-07-21T09:00:00+00:00 | 2025-09-22T17:00:00+00:00 | MW | 101 | 0 | 101 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |