Last update at: 2024-05-17T19:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 5 6 7 8 9 > | ||||||||||||||||||
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008496_001 | Dismissed | Planned | Production unavailability | 2023-10-09T17:40:13+01:00 | 2023-10-10T09:01:00+01:00 | 2023-10-10T19:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008495_004 | Inactive | Planned | Production unavailability | 2023-10-10T12:02:31+01:00 | 2023-10-09T21:01:00+01:00 | 2023-10-10T11:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008495_003 | Dismissed | Planned | Production unavailability | 2023-10-10T09:01:13+01:00 | 2023-10-09T21:01:00+01:00 | 2023-10-10T11:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008495_002 | Dismissed | Planned | Production unavailability | 2023-10-10T07:04:53+01:00 | 2023-10-09T21:01:00+01:00 | 2023-10-10T10:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008495_001 | Dismissed | Planned | Production unavailability | 2023-10-09T17:36:09+01:00 | 2023-10-09T21:01:00+01:00 | 2023-10-10T09:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008478_008 | Inactive | Planned | Production unavailability | 2023-10-09T22:02:32+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-09T21:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008478_007 | Dismissed | Planned | Production unavailability | 2023-10-09T17:07:19+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-09T21:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008478_006 | Dismissed | Planned | Production unavailability | 2023-10-08T18:27:18+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-09T19:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008478_005 | Dismissed | Planned | Production unavailability | 2023-10-08T08:56:41+01:00 | 2023-10-09T08:01:00+01:00 | 2023-10-10T12:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008478_004 | Dismissed | Planned | Production unavailability | 2023-10-08T08:56:16+01:00 | 2023-10-09T08:00:00+01:00 | 2023-10-10T12:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008478_003 | Dismissed | Planned | Production unavailability | 2023-10-08T02:11:12+01:00 | 2023-10-08T13:31:00+01:00 | 2023-10-10T12:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008478_002 | Dismissed | Planned | Production unavailability | 2023-10-06T15:47:27+01:00 | 2023-10-08T08:01:00+01:00 | 2023-10-10T12:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008478_001 | Dismissed | Planned | Production unavailability | 2023-10-04T17:30:15+01:00 | 2023-10-08T08:01:00+01:00 | 2023-10-08T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008490_004 | Inactive | Planned | Production unavailability | 2023-10-09T09:02:32+01:00 | 2023-10-08T00:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008490_003 | Dismissed | Planned | Production unavailability | 2023-10-08T08:57:21+01:00 | 2023-10-08T00:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008490_002 | Dismissed | Planned | Production unavailability | 2023-10-08T06:54:00+01:00 | 2023-10-08T00:01:00+01:00 | 2023-10-08T13:30:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008490_001 | Dismissed | Planned | Production unavailability | 2023-10-07T23:22:46+01:00 | 2023-10-08T00:01:00+01:00 | 2023-10-10T12:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008483_006 | Dismissed | Planned | Production unavailability | 2023-10-06T21:30:39+01:00 | 2023-10-06T20:30:00+01:00 | 2023-10-08T08:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008483_005 | Dismissed | Planned | Production unavailability | 2023-10-06T20:00:38+01:00 | 2023-10-06T20:30:00+01:00 | 2023-10-08T08:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008483_004 | Dismissed | Planned | Production unavailability | 2023-10-06T18:30:58+01:00 | 2023-10-06T20:01:00+01:00 | 2023-10-08T08:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008483_003 | Dismissed | Planned | Production unavailability | 2023-10-06T17:00:44+01:00 | 2023-10-06T19:01:00+01:00 | 2023-10-08T08:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008483_002 | Dismissed | Planned | Production unavailability | 2023-10-06T15:45:59+01:00 | 2023-10-06T18:01:00+01:00 | 2023-10-08T08:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008483_001 | Dismissed | Planned | Production unavailability | 2023-10-05T17:12:26+01:00 | 2023-10-06T17:01:00+01:00 | 2023-10-08T08:00:00+01:00 | MW | 208 | 150 | 358 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008465_009 | Inactive | Planned | Production unavailability | 2023-10-06T21:02:32+01:00 | 2023-10-04T08:00:00+01:00 | 2023-10-06T20:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008465_008 | Dismissed | Planned | Production unavailability | 2023-10-06T18:30:25+01:00 | 2023-10-04T08:00:00+01:00 | 2023-10-06T20:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008465_007 | Dismissed | Planned | Production unavailability | 2023-10-06T17:00:18+01:00 | 2023-10-04T08:00:00+01:00 | 2023-10-06T19:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008465_006 | Dismissed | Planned | Production unavailability | 2023-10-06T15:44:41+01:00 | 2023-10-04T08:00:00+01:00 | 2023-10-06T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008465_005 | Dismissed | Planned | Production unavailability | 2023-10-06T15:44:02+01:00 | 2023-10-04T08:00:00+01:00 | 2023-10-06T19:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008465_004 | Dismissed | Planned | Production unavailability | 2023-10-05T17:10:33+01:00 | 2023-10-04T08:00:00+01:00 | 2023-10-06T17:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008465_003 | Dismissed | Planned | Production unavailability | 2023-10-04T17:27:06+01:00 | 2023-10-04T08:00:00+01:00 | 2023-10-06T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008465_002 | Dismissed | Planned | Production unavailability | 2023-10-03T14:29:42+01:00 | 2023-10-04T08:00:00+01:00 | 2023-10-05T17:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008465_001 | Dismissed | Planned | Production unavailability | 2023-10-01T12:42:44+01:00 | 2023-10-05T08:00:00+01:00 | 2023-10-05T17:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008419_006 | Inactive | Planned | Production unavailability | 2023-10-02T19:02:32+01:00 | 2023-10-02T09:00:00+01:00 | 2023-10-02T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008419_005 | Dismissed | Planned | Production unavailability | 2023-10-02T16:06:41+01:00 | 2023-10-02T09:00:00+01:00 | 2023-10-02T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008419_004 | Dismissed | Planned | Production unavailability | 2023-10-01T11:37:18+01:00 | 2023-10-02T09:00:00+01:00 | 2023-10-02T17:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008419_003 | Dismissed | Planned | Production unavailability | 2023-09-28T20:54:16+01:00 | 2023-10-01T17:01:00+01:00 | 2023-10-05T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008419_002 | Dismissed | Planned | Production unavailability | 2023-09-25T11:21:53+01:00 | 2023-10-02T08:01:00+01:00 | 2023-10-05T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008419_001 | Dismissed | Planned | Production unavailability | 2023-09-15T13:02:36+01:00 | 2023-10-02T08:01:00+01:00 | 2023-10-05T18:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008462_003 | Dismissed | Planned | Production unavailability | 2023-09-30T14:32:44+01:00 | 2023-09-30T17:01:00+01:00 | 2023-10-01T17:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008462_002 | Dismissed | Planned | Production unavailability | 2023-09-30T12:35:58+01:00 | 2023-09-30T17:01:00+01:00 | 2023-10-01T17:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008462_001 | Dismissed | Planned | Production unavailability | 2023-09-29T13:23:45+01:00 | 2023-09-30T15:01:00+01:00 | 2023-10-01T17:00:00+01:00 | MW | 150 | 208 | 358 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008460_002 | Inactive | Planned | Production unavailability | 2023-09-29T13:03:45+01:00 | 2023-09-29T09:01:00+01:00 | 2023-09-29T13:01:00+01:00 | MW | 150 | 208 | 358 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008460_001 | Dismissed | Planned | Production unavailability | 2023-09-28T20:57:26+01:00 | 2023-09-29T09:01:00+01:00 | 2023-10-01T17:00:00+01:00 | MW | 150 | 208 | 358 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008418_002 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:18+01:00 | 2023-08-31T07:01:00+01:00 | 2023-10-02T08:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008418_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:59:51+01:00 | 2023-08-31T07:01:00+01:00 | 2023-10-02T08:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008398_004 | Dismissed | Planned | Production unavailability | 2023-09-11T10:46:21+01:00 | 2023-09-11T09:32:00+01:00 | 2023-09-30T09:30:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008398_003 | Dismissed | Planned | Production unavailability | 2023-09-11T09:49:51+01:00 | 2023-09-11T09:32:00+01:00 | 2023-09-30T09:30:00+01:00 | MW | 120 | 238 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008398_002 | Dismissed | Planned | Production unavailability | 2023-09-11T09:46:14+01:00 | 2023-09-11T09:32:00+01:00 | 2023-09-30T09:30:00+01:00 | MW | 100 | 258 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008398_001 | Dismissed | Planned | Production unavailability | 2023-09-11T09:40:28+01:00 | 2023-09-11T09:32:00+01:00 | 2023-09-30T09:30:00+01:00 | MW | 130 | 228 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008382_004 | Inactive | Planned | Production unavailability | 2023-09-03T05:02:32+01:00 | 2023-09-02T23:01:00+01:00 | 2023-09-03T03:59:00+01:00 | MW | 68 | 290 | 358 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |