Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 4 5 6 7 8 > | ||||||||||||||||||
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008731_001 | Dismissed | Unplanned | Production unavailability | 2023-12-31T06:21:15+00:00 | 2023-12-31T06:20:00+00:00 | 2024-01-02T08:00:00+00:00 | MW | 127 | 231 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008704_004 | Inactive | Unplanned | Production unavailability | 2023-12-18T14:02:31+00:00 | 2023-12-15T18:30:00+00:00 | 2023-12-18T13:00:00+00:00 | MW | 103 | 255 | 358 | Failure | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008704_003 | Dismissed | Unplanned | Production unavailability | 2023-12-17T23:19:54+00:00 | 2023-12-15T18:30:00+00:00 | 2023-12-18T13:00:00+00:00 | MW | 103 | 255 | 358 | Failure | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008704_002 | Dismissed | Unplanned | Production unavailability | 2023-12-17T14:41:36+00:00 | 2023-12-15T18:30:00+00:00 | 2023-12-17T23:59:00+00:00 | MW | 103 | 255 | 358 | Failure | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008704_001 | Dismissed | Unplanned | Production unavailability | 2023-12-15T18:34:24+00:00 | 2023-12-15T18:30:00+00:00 | 2023-12-17T18:00:00+00:00 | MW | 103 | 255 | 358 | Failure | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008703_004 | Inactive | Unplanned | Production unavailability | 2023-12-15T17:32:32+00:00 | 2023-12-15T11:00:00+00:00 | 2023-12-15T16:30:00+00:00 | MW | 108 | 250 | 358 | Failure | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008703_003 | Dismissed | Unplanned | Production unavailability | 2023-12-15T11:15:31+00:00 | 2023-12-15T11:00:00+00:00 | 2023-12-15T16:30:00+00:00 | MW | 108 | 250 | 358 | Failure | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008703_002 | Dismissed | Unplanned | Production unavailability | 2023-12-15T11:13:18+00:00 | 2023-12-15T11:00:00+00:00 | 2023-12-15T16:30:00+00:00 | MW | 100 | 258 | 358 | Failure | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008703_001 | Dismissed | Unplanned | Production unavailability | 2023-12-15T11:04:35+00:00 | 2023-12-15T11:00:00+00:00 | 2023-12-15T23:00:00+00:00 | MW | 120 | 238 | 358 | Failure | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008687_002 | Inactive | Unplanned | Production unavailability | 2023-12-08T08:32:36+00:00 | 2023-12-08T04:29:00+00:00 | 2023-12-08T07:30:00+00:00 | MW | 108 | 250 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008687_001 | Dismissed | Unplanned | Production unavailability | 2023-12-08T04:40:16+00:00 | 2023-12-08T04:29:00+00:00 | 2023-12-08T07:30:00+00:00 | MW | 108 | 250 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008428_003 | Active | Planned | Production unavailability | 2023-12-07T12:02:42+00:00 | 2024-08-13T08:00:00+01:00 | 2024-08-13T16:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008428_002 | Dismissed | Planned | Production unavailability | 2023-12-07T12:01:43+00:00 | 2024-08-12T08:00:00+01:00 | 2024-08-12T16:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008428_001 | Dismissed | Planned | Production unavailability | 2023-09-20T01:00:41+01:00 | 2024-08-13T08:00:00+01:00 | 2024-08-13T16:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008671_004 | Inactive | Unplanned | Production unavailability | 2023-12-07T10:02:33+00:00 | 2023-12-07T00:38:00+00:00 | 2023-12-07T09:00:00+00:00 | MW | 108 | 250 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008671_003 | Dismissed | Unplanned | Production unavailability | 2023-12-07T06:59:11+00:00 | 2023-12-07T00:38:00+00:00 | 2023-12-07T09:00:00+00:00 | MW | 108 | 250 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008671_002 | Dismissed | Unplanned | Production unavailability | 2023-12-07T01:56:05+00:00 | 2023-12-07T00:38:00+00:00 | 2023-12-07T08:00:00+00:00 | MW | 108 | 250 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008671_001 | Dismissed | Unplanned | Production unavailability | 2023-12-07T01:49:31+00:00 | 2023-12-07T00:53:00+00:00 | 2023-12-07T08:00:00+00:00 | MW | 108 | 250 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008659_009 | Dismissed | Unplanned | Production unavailability | 2023-12-06T21:01:56+00:00 | 2023-12-05T09:24:00+00:00 | 2023-12-06T20:30:00+00:00 | MW | 128 | 230 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008659_008 | Dismissed | Unplanned | Production unavailability | 2023-12-06T19:00:48+00:00 | 2023-12-05T09:24:00+00:00 | 2023-12-06T20:30:00+00:00 | MW | 128 | 230 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008659_007 | Dismissed | Unplanned | Production unavailability | 2023-12-06T16:35:49+00:00 | 2023-12-05T09:24:00+00:00 | 2023-12-06T19:30:00+00:00 | MW | 128 | 230 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008659_006 | Dismissed | Unplanned | Production unavailability | 2023-12-06T14:18:27+00:00 | 2023-12-05T09:24:00+00:00 | 2023-12-06T17:00:00+00:00 | MW | 128 | 230 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008659_005 | Dismissed | Unplanned | Production unavailability | 2023-12-06T00:49:00+00:00 | 2023-12-05T09:24:00+00:00 | 2023-12-06T15:30:00+00:00 | MW | 128 | 230 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008659_004 | Dismissed | Unplanned | Production unavailability | 2023-12-05T23:04:43+00:00 | 2023-12-05T09:24:00+00:00 | 2023-12-06T15:30:00+00:00 | MW | 158 | 200 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008659_003 | Dismissed | Unplanned | Production unavailability | 2023-12-05T14:15:39+00:00 | 2023-12-05T09:24:00+00:00 | 2023-12-06T15:30:00+00:00 | MW | 138 | 220 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008659_002 | Dismissed | Unplanned | Production unavailability | 2023-12-05T14:09:32+00:00 | 2023-12-05T09:24:00+00:00 | 2023-12-06T15:30:00+00:00 | MW | 170 | 188 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008659_001 | Dismissed | Unplanned | Production unavailability | 2023-12-05T09:31:09+00:00 | 2023-12-05T09:24:00+00:00 | 2023-12-06T21:00:00+00:00 | MW | 170 | 188 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008661_003 | Dismissed | Planned | Production unavailability | 2023-12-05T23:03:44+00:00 | 2023-12-05T20:01:00+00:00 | 2023-12-06T21:00:00+00:00 | MW | 138 | 220 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008661_002 | Dismissed | Planned | Production unavailability | 2023-12-05T14:15:54+00:00 | 2023-12-05T20:01:00+00:00 | 2023-12-06T21:00:00+00:00 | MW | 138 | 220 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008661_001 | Dismissed | Planned | Production unavailability | 2023-12-05T14:11:10+00:00 | 2023-12-05T20:01:00+00:00 | 2023-12-06T21:00:00+00:00 | MW | 170 | 188 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008657_004 | Inactive | Planned | Production unavailability | 2023-12-05T22:02:33+00:00 | 2023-12-05T15:31:00+00:00 | 2023-12-05T21:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008657_003 | Dismissed | Planned | Production unavailability | 2023-12-05T20:24:15+00:00 | 2023-12-05T15:31:00+00:00 | 2023-12-05T21:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008657_002 | Dismissed | Planned | Production unavailability | 2023-12-05T19:55:33+00:00 | 2023-12-05T15:31:00+00:00 | 2023-12-05T20:30:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008657_001 | Dismissed | Planned | Production unavailability | 2023-12-04T20:08:06+00:00 | 2023-12-05T15:31:00+00:00 | 2023-12-05T20:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008622_004 | Inactive | Planned | Production unavailability | 2023-12-04T23:02:31+00:00 | 2023-12-04T09:01:00+00:00 | 2023-12-04T22:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008622_003 | Dismissed | Planned | Production unavailability | 2023-12-04T21:04:03+00:00 | 2023-12-04T09:01:00+00:00 | 2023-12-04T22:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008622_002 | Dismissed | Planned | Production unavailability | 2023-12-04T20:06:37+00:00 | 2023-12-04T09:01:00+00:00 | 2023-12-04T21:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008622_001 | Dismissed | Planned | Production unavailability | 2023-11-25T13:58:08+00:00 | 2023-12-04T09:01:00+00:00 | 2023-12-05T13:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008621_005 | Inactive | Planned | Production unavailability | 2023-12-02T19:02:33+00:00 | 2023-12-02T09:50:00+00:00 | 2023-12-02T18:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008621_004 | Dismissed | Planned | Production unavailability | 2023-12-02T16:31:23+00:00 | 2023-12-02T09:50:00+00:00 | 2023-12-02T18:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008621_003 | Dismissed | Planned | Production unavailability | 2023-12-02T09:49:12+00:00 | 2023-12-02T09:50:00+00:00 | 2023-12-02T17:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008621_002 | Dismissed | Planned | Production unavailability | 2023-12-02T08:01:18+00:00 | 2023-12-02T10:30:00+00:00 | 2023-12-02T17:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008621_001 | Dismissed | Planned | Production unavailability | 2023-11-25T13:55:56+00:00 | 2023-12-02T08:01:00+00:00 | 2023-12-02T17:00:00+00:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008502_003 | Inactive | Unplanned | Production unavailability | 2023-10-20T11:02:32+01:00 | 2023-10-20T00:45:00+01:00 | 2023-10-20T10:00:00+01:00 | MW | 150 | 208 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008502_002 | Dismissed | Unplanned | Production unavailability | 2023-10-20T06:31:28+01:00 | 2023-10-20T00:45:00+01:00 | 2023-10-20T10:00:00+01:00 | MW | 150 | 208 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008502_001 | Dismissed | Unplanned | Production unavailability | 2023-10-20T00:46:09+01:00 | 2023-10-20T00:45:00+01:00 | 2023-10-20T10:00:00+01:00 | MW | 140 | 218 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008496_005 | Inactive | Planned | Production unavailability | 2023-10-10T22:02:32+01:00 | 2023-10-10T11:00:00+01:00 | 2023-10-10T21:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008496_004 | Dismissed | Planned | Production unavailability | 2023-10-10T16:47:25+01:00 | 2023-10-10T11:00:00+01:00 | 2023-10-10T21:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008496_003 | Dismissed | Planned | Production unavailability | 2023-10-10T08:59:43+01:00 | 2023-10-10T11:00:00+01:00 | 2023-10-10T19:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008496_002 | Dismissed | Planned | Production unavailability | 2023-10-10T07:05:13+01:00 | 2023-10-10T10:01:00+01:00 | 2023-10-10T19:00:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |