Last update at: 2026-01-12T11:00:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 1 2 3 4 5 > | ||||||||||||||||||
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010079_004 | Dismissed | Planned | Production unavailability | 2025-04-26T08:05:50+00:00 | 2025-04-22T09:00:00+00:00 | 2025-04-28T09:00:00+00:00 | MW | 58 | 28 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010079_003 | Dismissed | Planned | Production unavailability | 2025-04-25T12:05:08+00:00 | 2025-04-22T09:00:00+00:00 | 2025-04-28T09:00:00+00:00 | MW | 75 | 11 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010079_002 | Dismissed | Planned | Production unavailability | 2025-04-24T16:51:57+00:00 | 2025-04-22T09:00:00+00:00 | 2025-04-28T09:00:00+00:00 | MW | 58 | 28 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010079_001 | Dismissed | Planned | Production unavailability | 2025-04-18T11:42:11+00:00 | 2025-04-22T09:00:00+00:00 | 2025-04-25T09:00:00+00:00 | MW | 68 | 18 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010078_002 | Inactive | Planned | Production unavailability | 2025-04-22T10:02:32+00:00 | 2025-04-19T09:00:00+00:00 | 2025-04-22T09:00:00+00:00 | MW | 64 | 22 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010078_001 | Dismissed | Planned | Production unavailability | 2025-04-18T11:37:42+00:00 | 2025-04-19T09:00:00+00:00 | 2025-04-22T09:00:00+00:00 | MW | 64 | 22 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_016 | Inactive | Planned | Production unavailability | 2025-04-19T10:02:32+00:00 | 2025-04-10T17:41:00+00:00 | 2025-04-19T09:00:00+00:00 | MW | 53 | 33 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_015 | Dismissed | Planned | Production unavailability | 2025-04-18T11:37:29+00:00 | 2025-04-10T17:41:00+00:00 | 2025-04-19T09:00:00+00:00 | MW | 53 | 33 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_014 | Dismissed | Planned | Production unavailability | 2025-04-17T20:06:21+00:00 | 2025-04-10T17:41:00+00:00 | 2025-04-21T17:00:00+00:00 | MW | 53 | 33 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_013 | Dismissed | Planned | Production unavailability | 2025-04-15T19:19:24+00:00 | 2025-04-10T17:41:00+00:00 | 2025-04-19T17:00:00+00:00 | MW | 53 | 33 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_012 | Dismissed | Planned | Production unavailability | 2025-04-14T15:59:51+00:00 | 2025-04-10T17:41:00+00:00 | 2025-04-16T17:00:00+00:00 | MW | 53 | 33 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_011 | Dismissed | Planned | Production unavailability | 2025-04-14T10:58:35+00:00 | 2025-04-10T17:41:00+00:00 | 2025-04-16T17:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_010 | Dismissed | Planned | Production unavailability | 2025-04-11T11:17:09+00:00 | 2025-04-10T17:41:00+00:00 | 2025-04-14T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_009 | Dismissed | Planned | Production unavailability | 2025-04-10T18:13:31+00:00 | 2025-04-10T17:41:00+00:00 | 2025-04-11T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_008 | Dismissed | Planned | Production unavailability | 2025-04-10T18:06:12+00:00 | 2025-04-10T17:40:00+00:00 | 2025-04-11T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_007 | Dismissed | Planned | Production unavailability | 2025-04-10T17:57:32+00:00 | 2025-04-10T17:39:27+00:00 | 2025-04-11T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_006 | Dismissed | Planned | Production unavailability | 2025-04-10T17:54:24+00:00 | 2025-04-10T17:39:27+00:00 | 2025-04-11T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_005 | Dismissed | Planned | Production unavailability | 2025-04-10T17:49:35+00:00 | 2025-04-10T17:39:27+00:00 | 2025-04-11T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_004 | Dismissed | Planned | Production unavailability | 2025-04-10T17:46:12+00:00 | 2025-04-10T17:39:27+00:00 | 2025-04-11T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_003 | Dismissed | Planned | Production unavailability | 2025-04-10T17:44:35+00:00 | 2025-04-10T17:39:27+00:00 | 2025-04-11T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_002 | Dismissed | Planned | Production unavailability | 2025-04-10T17:42:23+00:00 | 2025-04-10T17:39:27+00:00 | 2025-04-11T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010054_001 | Dismissed | Planned | Production unavailability | 2025-04-10T17:41:01+00:00 | 2025-04-10T17:39:27+00:00 | 2025-04-11T16:00:00+00:00 | MW | 46 | 40 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010048_005 | Inactive | Unplanned | Production unavailability | 2025-04-10T18:47:33+00:00 | 2025-04-09T17:11:48+00:00 | 2025-04-10T17:39:00+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010048_004 | Dismissed | Unplanned | Production unavailability | 2025-04-10T17:38:41+00:00 | 2025-04-09T17:11:48+00:00 | 2025-04-10T17:39:00+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010048_003 | Dismissed | Unplanned | Production unavailability | 2025-04-10T15:34:38+00:00 | 2025-04-09T17:11:48+00:00 | 2025-04-10T18:00:00+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010048_002 | Dismissed | Unplanned | Production unavailability | 2025-04-09T18:42:37+00:00 | 2025-04-09T17:11:48+00:00 | 2025-04-10T16:00:00+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010048_001 | Dismissed | Unplanned | Production unavailability | 2025-04-09T17:12:27+00:00 | 2025-04-09T17:11:48+00:00 | 2025-04-09T20:30:00+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010045_006 | Inactive | Planned | Production unavailability | 2025-04-09T18:17:32+00:00 | 2025-04-09T15:20:39+00:00 | 2025-04-09T17:11:00+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010045_005 | Dismissed | Planned | Production unavailability | 2025-04-09T17:10:27+00:00 | 2025-04-09T15:20:39+00:00 | 2025-04-09T17:11:00+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010045_004 | Dismissed | Planned | Production unavailability | 2025-04-09T16:26:10+00:00 | 2025-04-09T15:20:39+00:00 | 2025-04-09T20:30:00+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010045_003 | Dismissed | Planned | Production unavailability | 2025-04-09T16:21:21+00:00 | 2025-04-09T15:20:39+00:00 | 2025-04-09T20:30:47+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010045_002 | Dismissed | Planned | Production unavailability | 2025-04-09T16:07:06+00:00 | 2025-04-09T15:20:39+00:00 | 2025-04-09T19:30:47+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010045_001 | Dismissed | Planned | Production unavailability | 2025-04-09T16:00:14+00:00 | 2025-04-09T15:20:39+00:00 | 2025-04-09T19:30:47+00:00 | MW | 86 | 0 | 86 | Failure | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010039_004 | Inactive | Planned | Production unavailability | 2025-04-09T15:59:19+00:00 | 2025-04-05T15:00:22+00:00 | 2025-04-12T18:00:01+00:00 | MW | 22 | 64 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010039_003 | Dismissed | Planned | Production unavailability | 2025-04-09T15:59:07+00:00 | 2025-04-05T15:00:22+00:00 | 2025-04-12T18:00:01+00:00 | MW | 22 | 64 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010039_002 | Dismissed | Planned | Production unavailability | 2025-04-09T15:56:55+00:00 | 2025-04-05T15:00:22+00:00 | 2025-04-09T17:20:01+00:00 | MW | 22 | 64 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000010039_001 | Dismissed | Planned | Production unavailability | 2025-04-05T18:15:15+00:00 | 2025-04-05T15:00:22+00:00 | 2025-04-12T18:00:01+00:00 | MW | 22 | 64 | 86 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009733_002 | Dismissed | Unplanned | Production unavailability | 2024-12-13T11:37:33+00:00 | 2024-12-13T11:32:00+00:00 | 2024-12-13T11:36:00+00:00 | MW | 0 | 15 | 15 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009733_001 | Dismissed | Unplanned | Production unavailability | 2024-12-13T11:33:17+00:00 | 2024-12-13T11:32:00+00:00 | 2024-12-13T11:36:00+00:00 | MW | 1 | 14 | 15 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009063_002 | Dismissed | Planned | Production unavailability | 2024-05-08T10:08:03+00:00 | 2024-05-03T13:28:00+00:00 | 2024-05-24T08:00:00+00:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009063_001 | Dismissed | Planned | Production unavailability | 2024-05-03T13:28:41+00:00 | 2024-05-03T13:28:00+00:00 | 2024-05-17T08:00:00+00:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009028_002 | Dismissed | Planned | Production unavailability | 2024-04-17T16:54:52+00:00 | 2024-04-17T16:45:00+00:00 | 2024-04-17T16:50:00+00:00 | MW | 0 | 9 | 9 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009028_001 | Dismissed | Planned | Production unavailability | 2024-04-17T16:43:16+00:00 | 2024-04-17T16:45:00+00:00 | 2024-04-17T16:50:00+00:00 | MW | 9 | 0 | 9 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009021_003 | Dismissed | Planned | Production unavailability | 2024-04-16T14:05:58+00:00 | 2024-04-16T13:00:00+00:00 | 2024-04-16T14:00:00+00:00 | MW | 0 | 10 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009021_002 | Dismissed | Planned | Production unavailability | 2024-04-16T13:33:19+00:00 | 2024-04-16T13:00:00+00:00 | 2024-04-16T14:00:00+00:00 | MW | 10 | 0 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009021_001 | Dismissed | Planned | Production unavailability | 2024-04-16T13:00:49+00:00 | 2024-04-16T13:00:00+00:00 | 2024-04-16T13:30:00+00:00 | MW | 10 | 0 | 10 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009062_002 | Dismissed | Planned | Production unavailability | 2024-05-08T10:08:19+00:00 | 2024-05-03T13:27:00+00:00 | 2024-05-24T08:00:00+00:00 | MW | 108 | 0 | 108 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009062_001 | Dismissed | Planned | Production unavailability | 2024-05-03T13:27:43+00:00 | 2024-05-03T13:27:00+00:00 | 2024-05-17T08:00:00+00:00 | MW | 108 | 0 | 108 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008955_003 | Dismissed | Planned | Production unavailability | 2024-03-22T11:46:50+00:00 | 2024-03-22T10:30:00+00:00 | 2024-03-22T11:30:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008955_002 | Dismissed | Planned | Production unavailability | 2024-03-22T11:10:29+00:00 | 2024-03-22T10:30:00+00:00 | 2024-03-22T11:30:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |