Last update at: 2023-03-23T13:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 4 5 6 7 8 > | ||||||||||||||||||
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005311_001 | Dismissed | Unplanned | Production unavailability | 2020-09-23T11:22:17+01:00 | 2020-09-23T11:00:00+01:00 | 2020-09-23T14:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004896_004 | Dismissed | Planned | Production unavailability | 2020-09-14T10:51:01+01:00 | 2021-10-02T00:00:00+01:00 | 2021-10-09T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004896_003 | Dismissed | Planned | Production unavailability | 2020-06-15T21:31:24+01:00 | 2021-10-02T00:00:00+01:00 | 2021-10-09T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004896_002 | Dismissed | Planned | Production unavailability | 2019-12-17T09:14:14+00:00 | 2021-09-18T00:00:00+01:00 | 2021-09-25T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000004896_001 | Dismissed | Planned | Production unavailability | 2019-12-17T09:11:11+00:00 | 2021-10-02T00:00:00+01:00 | 2021-10-09T00:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005220_002 | Inactive | Unplanned | Production unavailability | 2020-08-05T13:01:53+01:00 | 2020-08-05T09:28:00+01:00 | 2020-08-05T12:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Boiler |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005220_001 | Dismissed | Unplanned | Production unavailability | 2020-08-05T10:28:27+01:00 | 2020-08-05T09:28:00+01:00 | 2020-08-05T12:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Boiler |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005211_007 | Inactive | Unplanned | Production unavailability | 2020-08-04T01:01:53+01:00 | 2020-07-30T06:30:00+01:00 | 2020-08-03T23:59:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005211_006 | Dismissed | Unplanned | Production unavailability | 2020-08-03T18:56:52+01:00 | 2020-07-30T06:30:00+01:00 | 2020-08-03T23:59:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005211_005 | Dismissed | Unplanned | Production unavailability | 2020-08-03T09:06:47+01:00 | 2020-07-30T06:30:00+01:00 | 2020-08-04T23:59:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005211_004 | Dismissed | Unplanned | Production unavailability | 2020-07-30T16:49:49+01:00 | 2020-07-30T06:30:00+01:00 | 2020-08-03T23:59:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005211_003 | Dismissed | Unplanned | Production unavailability | 2020-07-30T13:40:06+01:00 | 2020-07-30T06:30:00+01:00 | 2020-07-30T22:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005211_002 | Dismissed | Unplanned | Production unavailability | 2020-07-30T10:00:13+01:00 | 2020-07-30T06:30:00+01:00 | 2020-07-30T16:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005211_001 | Dismissed | Unplanned | Production unavailability | 2020-07-30T07:58:54+01:00 | 2020-07-30T06:30:00+01:00 | 2020-07-30T09:20:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005175_002 | Inactive | Unplanned | Production unavailability | 2020-06-18T22:47:33+01:00 | 2020-06-18T19:07:00+01:00 | 2020-06-18T21:37:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000005175_001 | Dismissed | Unplanned | Production unavailability | 2020-06-18T19:51:41+01:00 | 2020-06-18T19:07:00+01:00 | 2020-06-18T21:37:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000007495_002 | Inactive | Planned | Production unavailability | 2022-08-19T18:02:33+01:00 | 2022-08-15T08:00:00+01:00 | 2022-08-19T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000007495_001 | Dismissed | Planned | Production unavailability | 2022-08-11T16:21:02+01:00 | 2022-08-15T08:00:00+01:00 | 2022-08-19T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006891_002 | Inactive | Unplanned | Production unavailability | 2022-04-07T18:01:52+01:00 | 2022-04-07T14:30:00+01:00 | 2022-04-07T17:00:00+01:00 | MW | 15 | 85 | 100 | Failure | Plant Fault - Electrical Equipment |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006891_001 | Dismissed | Unplanned | Production unavailability | 2022-04-07T14:49:05+01:00 | 2022-04-07T14:30:00+01:00 | 2022-04-07T17:00:00+01:00 | MW | 15 | 85 | 100 | Failure | Plant Fault - Electrical Equipment |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006475_002 | Inactive | Planned | Production unavailability | 2021-12-01T17:01:52+00:00 | 2021-12-01T08:00:00+00:00 | 2021-12-01T16:00:00+00:00 | MW | 15 | 85 | 100 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006475_001 | Dismissed | Planned | Production unavailability | 2021-11-29T10:20:59+00:00 | 2021-12-01T08:00:00+00:00 | 2021-12-01T16:00:00+00:00 | MW | 15 | 85 | 100 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006448_002 | Inactive | Planned | Production unavailability | 2021-11-27T03:01:54+00:00 | 2021-11-26T18:00:00+00:00 | 2021-11-27T02:00:00+00:00 | MW | 73 | 27 | 100 | Foreseen Maintenance | Testing |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006448_001 | Dismissed | Planned | Production unavailability | 2021-11-25T09:16:57+00:00 | 2021-11-26T18:00:00+00:00 | 2021-11-27T02:00:00+00:00 | MW | 73 | 27 | 100 | Foreseen Maintenance | Testing |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006440_002 | Inactive | Planned | Production unavailability | 2021-11-17T18:31:53+00:00 | 2021-11-17T08:30:00+00:00 | 2021-11-17T17:30:00+00:00 | MW | 13 | 87 | 100 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006440_001 | Dismissed | Planned | Production unavailability | 2021-11-15T15:22:10+00:00 | 2021-11-17T08:30:00+00:00 | 2021-11-17T17:30:00+00:00 | MW | 13 | 87 | 100 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006184_003 | Inactive | Planned | Production unavailability | 2021-08-20T18:02:31+01:00 | 2021-08-17T08:00:00+01:00 | 2021-08-20T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006184_002 | Dismissed | Planned | Production unavailability | 2021-08-16T10:29:44+01:00 | 2021-08-17T08:00:00+01:00 | 2021-08-20T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006184_001 | Dismissed | Planned | Production unavailability | 2021-07-30T15:51:15+01:00 | 2021-08-16T09:00:00+01:00 | 2021-08-20T17:00:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006014_003 | Inactive | Planned | Production unavailability | 2021-04-27T17:31:53+01:00 | 2021-04-26T08:00:00+01:00 | 2021-04-27T16:30:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006014_002 | Dismissed | Planned | Production unavailability | 2021-04-26T09:25:21+01:00 | 2021-04-26T08:00:00+01:00 | 2021-04-27T16:30:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000006014_001 | Dismissed | Planned | Production unavailability | 2021-04-23T10:03:53+01:00 | 2021-04-26T08:00:00+01:00 | 2021-04-27T17:30:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000005205_003 | Inactive | Planned | Production unavailability | 2020-08-19T18:31:50+01:00 | 2020-08-17T08:30:00+01:00 | 2020-08-19T17:30:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000005205_002 | Dismissed | Planned | Production unavailability | 2020-08-19T15:23:22+01:00 | 2020-08-17T08:30:00+01:00 | 2020-08-19T17:30:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Knockacummer | 47W000000000302X | Knockacummer Wind farm |
47X000000000103P | 0000000000000000000005205_001 | Dismissed | Planned | Production unavailability | 2020-07-22T16:42:07+01:00 | 2020-08-17T08:30:00+01:00 | 2020-08-21T16:30:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000007419_002 | Inactive | Planned | Production unavailability | 2022-07-20T18:02:32+01:00 | 2022-07-18T08:00:00+01:00 | 2022-07-20T17:00:00+01:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000007419_001 | Dismissed | Planned | Production unavailability | 2022-07-15T09:35:48+01:00 | 2022-07-18T08:00:00+01:00 | 2022-07-20T17:00:00+01:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006443_003 | Inactive | Planned | Production unavailability | 2021-11-24T18:31:54+00:00 | 2021-11-22T08:30:00+00:00 | 2021-11-24T17:30:00+00:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006443_002 | Dismissed | Planned | Production unavailability | 2021-11-19T17:16:18+00:00 | 2021-11-22T08:30:00+00:00 | 2021-11-24T17:30:00+00:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006443_001 | Dismissed | Planned | Production unavailability | 2021-11-19T10:44:34+00:00 | 2021-11-22T08:30:00+00:00 | 2021-11-26T17:00:00+00:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006409_002 | Inactive | Planned | Production unavailability | 2021-11-09T16:01:53+00:00 | 2021-11-09T08:30:00+00:00 | 2021-11-09T15:00:00+00:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006409_001 | Dismissed | Planned | Production unavailability | 2021-11-05T09:37:12+00:00 | 2021-11-09T08:30:00+00:00 | 2021-11-09T15:00:00+00:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006313_002 | Inactive | Planned | Production unavailability | 2021-10-01T21:02:31+01:00 | 2021-10-01T17:01:00+01:00 | 2021-10-01T20:00:00+01:00 | MW | 13 | 72 | 85 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006313_001 | Dismissed | Planned | Production unavailability | 2021-09-30T09:38:23+01:00 | 2021-10-01T17:01:00+01:00 | 2021-10-01T20:00:00+01:00 | MW | 13 | 72 | 85 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006312_002 | Inactive | Planned | Production unavailability | 2021-10-01T18:02:31+01:00 | 2021-10-01T08:00:00+01:00 | 2021-10-01T17:00:00+01:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006312_001 | Dismissed | Planned | Production unavailability | 2021-09-30T09:37:05+01:00 | 2021-10-01T08:00:00+01:00 | 2021-10-01T17:00:00+01:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006217_004 | Inactive | Unplanned | Production unavailability | 2021-09-04T17:02:31+01:00 | 2021-07-22T17:15:00+01:00 | 2021-09-04T16:00:00+01:00 | MW | 85 | 0 | 85 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006217_003 | Dismissed | Unplanned | Production unavailability | 2021-08-23T15:46:01+01:00 | 2021-07-22T17:15:00+01:00 | 2021-09-04T16:00:00+01:00 | MW | 85 | 0 | 85 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006217_002 | Dismissed | Unplanned | Production unavailability | 2021-08-20T17:39:55+01:00 | 2021-07-22T17:15:00+01:00 | 2021-09-03T00:00:00+01:00 | MW | 85 | 0 | 85 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000006217_001 | Dismissed | Unplanned | Production unavailability | 2021-08-16T11:01:30+01:00 | 2021-07-22T17:15:00+01:00 | 2021-08-20T17:00:00+01:00 | MW | 85 | 0 | 85 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |