Last update at: 2025-12-21T18:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 83 84 85 86 87 > | ||||||||||||||||||
| T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009159_002 | Inactive | Planned | Production unavailability | 2024-06-18T18:02:32+00:00 | 2024-06-16T17:00:00+00:00 | 2024-06-18T17:00:00+00:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009160_002 | Inactive | Planned | Production unavailability | 2024-06-18T18:02:32+00:00 | 2024-06-16T17:00:00+00:00 | 2024-06-18T17:00:00+00:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009161_002 | Inactive | Planned | Production unavailability | 2024-06-18T18:02:32+00:00 | 2024-06-16T17:00:00+00:00 | 2024-06-18T17:00:00+00:00 | MW | 108 | 0 | 108 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009162_002 | Inactive | Planned | Production unavailability | 2024-06-18T18:02:32+00:00 | 2024-06-16T17:00:00+00:00 | 2024-06-18T17:00:00+00:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009162_001 | Dismissed | Planned | Production unavailability | 2024-06-16T15:18:15+00:00 | 2024-06-16T17:00:00+00:00 | 2024-06-18T17:00:00+00:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009160_001 | Dismissed | Planned | Production unavailability | 2024-06-16T15:07:07+00:00 | 2024-06-16T17:00:00+00:00 | 2024-06-18T17:00:00+00:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009161_001 | Dismissed | Planned | Production unavailability | 2024-06-16T15:09:39+00:00 | 2024-06-16T17:00:00+00:00 | 2024-06-18T17:00:00+00:00 | MW | 108 | 0 | 108 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009159_001 | Dismissed | Planned | Production unavailability | 2024-06-16T15:04:01+00:00 | 2024-06-16T17:00:00+00:00 | 2024-06-18T17:00:00+00:00 | MW | 112 | 0 | 112 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
| T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008990_002 | Dismissed | Planned | Production unavailability | 2024-06-18T04:40:21+00:00 | 2024-06-24T08:00:00+00:00 | 2024-06-28T18:00:00+00:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_GRGBW-3 | 48W00000GRGBW-3R | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008990_001 | Dismissed | Planned | Production unavailability | 2024-04-05T20:47:15+00:00 | 2024-06-24T08:00:00+00:00 | 2024-06-28T18:00:00+00:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009158_003 | Inactive | Planned | Consumption unavailability | 2024-06-17T03:02:32+00:00 | 2024-06-16T15:00:00+00:00 | 2024-06-17T02:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009158_002 | Dismissed | Planned | Consumption unavailability | 2024-06-16T21:25:21+00:00 | 2024-06-16T15:00:00+00:00 | 2024-06-17T02:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009158_001 | Dismissed | Planned | Consumption unavailability | 2024-06-16T11:10:09+00:00 | 2024-06-16T15:00:00+00:00 | 2024-06-17T00:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009157_003 | Inactive | Planned | Consumption unavailability | 2024-06-17T01:02:32+00:00 | 2024-06-16T13:30:00+00:00 | 2024-06-16T23:59:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009157_002 | Dismissed | Planned | Consumption unavailability | 2024-06-16T21:24:00+00:00 | 2024-06-16T13:30:00+00:00 | 2024-06-16T23:59:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009157_001 | Dismissed | Planned | Consumption unavailability | 2024-06-16T11:02:17+00:00 | 2024-06-16T13:30:00+00:00 | 2024-06-16T22:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_011 | Inactive | Planned | Production unavailability | 2024-06-16T17:02:32+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-16T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_010 | Dismissed | Planned | Production unavailability | 2024-06-14T08:46:40+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-16T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_009 | Dismissed | Planned | Production unavailability | 2024-06-07T10:34:19+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-14T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_008 | Dismissed | Planned | Production unavailability | 2024-05-31T11:21:21+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-07T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_007 | Dismissed | Planned | Production unavailability | 2024-05-28T13:07:42+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-31T16:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_006 | Dismissed | Planned | Production unavailability | 2024-05-27T18:18:29+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-28T21:31:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_005 | Dismissed | Planned | Production unavailability | 2024-05-27T18:18:04+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-28T00:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_004 | Dismissed | Planned | Production unavailability | 2024-05-24T15:30:02+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-27T18:00:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_003 | Dismissed | Planned | Production unavailability | 2024-05-24T15:29:43+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-27T18:00:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_002 | Dismissed | Planned | Production unavailability | 2024-05-24T13:41:57+00:00 | 2024-05-22T13:00:00+00:00 | 2024-06-07T18:30:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009102_001 | Dismissed | Planned | Production unavailability | 2024-05-22T13:19:21+00:00 | 2024-05-22T13:00:00+00:00 | 2024-05-24T18:30:00+00:00 | MW | 39 | 0 | 39 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008950_008 | Dismissed | Planned | Production unavailability | 2024-06-15T12:19:07+00:00 | 2024-07-05T16:30:00+00:00 | 2024-07-05T20:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008950_007 | Dismissed | Planned | Production unavailability | 2024-06-11T15:36:24+00:00 | 2024-07-05T16:30:00+00:00 | 2024-07-05T20:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008950_006 | Dismissed | Planned | Production unavailability | 2024-06-10T10:05:39+00:00 | 2024-07-09T16:00:00+00:00 | 2024-07-09T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008950_005 | Dismissed | Planned | Production unavailability | 2024-06-07T16:42:51+00:00 | 2024-07-09T08:00:00+00:00 | 2024-07-09T17:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008950_004 | Dismissed | Planned | Production unavailability | 2024-05-30T07:16:44+00:00 | 2024-07-02T16:30:00+00:00 | 2024-07-02T20:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008950_003 | Dismissed | Planned | Production unavailability | 2024-05-10T13:58:38+00:00 | 2024-06-21T16:00:00+00:00 | 2024-06-21T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008950_002 | Dismissed | Planned | Production unavailability | 2024-04-19T10:57:08+00:00 | 2024-06-28T16:00:00+00:00 | 2024-06-28T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008950_001 | Dismissed | Planned | Production unavailability | 2024-03-20T12:53:31+00:00 | 2024-05-10T16:00:00+00:00 | 2024-05-10T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000009037_007 | Dismissed | Planned | Production unavailability | 2024-06-15T12:18:23+00:00 | 2024-06-18T07:30:00+00:00 | 2024-06-18T11:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000009037_006 | Dismissed | Planned | Production unavailability | 2024-06-11T15:38:10+00:00 | 2024-06-18T07:30:00+00:00 | 2024-06-18T11:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000009037_005 | Dismissed | Planned | Production unavailability | 2024-06-10T10:04:06+00:00 | 2024-06-18T08:00:00+00:00 | 2024-06-18T12:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000009037_004 | Dismissed | Planned | Production unavailability | 2024-06-07T16:40:03+00:00 | 2024-06-18T08:00:00+00:00 | 2024-06-18T17:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000009037_003 | Dismissed | Planned | Production unavailability | 2024-05-30T07:07:38+00:00 | 2024-06-11T07:30:00+00:00 | 2024-06-11T11:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000009037_002 | Dismissed | Planned | Production unavailability | 2024-05-10T14:09:59+00:00 | 2024-06-03T07:00:00+00:00 | 2024-06-03T11:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000009037_001 | Dismissed | Planned | Production unavailability | 2024-04-19T11:03:06+00:00 | 2024-06-10T07:00:00+00:00 | 2024-06-10T11:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_008 | Dismissed | Planned | Production unavailability | 2024-06-15T12:17:22+00:00 | 2024-07-05T16:30:00+00:00 | 2024-07-05T20:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_007 | Dismissed | Planned | Production unavailability | 2024-06-11T15:40:42+00:00 | 2024-07-05T16:30:00+00:00 | 2024-07-05T20:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_006 | Dismissed | Planned | Production unavailability | 2024-06-10T10:02:43+00:00 | 2024-07-09T16:00:00+00:00 | 2024-07-09T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_005 | Dismissed | Planned | Production unavailability | 2024-06-07T16:38:23+00:00 | 2024-07-09T08:00:00+00:00 | 2024-07-09T17:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_004 | Dismissed | Planned | Production unavailability | 2024-05-30T07:15:20+00:00 | 2024-07-02T16:30:00+00:00 | 2024-07-02T20:30:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_003 | Dismissed | Planned | Production unavailability | 2024-05-10T13:53:51+00:00 | 2024-06-21T16:00:00+00:00 | 2024-06-21T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_002 | Dismissed | Planned | Production unavailability | 2024-04-19T10:56:40+00:00 | 2024-06-28T16:00:00+00:00 | 2024-06-28T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008949_001 | Dismissed | Planned | Production unavailability | 2024-03-20T12:52:32+00:00 | 2024-05-10T16:00:00+00:00 | 2024-05-10T20:00:00+00:00 | MW | 168 | 0 | 168 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |