This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-12-19T20:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 80 81 82 83 84 >
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009228_001 Dismissed Planned Consumption unavailability 2024-07-04T17:13:09+00:00 2024-07-04T18:00:00+00:00 2024-07-04T23:59:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009231_002 Dismissed Unplanned Production unavailability 2024-07-05T14:06:38+00:00 2024-07-05T13:52:00+00:00 2024-07-05T14:00:00+00:00 MW 5 163 168 Failure
Grid
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009231_001 Dismissed Unplanned Production unavailability 2024-07-05T13:53:49+00:00 2024-07-05T13:52:00+00:00 2024-07-05T14:00:00+00:00 MW 5 163 168 Failure
Grid
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009095_005 Inactive Planned Production unavailability 2024-07-04T19:32:31+00:00 2024-07-01T07:00:00+00:00 2024-07-04T18:30:00+00:00 MW 358 0 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009095_004 Dismissed Planned Production unavailability 2024-07-04T16:58:50+00:00 2024-07-01T07:00:00+00:00 2024-07-04T18:30:00+00:00 MW 358 0 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009095_003 Dismissed Planned Production unavailability 2024-07-04T10:18:10+00:00 2024-07-01T07:00:00+00:00 2024-07-04T19:00:00+00:00 MW 358 0 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009095_002 Dismissed Planned Production unavailability 2024-05-29T15:54:31+00:00 2024-07-01T07:00:00+00:00 2024-07-05T19:00:00+00:00 MW 358 0 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009095_001 Dismissed Planned Production unavailability 2024-05-20T17:20:37+00:00 2024-07-01T09:00:00+00:00 2024-07-04T17:00:00+00:00 MW 358 0 358 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009226_002 Inactive Unplanned Consumption unavailability 2024-07-04T16:02:31+00:00 2024-07-04T13:43:00+00:00 2024-07-04T15:00:00+00:00 MW 150 0 150 Failure
Plant Fault - Control System
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009227_002 Inactive Unplanned Consumption unavailability 2024-07-04T16:02:31+00:00 2024-07-04T13:44:00+00:00 2024-07-04T15:00:00+00:00 MW 150 0 150 Failure
Plant Fault - Control System
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009227_001 Dismissed Unplanned Consumption unavailability 2024-07-04T13:49:58+00:00 2024-07-04T13:44:00+00:00 2024-07-04T15:00:00+00:00 MW 150 0 150 Failure
Plant Fault - Control System
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009226_001 Dismissed Unplanned Consumption unavailability 2024-07-04T13:46:30+00:00 2024-07-04T13:43:00+00:00 2024-07-04T15:00:00+00:00 MW 150 0 150 Failure
Plant Fault - Control System
Hydro Pumped Storage 10YGB----------A
T_DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009219_002 Dismissed Planned Production unavailability 2024-07-04T11:19:49+00:00 2024-07-04T11:10:00+00:00 2024-07-04T11:15:00+00:00 MW 5 0 5 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009219_001 Dismissed Planned Production unavailability 2024-07-04T11:08:46+00:00 2024-07-04T11:10:00+00:00 2024-07-04T11:15:00+00:00 MW 5 0 5 Shutdown
Commissioning
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009218_002 Dismissed Planned Production unavailability 2024-07-04T10:54:01+00:00 2024-07-04T10:55:00+00:00 2024-07-04T11:00:00+00:00 MW 5 34 39 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
DBAWO-2 48W00000DBAWO-2H
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009218_001 Dismissed Planned Production unavailability 2024-07-04T10:50:11+00:00 2024-07-04T10:55:00+00:00 2024-07-04T11:00:00+00:00 MW 5 34 39 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009217_002 Dismissed Planned Production unavailability 2024-07-04T10:48:36+00:00 2024-07-04T10:45:00+00:00 2024-07-04T11:00:00+00:00 MW 5 0 5 Shutdown
Commissioning
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009217_001 Dismissed Planned Production unavailability 2024-07-04T10:41:28+00:00 2024-07-04T10:45:00+00:00 2024-07-04T11:00:00+00:00 MW 5 0 5 Shutdown
Commissioning
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009216_002 Dismissed Planned Production unavailability 2024-07-04T10:42:00+00:00 2024-07-04T10:45:00+00:00 2024-07-04T11:00:00+00:00 MW 5 0 5 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009216_001 Dismissed Planned Production unavailability 2024-07-04T10:39:29+00:00 2024-07-04T10:45:00+00:00 2024-07-04T11:00:00+00:00 MW 5 0 5 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009214_002 Inactive Unplanned Consumption unavailability 2024-07-03T12:17:32+00:00 2024-07-03T10:16:00+00:00 2024-07-03T11:15:00+00:00 MW 150 0 150 Shutdown
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009213_002 Inactive Unplanned Production unavailability 2024-07-03T12:17:32+00:00 2024-07-03T10:14:00+00:00 2024-07-03T11:15:00+00:00 MW 150 0 150 Shutdown
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009213_001 Dismissed Unplanned Production unavailability 2024-07-03T10:15:38+00:00 2024-07-03T10:14:00+00:00 2024-07-03T11:15:00+00:00 MW 150 0 150 Shutdown
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009214_001 Dismissed Unplanned Consumption unavailability 2024-07-03T10:17:15+00:00 2024-07-03T10:16:00+00:00 2024-07-03T11:15:00+00:00 MW 150 0 150 Shutdown
Plant Fault - Auxiliary Equipment
Hydro Pumped Storage 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_012 Dismissed Planned Production unavailability 2024-07-02T08:29:33+00:00 2024-05-05T10:00:00+00:00 2024-07-02T08:09:00+00:00 MW 92 65 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_011 Dismissed Planned Production unavailability 2024-06-27T16:48:13+00:00 2024-05-05T10:00:00+00:00 2024-07-02T16:00:00+00:00 MW 92 65 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_010 Dismissed Planned Production unavailability 2024-06-21T11:24:54+00:00 2024-05-05T10:00:00+00:00 2024-06-28T16:00:00+00:00 MW 92 65 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_009 Dismissed Planned Production unavailability 2024-06-21T11:19:07+00:00 2024-05-05T10:00:00+00:00 2024-06-28T16:00:00+00:00 MW 105 52 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_008 Dismissed Planned Production unavailability 2024-06-14T08:48:29+00:00 2024-05-05T10:00:00+00:00 2024-06-21T16:00:00+00:00 MW 105 52 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_007 Dismissed Planned Production unavailability 2024-06-07T10:33:45+00:00 2024-05-05T10:00:00+00:00 2024-06-14T16:00:00+00:00 MW 105 52 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_006 Dismissed Planned Production unavailability 2024-05-22T10:24:36+00:00 2024-05-05T10:00:00+00:00 2024-06-07T12:00:00+00:00 MW 105 52 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_005 Dismissed Planned Production unavailability 2024-05-20T09:06:59+00:00 2024-05-05T10:00:00+00:00 2024-05-22T10:30:00+00:00 MW 157 0 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_004 Dismissed Planned Production unavailability 2024-05-15T08:32:56+00:00 2024-05-05T10:00:00+00:00 2024-05-20T10:30:00+00:00 MW 157 0 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_003 Dismissed Planned Production unavailability 2024-05-10T07:31:39+00:00 2024-05-05T10:00:00+00:00 2024-05-15T12:20:00+00:00 MW 157 0 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_002 Dismissed Planned Production unavailability 2024-05-07T17:19:55+00:00 2024-05-05T10:00:00+00:00 2024-05-10T08:00:00+00:00 MW 157 0 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009066_001 Dismissed Planned Production unavailability 2024-05-06T07:50:42+00:00 2024-05-05T10:00:00+00:00 2024-05-08T08:00:00+00:00 MW 157 0 157 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009200_003 Inactive Planned Consumption unavailability 2024-07-02T07:32:32+00:00 2024-07-02T04:15:00+00:00 2024-07-02T06:30:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009200_002 Dismissed Planned Consumption unavailability 2024-07-02T06:15:39+00:00 2024-07-02T04:15:00+00:00 2024-07-02T06:30:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009200_001 Dismissed Planned Consumption unavailability 2024-07-02T03:45:16+00:00 2024-07-02T04:15:00+00:00 2024-07-02T10:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009193_005 Inactive Planned Consumption unavailability 2024-06-29T10:02:32+00:00 2024-06-27T15:30:00+00:00 2024-06-29T09:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009193_004 Dismissed Planned Consumption unavailability 2024-06-29T08:38:02+00:00 2024-06-27T15:30:00+00:00 2024-06-29T09:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009193_003 Dismissed Planned Consumption unavailability 2024-06-28T21:12:06+00:00 2024-06-27T15:30:00+00:00 2024-06-29T13:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009193_002 Dismissed Planned Consumption unavailability 2024-06-27T21:00:20+00:00 2024-06-27T15:30:00+00:00 2024-06-28T22:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009193_001 Dismissed Planned Consumption unavailability 2024-06-27T16:50:27+00:00 2024-06-27T15:30:00+00:00 2024-06-28T00:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009196_004 Inactive Planned Consumption unavailability 2024-06-29T09:32:32+00:00 2024-06-28T11:35:00+00:00 2024-06-29T08:30:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009196_003 Dismissed Planned Consumption unavailability 2024-06-29T07:58:54+00:00 2024-06-28T11:35:00+00:00 2024-06-29T08:30:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009196_002 Dismissed Planned Consumption unavailability 2024-06-28T21:13:21+00:00 2024-06-28T11:35:00+00:00 2024-06-29T13:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009196_001 Dismissed Planned Consumption unavailability 2024-06-28T08:38:45+00:00 2024-06-28T11:35:00+00:00 2024-06-28T22:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009194_003 Dismissed Planned Production unavailability 2024-06-28T17:26:11+00:00 2024-06-28T15:30:00+00:00 2024-06-28T16:30:00+00:00 MW 300 0 300 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000009194_002 Dismissed Planned Production unavailability 2024-06-28T12:31:12+00:00 2024-06-28T15:30:00+00:00 2024-06-28T16:30:00+00:00 MW 300 0 300 Shutdown
Testing
Wind Offshore 10YGB----------A