Last update at: 2025-12-19T20:30:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 76 77 78 79 80 > | ||||||||||||||||||
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009258_003 | Dismissed | Planned | Production unavailability | 2024-07-21T07:31:55+00:00 | 2024-07-21T17:00:00+00:00 | 2024-07-28T13:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009257_003 | Dismissed | Planned | Production unavailability | 2024-07-21T07:31:32+00:00 | 2024-07-21T17:00:00+00:00 | 2024-07-28T13:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009257_002 | Dismissed | Planned | Production unavailability | 2024-07-19T18:54:18+00:00 | 2024-07-21T18:00:00+00:00 | 2024-07-28T13:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009258_002 | Dismissed | Planned | Production unavailability | 2024-07-19T18:52:53+00:00 | 2024-07-21T18:00:00+00:00 | 2024-07-28T13:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009260_002 | Dismissed | Planned | Production unavailability | 2024-07-19T18:42:31+00:00 | 2024-07-21T18:00:00+00:00 | 2024-07-28T13:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009259_002 | Dismissed | Planned | Production unavailability | 2024-07-19T18:43:47+00:00 | 2024-07-21T18:00:00+00:00 | 2024-07-28T13:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009259_001 | Dismissed | Planned | Production unavailability | 2024-07-19T18:07:49+00:00 | 2024-07-21T17:00:00+00:00 | 2024-07-28T12:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009260_001 | Dismissed | Planned | Production unavailability | 2024-07-19T18:25:25+00:00 | 2024-07-21T17:00:00+00:00 | 2024-07-28T12:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009258_001 | Dismissed | Planned | Production unavailability | 2024-07-19T18:04:50+00:00 | 2024-07-21T17:00:00+00:00 | 2024-07-28T12:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009257_001 | Dismissed | Planned | Production unavailability | 2024-07-19T18:02:08+00:00 | 2024-07-21T17:00:00+00:00 | 2024-07-28T12:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009286_003 | Inactive | Unplanned | Consumption unavailability | 2024-07-29T18:17:32+00:00 | 2024-07-29T14:15:00+00:00 | 2024-07-29T17:15:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Generator |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009285_003 | Inactive | Unplanned | Production unavailability | 2024-07-29T18:17:32+00:00 | 2024-07-29T14:15:00+00:00 | 2024-07-29T17:15:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Generator |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009285_002 | Dismissed | Unplanned | Production unavailability | 2024-07-29T17:09:30+00:00 | 2024-07-29T14:15:00+00:00 | 2024-07-29T17:15:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Generator |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009286_002 | Dismissed | Unplanned | Consumption unavailability | 2024-07-29T17:09:06+00:00 | 2024-07-29T14:15:00+00:00 | 2024-07-29T17:15:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Generator |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009286_001 | Dismissed | Unplanned | Consumption unavailability | 2024-07-29T14:24:18+00:00 | 2024-07-29T14:15:00+00:00 | 2024-07-29T18:30:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Generator |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009285_001 | Dismissed | Unplanned | Production unavailability | 2024-07-29T14:21:48+00:00 | 2024-07-29T14:15:00+00:00 | 2024-07-29T18:30:00+00:00 | MW | 150 | 0 | 150 | Failure | Plant Fault - Generator |
Hydro Pumped Storage | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009210_002 | Inactive | Planned | Production unavailability | 2024-07-29T18:02:32+00:00 | 2024-07-23T08:00:00+00:00 | 2024-07-29T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
| T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009211_002 | Inactive | Planned | Production unavailability | 2024-07-29T18:02:32+00:00 | 2024-07-23T08:00:00+00:00 | 2024-07-29T17:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009212_002 | Inactive | Planned | Production unavailability | 2024-07-29T18:02:32+00:00 | 2024-07-23T08:00:00+00:00 | 2024-07-29T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
| T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009209_002 | Inactive | Planned | Production unavailability | 2024-07-29T18:02:32+00:00 | 2024-07-23T08:00:00+00:00 | 2024-07-29T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
| T_VKNGW-1 | 48W00000VKNGW-14 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009209_001 | Dismissed | Planned | Production unavailability | 2024-07-03T08:12:36+00:00 | 2024-07-23T08:00:00+00:00 | 2024-07-29T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
| T_VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009210_001 | Dismissed | Planned | Production unavailability | 2024-07-03T08:14:03+00:00 | 2024-07-23T08:00:00+00:00 | 2024-07-29T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
| T_VKNGW-3 | 48W00000VKNGW-30 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009211_001 | Dismissed | Planned | Production unavailability | 2024-07-03T08:15:34+00:00 | 2024-07-23T08:00:00+00:00 | 2024-07-29T17:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
| T_VKNGW-4 | 48W00000VKNGW-4Z | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000009212_001 | Dismissed | Planned | Production unavailability | 2024-07-03T08:16:51+00:00 | 2024-07-23T08:00:00+00:00 | 2024-07-29T17:00:00+00:00 | MW | 112 | 0 | 112 | Foreseen Maintenance | Grid |
Wind Onshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009270_002 | Inactive | Planned | Production unavailability | 2024-07-24T21:02:32+00:00 | 2024-07-22T23:00:00+00:00 | 2024-07-24T20:00:00+00:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009270_001 | Dismissed | Planned | Production unavailability | 2024-07-23T13:41:40+00:00 | 2024-07-22T23:00:00+00:00 | 2024-07-24T20:00:00+00:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000009276_003 | Inactive | Unplanned | Production unavailability | 2024-07-24T17:47:32+00:00 | 2024-07-24T15:55:00+00:00 | 2024-07-24T16:33:00+00:00 | MW | 74 | 0 | 74 | Failure | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000009276_002 | Dismissed | Unplanned | Production unavailability | 2024-07-24T16:32:26+00:00 | 2024-07-24T15:55:00+00:00 | 2024-07-24T16:33:00+00:00 | MW | 74 | 0 | 74 | Failure | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000009276_001 | Dismissed | Unplanned | Production unavailability | 2024-07-24T16:06:26+00:00 | 2024-07-24T15:55:00+00:00 | 2024-07-24T18:00:00+00:00 | MW | 74 | 0 | 74 | Failure | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000009275_002 | Dismissed | Planned | Production unavailability | 2024-07-24T15:54:29+00:00 | 2024-07-25T09:00:00+00:00 | 2024-07-25T16:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000009275_001 | Dismissed | Planned | Production unavailability | 2024-07-24T07:58:44+00:00 | 2024-07-25T09:00:00+00:00 | 2024-07-25T16:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009271_002 | Inactive | Planned | Production unavailability | 2024-07-24T05:02:32+00:00 | 2024-07-23T20:31:00+00:00 | 2024-07-24T04:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009273_002 | Inactive | Planned | Production unavailability | 2024-07-24T05:02:32+00:00 | 2024-07-23T21:15:00+00:00 | 2024-07-24T04:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009273_001 | Dismissed | Planned | Production unavailability | 2024-07-23T21:14:48+00:00 | 2024-07-23T21:15:00+00:00 | 2024-07-24T04:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009271_001 | Dismissed | Planned | Production unavailability | 2024-07-23T20:00:48+00:00 | 2024-07-23T20:31:00+00:00 | 2024-07-24T04:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_008 | Dismissed | Planned | Production unavailability | 2024-07-23T13:42:46+00:00 | 2024-05-22T13:00:00+00:00 | 2024-07-23T13:44:00+00:00 | MW | 157 | 0 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_007 | Dismissed | Planned | Production unavailability | 2024-07-19T10:32:08+00:00 | 2024-05-22T13:00:00+00:00 | 2024-07-26T17:00:00+00:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_006 | Dismissed | Planned | Production unavailability | 2024-07-16T10:52:02+00:00 | 2024-05-22T13:00:00+00:00 | 2024-07-19T17:00:00+00:00 | MW | 66 | 91 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_005 | Dismissed | Planned | Production unavailability | 2024-07-15T16:06:08+00:00 | 2024-05-22T13:00:00+00:00 | 2024-07-19T17:00:00+00:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_004 | Dismissed | Planned | Production unavailability | 2024-07-12T08:58:34+00:00 | 2024-05-22T13:00:00+00:00 | 2024-07-15T17:00:00+00:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_003 | Dismissed | Planned | Production unavailability | 2024-07-05T11:23:01+00:00 | 2024-05-22T13:00:00+00:00 | 2024-07-12T16:30:00+00:00 | MW | 53 | 104 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_002 | Dismissed | Planned | Production unavailability | 2024-07-04T11:06:09+00:00 | 2024-05-22T13:00:00+00:00 | 2024-07-05T16:30:00+00:00 | MW | 79 | 78 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009201_001 | Dismissed | Planned | Production unavailability | 2024-07-02T08:28:24+00:00 | 2024-05-22T13:00:00+00:00 | 2024-07-05T16:30:00+00:00 | MW | 79 | 78 | 157 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009266_003 | Inactive | Planned | Consumption unavailability | 2024-07-22T14:32:31+00:00 | 2024-07-22T13:00:00+00:00 | 2024-07-22T13:20:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009266_002 | Dismissed | Planned | Consumption unavailability | 2024-07-22T13:15:26+00:00 | 2024-07-22T13:00:00+00:00 | 2024-07-22T13:20:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009266_001 | Dismissed | Planned | Consumption unavailability | 2024-07-22T12:18:44+00:00 | 2024-07-22T13:00:00+00:00 | 2024-07-22T15:00:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009263_005 | Inactive | Planned | Consumption unavailability | 2024-07-22T14:02:31+00:00 | 2024-07-21T12:10:00+00:00 | 2024-07-22T13:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009263_004 | Dismissed | Planned | Consumption unavailability | 2024-07-22T12:19:50+00:00 | 2024-07-21T12:10:00+00:00 | 2024-07-22T13:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009263_003 | Dismissed | Planned | Consumption unavailability | 2024-07-21T13:23:20+00:00 | 2024-07-21T12:10:00+00:00 | 2024-07-22T15:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009263_002 | Dismissed | Planned | Consumption unavailability | 2024-07-21T12:47:04+00:00 | 2024-07-21T12:10:00+00:00 | 2024-07-21T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |