This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-12-19T20:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 69 70 71 72 73 >
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009373_001 Dismissed Planned Consumption unavailability 2024-08-29T16:19:15+00:00 2024-09-03T15:00:00+00:00 2024-09-03T17:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_011 Inactive Planned Consumption unavailability 2024-09-03T13:02:32+00:00 2024-08-12T08:00:00+00:00 2024-09-03T12:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_011 Inactive Planned Production unavailability 2024-09-03T13:02:32+00:00 2024-08-12T08:00:00+00:00 2024-09-03T12:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_010 Dismissed Planned Production unavailability 2024-09-03T08:06:56+00:00 2024-08-12T08:00:00+00:00 2024-09-03T12:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_010 Dismissed Planned Consumption unavailability 2024-09-03T08:06:31+00:00 2024-08-12T08:00:00+00:00 2024-09-03T12:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_009 Dismissed Planned Consumption unavailability 2024-08-29T16:15:36+00:00 2024-08-12T08:00:00+00:00 2024-09-03T15:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_009 Dismissed Planned Production unavailability 2024-08-29T16:16:37+00:00 2024-08-12T08:00:00+00:00 2024-09-03T15:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_008 Dismissed Planned Production unavailability 2024-08-29T12:17:39+00:00 2024-08-12T08:00:00+00:00 2024-09-13T17:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_008 Dismissed Planned Consumption unavailability 2024-08-29T12:19:11+00:00 2024-08-12T08:00:00+00:00 2024-09-13T17:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_007 Dismissed Planned Consumption unavailability 2024-08-22T11:42:05+00:00 2024-08-12T08:00:00+00:00 2024-08-30T10:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_007 Dismissed Planned Production unavailability 2024-08-22T11:44:08+00:00 2024-08-12T08:00:00+00:00 2024-08-30T10:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_006 Dismissed Planned Production unavailability 2023-09-25T11:13:33+00:00 2024-08-12T08:00:00+00:00 2024-08-30T18:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_006 Dismissed Planned Consumption unavailability 2023-09-25T11:13:33+00:00 2024-08-12T08:00:00+00:00 2024-08-30T18:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_005 Dismissed Planned Consumption unavailability 2023-08-07T15:56:33+00:00 2024-08-12T08:00:00+00:00 2024-08-30T18:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_005 Dismissed Planned Production unavailability 2023-08-07T15:55:56+00:00 2024-08-12T08:00:00+00:00 2024-08-30T18:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_004 Dismissed Planned Production unavailability 2022-03-23T10:54:24+00:00 2024-07-01T08:00:00+00:00 2024-07-19T16:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_004 Dismissed Planned Consumption unavailability 2022-03-23T10:54:24+00:00 2024-07-01T08:00:00+00:00 2024-07-19T16:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_003 Dismissed Planned Consumption unavailability 2022-02-18T14:34:24+00:00 2024-07-01T08:00:00+00:00 2024-07-19T16:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_003 Dismissed Planned Production unavailability 2022-02-18T14:33:53+00:00 2024-07-01T08:00:00+00:00 2024-07-19T16:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_002 Dismissed Planned Production unavailability 2022-01-12T15:20:50+00:00 2024-07-01T08:00:00+00:00 2024-08-09T16:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_002 Dismissed Planned Consumption unavailability 2022-01-12T15:06:05+00:00 2024-07-01T08:00:00+00:00 2024-08-09T16:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006562_001 Dismissed Planned Consumption unavailability 2021-12-21T15:32:37+00:00 2024-07-01T08:00:00+00:00 2024-07-31T16:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000006071_001 Dismissed Planned Production unavailability 2021-05-24T19:40:13+00:00 2024-07-01T08:00:00+00:00 2024-07-31T16:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009324_005 Inactive Planned Production unavailability 2024-08-30T18:17:31+00:00 2024-08-29T09:00:00+00:00 2024-08-30T17:11:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009324_004 Dismissed Planned Production unavailability 2024-08-30T17:11:00+00:00 2024-08-29T09:00:00+00:00 2024-08-30T17:11:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009324_003 Dismissed Planned Production unavailability 2024-08-30T15:42:15+00:00 2024-08-29T09:00:00+00:00 2024-08-30T18:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009324_002 Dismissed Planned Production unavailability 2024-08-29T03:05:52+00:00 2024-08-29T09:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009324_001 Dismissed Planned Production unavailability 2024-08-05T16:46:28+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009297_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-2 48W00000STLGW-2C
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009298_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009299_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009300_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 0 108 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009301_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009302_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009303_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009304_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009305_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009306_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Shutdown
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009308_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Maintenance
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009310_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009317_002 Inactive Planned Production unavailability 2024-08-30T17:02:32+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009317_001 Dismissed Planned Production unavailability 2024-08-05T10:28:47+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009308_001 Dismissed Planned Production unavailability 2024-08-03T12:26:11+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Maintenance
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009310_001 Dismissed Planned Production unavailability 2024-08-03T14:41:00+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009297_001 Dismissed Planned Production unavailability 2024-08-02T18:29:54+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009306_001 Dismissed Planned Production unavailability 2024-08-03T08:05:00+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Shutdown
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009304_001 Dismissed Planned Production unavailability 2024-08-03T00:49:39+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009305_001 Dismissed Planned Production unavailability 2024-08-03T05:48:16+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009302_001 Dismissed Planned Production unavailability 2024-08-02T20:54:22+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
Stronelairg Wind Farm Limited
48X000000000332W 0000000000000000000009303_001 Dismissed Planned Production unavailability 2024-08-02T22:19:03+00:00 2024-08-29T08:00:00+00:00 2024-08-30T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A