SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-12-18T04:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 34 35 36 37 38 >
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_006 Dismissed Planned Production unavailability 2025-04-11T10:56:29+00:00 2025-03-12T10:50:29+00:00 2025-04-22T17:00:50+00:00 MW 0 78 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_005 Dismissed Planned Production unavailability 2025-04-04T10:52:27+00:00 2025-03-12T10:50:29+00:00 2025-04-14T17:00:50+00:00 MW 26 52 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_004 Dismissed Planned Production unavailability 2025-03-31T10:43:21+00:00 2025-03-12T10:50:29+00:00 2025-04-04T17:00:50+00:00 MW 26 52 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_003 Dismissed Planned Production unavailability 2025-03-21T10:42:51+00:00 2025-03-12T10:50:29+00:00 2025-03-31T17:00:50+00:00 MW 0 78 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_002 Dismissed Planned Production unavailability 2025-03-14T11:19:16+00:00 2025-03-12T10:50:29+00:00 2025-03-21T17:00:50+00:00 MW 0 78 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_DBAWO-3 48W00000DBAWO-3F
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009980_001 Dismissed Planned Production unavailability 2025-03-12T12:46:43+00:00 2025-03-12T10:50:29+00:00 2025-03-14T17:00:50+00:00 MW 52 26 78 Shutdown
Commissioning
Wind Offshore 10YGB----------A
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_005 Inactive Planned Production unavailability 2025-04-28T10:02:32+00:00 2025-04-22T09:00:00+00:00 2025-04-28T09:00:00+00:00 MW 58 28 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_004 Dismissed Planned Production unavailability 2025-04-26T08:05:50+00:00 2025-04-22T09:00:00+00:00 2025-04-28T09:00:00+00:00 MW 58 28 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_003 Dismissed Planned Production unavailability 2025-04-25T12:05:08+00:00 2025-04-22T09:00:00+00:00 2025-04-28T09:00:00+00:00 MW 75 11 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_002 Dismissed Planned Production unavailability 2025-04-24T16:51:57+00:00 2025-04-22T09:00:00+00:00 2025-04-28T09:00:00+00:00 MW 58 28 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010079_001 Dismissed Planned Production unavailability 2025-04-18T11:42:11+00:00 2025-04-22T09:00:00+00:00 2025-04-25T09:00:00+00:00 MW 68 18 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010096_002 Inactive Unplanned Production unavailability 2025-04-25T12:47:32+00:00 2025-04-25T11:08:18+00:00 2025-04-25T11:40:30+00:00 MW 140 0 140 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010092_002 Inactive Unplanned Production unavailability 2025-04-25T12:47:32+00:00 2025-04-25T11:08:43+00:00 2025-04-25T11:40:49+00:00 MW 358 0 358 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010093_002 Inactive Unplanned Production unavailability 2025-04-25T12:47:32+00:00 2025-04-25T11:08:56+00:00 2025-04-25T11:40:08+00:00 MW 160 0 160 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010094_002 Inactive Unplanned Production unavailability 2025-04-25T12:47:32+00:00 2025-04-25T11:08:53+00:00 2025-04-25T11:40:57+00:00 MW 300 0 300 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010095_002 Inactive Unplanned Production unavailability 2025-04-25T12:47:32+00:00 2025-04-25T11:08:32+00:00 2025-04-25T11:40:36+00:00 MW 80 0 80 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010091_002 Inactive Unplanned Production unavailability 2025-04-25T12:47:32+00:00 2025-04-25T11:08:27+00:00 2025-04-25T11:40:38+00:00 MW 80 0 80 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010091_001 Dismissed Unplanned Production unavailability 2025-04-25T11:31:34+00:00 2025-04-25T11:08:27+00:00 2025-04-25T11:40:38+00:00 MW 80 0 80 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010092_001 Dismissed Unplanned Production unavailability 2025-04-25T11:32:21+00:00 2025-04-25T11:08:43+00:00 2025-04-25T11:40:49+00:00 MW 358 0 358 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-2 48W00000SGRWO-2J
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010095_001 Dismissed Unplanned Production unavailability 2025-04-25T11:33:53+00:00 2025-04-25T11:08:32+00:00 2025-04-25T11:40:36+00:00 MW 80 0 80 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010096_001 Dismissed Unplanned Production unavailability 2025-04-25T11:34:02+00:00 2025-04-25T11:08:18+00:00 2025-04-25T11:40:30+00:00 MW 140 0 140 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010093_001 Dismissed Unplanned Production unavailability 2025-04-25T11:32:49+00:00 2025-04-25T11:08:56+00:00 2025-04-25T11:40:08+00:00 MW 160 0 160 Shutdown
Testing
Wind Offshore 10YGB----------A
T_SGRWO-1 48W00000SGRWO-1L
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000010094_001 Dismissed Unplanned Production unavailability 2025-04-25T11:33:14+00:00 2025-04-25T11:08:53+00:00 2025-04-25T11:40:57+00:00 MW 300 0 300 Shutdown
Testing
Wind Offshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010040_003 Inactive Planned Production unavailability 2025-04-22T12:32:32+00:00 2025-04-22T09:30:00+00:00 2025-04-22T11:25:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010041_003 Inactive Planned Consumption unavailability 2025-04-22T12:32:32+00:00 2025-04-22T09:30:00+00:00 2025-04-22T11:25:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000010042_003 Inactive Planned Production unavailability 2025-04-22T12:32:32+00:00 2025-04-22T09:30:00+00:00 2025-04-22T11:23:43+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000010043_003 Inactive Planned Consumption unavailability 2025-04-22T12:32:32+00:00 2025-04-22T09:30:55+00:00 2025-04-22T11:20:07+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000010043_002 Dismissed Planned Consumption unavailability 2025-04-22T11:19:58+00:00 2025-04-22T09:30:55+00:00 2025-04-22T11:20:07+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010041_002 Dismissed Planned Consumption unavailability 2025-04-22T11:22:28+00:00 2025-04-22T09:30:00+00:00 2025-04-22T11:25:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010040_002 Dismissed Planned Production unavailability 2025-04-22T11:23:16+00:00 2025-04-22T09:30:00+00:00 2025-04-22T11:25:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000010042_002 Dismissed Planned Production unavailability 2025-04-22T11:21:30+00:00 2025-04-22T09:30:00+00:00 2025-04-22T11:23:43+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010041_001 Dismissed Planned Consumption unavailability 2025-04-07T10:04:52+00:00 2025-04-22T09:30:00+00:00 2025-04-22T15:30:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000010042_001 Dismissed Planned Production unavailability 2025-04-07T10:07:20+00:00 2025-04-22T09:30:00+00:00 2025-04-22T15:30:43+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000010043_001 Dismissed Planned Consumption unavailability 2025-04-07T10:08:36+00:00 2025-04-22T09:30:55+00:00 2025-04-22T15:30:07+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010040_001 Dismissed Planned Production unavailability 2025-04-07T10:03:48+00:00 2025-04-22T09:30:00+00:00 2025-04-22T15:30:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010078_002 Inactive Planned Production unavailability 2025-04-22T10:02:32+00:00 2025-04-19T09:00:00+00:00 2025-04-22T09:00:00+00:00 MW 64 22 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010078_001 Dismissed Planned Production unavailability 2025-04-18T11:37:42+00:00 2025-04-19T09:00:00+00:00 2025-04-22T09:00:00+00:00 MW 64 22 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_016 Inactive Planned Production unavailability 2025-04-19T10:02:32+00:00 2025-04-10T17:41:00+00:00 2025-04-19T09:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_015 Dismissed Planned Production unavailability 2025-04-18T11:37:29+00:00 2025-04-10T17:41:00+00:00 2025-04-19T09:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_014 Dismissed Planned Production unavailability 2025-04-17T20:06:21+00:00 2025-04-10T17:41:00+00:00 2025-04-21T17:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_013 Dismissed Planned Production unavailability 2025-04-15T19:19:24+00:00 2025-04-10T17:41:00+00:00 2025-04-19T17:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_012 Dismissed Planned Production unavailability 2025-04-14T15:59:51+00:00 2025-04-10T17:41:00+00:00 2025-04-16T17:00:00+00:00 MW 53 33 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_011 Dismissed Planned Production unavailability 2025-04-14T10:58:35+00:00 2025-04-10T17:41:00+00:00 2025-04-16T17:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_010 Dismissed Planned Production unavailability 2025-04-11T11:17:09+00:00 2025-04-10T17:41:00+00:00 2025-04-14T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_009 Dismissed Planned Production unavailability 2025-04-10T18:13:31+00:00 2025-04-10T17:41:00+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_008 Dismissed Planned Production unavailability 2025-04-10T18:06:12+00:00 2025-04-10T17:40:00+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_007 Dismissed Planned Production unavailability 2025-04-10T17:57:32+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_006 Dismissed Planned Production unavailability 2025-04-10T17:54:24+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_005 Dismissed Planned Production unavailability 2025-04-10T17:49:35+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010054_004 Dismissed Planned Production unavailability 2025-04-10T17:46:12+00:00 2025-04-10T17:39:27+00:00 2025-04-11T16:00:00+00:00 MW 46 40 86 Foreseen Maintenance
Commissioning
Wind Onshore 10Y1001A1001A59C