SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-12-12T13:00:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 32 33 34 35 36 >
T_VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009882_002 Dismissed Planned Production unavailability 2025-04-24T10:19:21+00:00 2025-04-28T06:00:00+00:00 2025-05-05T05:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009883_002 Dismissed Planned Production unavailability 2025-04-24T10:18:49+00:00 2025-04-28T06:00:00+00:00 2025-05-05T05:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009884_002 Dismissed Planned Production unavailability 2025-04-24T10:18:19+00:00 2025-04-28T06:00:00+00:00 2025-05-05T05:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009885_002 Dismissed Planned Production unavailability 2025-04-24T10:17:36+00:00 2025-04-28T06:00:00+00:00 2025-05-05T05:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_VKNGW-2 48W00000VKNGW-22
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009883_001 Dismissed Planned Production unavailability 2025-02-04T11:01:00+00:00 2025-04-28T08:00:00+00:00 2025-05-05T05:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009884_001 Dismissed Planned Production unavailability 2025-02-04T11:02:29+00:00 2025-04-28T08:00:00+00:00 2025-05-05T05:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_VKNGW-1 48W00000VKNGW-14
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009882_001 Dismissed Planned Production unavailability 2025-02-04T10:59:28+00:00 2025-04-28T08:00:00+00:00 2025-05-05T05:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_VKNGW-4 48W00000VKNGW-4Z
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000009885_001 Dismissed Planned Production unavailability 2025-02-04T11:04:59+00:00 2025-04-28T08:00:00+00:00 2025-05-05T05:00:00+00:00 MW 112 0 112 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010108_005 Inactive Planned Consumption unavailability 2025-05-03T19:32:32+00:00 2025-05-01T18:00:00+00:00 2025-05-03T18:26:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010108_004 Dismissed Planned Consumption unavailability 2025-05-03T18:25:45+00:00 2025-05-01T18:00:00+00:00 2025-05-03T18:26:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010108_003 Dismissed Planned Consumption unavailability 2025-05-03T10:42:24+00:00 2025-05-01T18:00:00+00:00 2025-05-04T00:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010108_002 Dismissed Planned Consumption unavailability 2025-05-02T09:36:44+00:00 2025-05-01T18:00:00+00:00 2025-05-03T12:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010108_001 Dismissed Planned Consumption unavailability 2025-05-01T15:44:08+00:00 2025-05-01T18:00:00+00:00 2025-05-02T12:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010101_003 Inactive Planned Production unavailability 2025-05-02T18:02:32+00:00 2025-05-01T09:00:58+00:00 2025-05-02T17:00:00+00:00 MW 72 14 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010101_002 Dismissed Planned Production unavailability 2025-04-29T17:55:16+00:00 2025-05-01T09:00:58+00:00 2025-05-02T17:00:00+00:00 MW 72 14 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010101_001 Dismissed Planned Production unavailability 2025-04-29T17:50:56+00:00 2025-05-01T09:00:58+00:00 2025-05-02T17:00:24+00:00 MW 72 14 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_011 Inactive Unplanned Consumption unavailability 2025-05-01T19:02:32+00:00 2025-04-22T17:35:58+00:00 2025-05-01T18:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_010 Dismissed Unplanned Consumption unavailability 2025-05-01T15:42:28+00:00 2025-04-22T17:35:58+00:00 2025-05-01T18:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_009 Dismissed Unplanned Consumption unavailability 2025-05-01T15:41:48+00:00 2025-04-22T17:35:58+00:00 2025-05-02T12:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_008 Dismissed Unplanned Consumption unavailability 2025-05-01T09:17:39+00:00 2025-04-22T17:35:58+00:00 2025-05-01T18:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_007 Dismissed Unplanned Consumption unavailability 2025-04-30T16:00:39+00:00 2025-04-22T17:35:58+00:00 2025-05-01T17:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_006 Dismissed Unplanned Consumption unavailability 2025-04-29T13:31:59+00:00 2025-04-22T17:35:58+00:00 2025-05-12T17:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_005 Dismissed Unplanned Consumption unavailability 2025-04-28T17:01:54+00:00 2025-04-22T17:35:58+00:00 2025-05-05T17:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_004 Dismissed Unplanned Consumption unavailability 2025-04-24T13:49:29+00:00 2025-04-22T17:35:58+00:00 2025-05-01T17:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_003 Dismissed Unplanned Consumption unavailability 2025-04-24T08:31:19+00:00 2025-04-22T17:35:58+00:00 2025-04-30T23:59:04+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010107_003 Inactive Planned Production unavailability 2025-05-01T19:02:32+00:00 2025-05-01T15:00:00+00:00 2025-05-01T18:00:00+00:00 MW 0 150 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010107_002 Dismissed Planned Production unavailability 2025-05-01T12:37:25+00:00 2025-05-01T15:00:00+00:00 2025-05-01T18:00:00+00:00 MW 0 150 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_002 Dismissed Unplanned Consumption unavailability 2025-04-23T16:44:48+00:00 2025-04-22T17:35:58+00:00 2025-04-24T23:59:04+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010088_001 Dismissed Unplanned Consumption unavailability 2025-04-22T17:41:03+00:00 2025-04-22T17:35:58+00:00 2025-04-23T23:59:04+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010107_001 Dismissed Planned Production unavailability 2025-05-01T09:23:37+00:00 2025-05-01T16:00:00+00:00 2025-05-01T18:00:00+00:00 MW 0 150 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_010 Inactive Unplanned Production unavailability 2025-05-01T16:02:32+00:00 2025-04-22T17:35:15+00:00 2025-05-01T15:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_009 Dismissed Unplanned Production unavailability 2025-05-01T12:37:58+00:00 2025-04-22T17:35:15+00:00 2025-05-01T15:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_008 Dismissed Unplanned Production unavailability 2025-05-01T09:19:03+00:00 2025-04-22T17:35:15+00:00 2025-05-01T16:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_007 Dismissed Unplanned Production unavailability 2025-04-30T15:59:57+00:00 2025-04-22T17:35:15+00:00 2025-05-01T17:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_006 Dismissed Unplanned Production unavailability 2025-04-29T13:32:26+00:00 2025-04-22T17:35:15+00:00 2025-05-12T17:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_005 Dismissed Unplanned Production unavailability 2025-04-28T17:01:10+00:00 2025-04-22T17:35:15+00:00 2025-05-05T17:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_004 Dismissed Unplanned Production unavailability 2025-04-24T13:49:54+00:00 2025-04-22T17:35:15+00:00 2025-05-01T17:00:00+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_003 Dismissed Unplanned Production unavailability 2025-04-24T08:30:56+00:00 2025-04-22T17:35:15+00:00 2025-04-30T23:59:31+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_002 Dismissed Unplanned Production unavailability 2025-04-23T16:44:26+00:00 2025-04-22T17:35:15+00:00 2025-04-24T23:59:31+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000010087_001 Dismissed Unplanned Production unavailability 2025-04-22T17:39:25+00:00 2025-04-22T17:35:15+00:00 2025-04-23T23:59:31+00:00 MW 150 0 150 Failure
Grid
Hydro Pumped Storage 10YGB----------A
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010100_003 Inactive Unplanned Production unavailability 2025-05-01T10:02:32+00:00 2025-04-25T17:00:59+00:00 2025-05-01T09:00:19+00:00 MW 57 29 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010100_002 Dismissed Unplanned Production unavailability 2025-04-29T17:51:38+00:00 2025-04-25T17:00:59+00:00 2025-05-01T09:00:19+00:00 MW 57 29 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
Yellow River 47W0000000004914
SSE Airtricity Limited
23X--140207ALT-9 0000000000000000000010100_001 Dismissed Unplanned Production unavailability 2025-04-29T17:47:35+00:00 2025-04-25T09:00:59+00:00 2025-05-01T09:00:19+00:00 MW 57 29 86 Failure
Commissioning
Wind Onshore 10Y1001A1001A59C
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009924_002 Dismissed Planned Production unavailability 2025-04-30T15:38:48+00:00 2025-05-20T09:00:00+00:00 2025-05-20T13:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009924_001 Dismissed Planned Production unavailability 2025-02-24T15:11:07+00:00 2025-05-20T09:00:00+00:00 2025-05-20T13:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009925_002 Dismissed Planned Consumption unavailability 2025-04-30T15:35:30+00:00 2025-05-20T09:00:00+00:00 2025-05-20T13:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009925_001 Dismissed Planned Consumption unavailability 2025-02-24T15:13:20+00:00 2025-05-20T09:00:00+00:00 2025-05-20T13:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009926_002 Dismissed Planned Production unavailability 2025-04-30T15:35:10+00:00 2025-05-20T09:00:00+00:00 2025-05-20T13:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009926_001 Dismissed Planned Production unavailability 2025-02-24T15:15:17+00:00 2025-05-20T09:00:00+00:00 2025-05-20T13:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000009927_002 Dismissed Planned Consumption unavailability 2025-04-30T15:34:38+00:00 2025-05-20T09:00:00+00:00 2025-05-20T13:00:00+00:00 MW 150 0 150 Foreseen Maintenance
Testing
Hydro Pumped Storage 10YGB----------A