SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-12-22T23:00:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 150 151 152 153 154 >
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007929_006 Dismissed Planned Production unavailability 2023-02-02T14:41:31+00:00 2023-02-02T09:00:00+00:00 2023-02-09T05:59:00+00:00 MW 168 190 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007929_005 Dismissed Planned Production unavailability 2023-02-02T02:38:03+00:00 2023-02-02T09:00:00+00:00 2023-02-03T05:59:00+00:00 MW 168 190 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007929_004 Dismissed Planned Production unavailability 2023-02-02T02:31:44+00:00 2023-02-02T03:30:00+00:00 2023-02-03T05:59:00+00:00 MW 168 190 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007929_003 Dismissed Planned Production unavailability 2023-01-31T10:01:46+00:00 2023-02-02T12:00:00+00:00 2023-02-03T05:59:00+00:00 MW 168 190 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007929_002 Dismissed Planned Production unavailability 2023-01-31T05:40:15+00:00 2023-01-31T12:00:00+00:00 2023-02-03T05:59:00+00:00 MW 168 190 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007929_001 Dismissed Planned Production unavailability 2023-01-30T12:33:13+00:00 2023-01-31T06:00:00+00:00 2023-02-03T05:59:00+00:00 MW 168 190 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007945_003 Inactive Planned Consumption unavailability 2023-02-09T05:02:32+00:00 2023-02-08T12:00:00+00:00 2023-02-09T04:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007945_002 Dismissed Planned Consumption unavailability 2023-02-08T17:23:09+00:00 2023-02-08T12:00:00+00:00 2023-02-09T04:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007945_001 Dismissed Planned Consumption unavailability 2023-02-08T11:34:42+00:00 2023-02-08T12:00:00+00:00 2023-02-08T18:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000007670_002 Dismissed Planned Production unavailability 2023-02-07T15:57:14+00:00 2023-09-21T08:00:00+00:00 2023-09-22T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_BHLAW-1 48W00000BHLAW-15
SSE GENERATION
48X000000000077M 0000000000000000000007670_001 Dismissed Planned Production unavailability 2022-10-25T15:40:39+00:00 2023-09-21T08:00:00+00:00 2023-09-22T16:00:00+00:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007939_002 Inactive Planned Consumption unavailability 2023-02-05T12:02:32+00:00 2023-02-05T05:00:00+00:00 2023-02-05T11:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007940_002 Inactive Planned Consumption unavailability 2023-02-05T12:02:32+00:00 2023-02-05T07:00:00+00:00 2023-02-05T11:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007940_001 Dismissed Planned Consumption unavailability 2023-02-05T05:11:33+00:00 2023-02-05T07:00:00+00:00 2023-02-05T11:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007939_001 Dismissed Planned Consumption unavailability 2023-02-05T04:56:37+00:00 2023-02-05T05:00:00+00:00 2023-02-05T11:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_CLDCW-1 48W00000CLDCW-17
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000007667_002 Dismissed Planned Production unavailability 2023-02-03T13:30:18+00:00 2023-10-02T09:00:00+00:00 2023-10-04T17:00:00+00:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_CLDCW-1 48W00000CLDCW-17
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000007667_001 Dismissed Planned Production unavailability 2022-10-25T09:56:36+00:00 2023-10-02T09:00:00+00:00 2023-10-04T17:00:00+00:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_CLDNW-1 48W00000CLDNW-1Q
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000007668_002 Dismissed Planned Production unavailability 2023-02-03T13:29:34+00:00 2023-10-02T09:00:00+00:00 2023-10-04T17:00:00+00:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_CLDNW-1 48W00000CLDNW-1Q
Clyde Windfarm (Scotland) Limited
48X000000000071Y 0000000000000000000007668_001 Dismissed Planned Production unavailability 2022-10-25T10:00:04+00:00 2023-10-02T09:00:00+00:00 2023-10-04T17:00:00+00:00 MW 187 0 187 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007938_002 Inactive Planned Consumption unavailability 2023-02-03T09:02:32+00:00 2023-02-02T20:04:00+00:00 2023-02-03T08:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007938_001 Dismissed Planned Consumption unavailability 2023-02-02T20:05:28+00:00 2023-02-02T20:04:00+00:00 2023-02-03T08:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_029 Inactive Planned Production unavailability 2023-02-02T10:02:32+00:00 2022-11-28T08:01:00+00:00 2023-02-02T08:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_028 Dismissed Planned Production unavailability 2023-02-02T02:38:30+00:00 2022-11-28T08:01:00+00:00 2023-02-02T08:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_027 Dismissed Planned Production unavailability 2023-02-02T02:32:08+00:00 2022-11-28T08:01:00+00:00 2023-02-02T03:29:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_026 Dismissed Planned Production unavailability 2023-01-31T12:46:40+00:00 2022-11-28T08:01:00+00:00 2023-02-02T11:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_025 Dismissed Planned Production unavailability 2023-01-31T05:39:49+00:00 2022-11-28T08:01:00+00:00 2023-01-31T11:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_024 Dismissed Planned Production unavailability 2023-01-30T12:31:37+00:00 2022-11-28T08:01:00+00:00 2023-01-31T05:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_023 Dismissed Planned Production unavailability 2023-01-29T11:05:55+00:00 2022-11-28T08:01:00+00:00 2023-02-01T17:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_022 Dismissed Planned Production unavailability 2023-01-28T13:27:44+00:00 2022-11-28T08:01:00+00:00 2023-01-29T17:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_021 Dismissed Planned Production unavailability 2023-01-26T13:13:38+00:00 2022-11-28T08:01:00+00:00 2023-01-28T17:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_020 Dismissed Planned Production unavailability 2023-01-19T15:43:21+00:00 2022-11-28T08:01:00+00:00 2023-01-27T05:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_019 Dismissed Planned Production unavailability 2023-01-12T11:37:50+00:00 2022-11-28T08:01:00+00:00 2023-01-20T05:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_018 Dismissed Planned Production unavailability 2023-01-11T17:12:29+00:00 2022-11-28T08:01:00+00:00 2023-01-20T07:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_017 Dismissed Planned Production unavailability 2023-01-11T17:11:13+00:00 2022-11-28T08:01:00+00:00 2023-01-20T00:00:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_016 Dismissed Planned Production unavailability 2023-01-04T16:14:28+00:00 2022-11-28T08:01:00+00:00 2023-01-12T08:00:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_015 Dismissed Planned Production unavailability 2023-01-02T07:31:57+00:00 2022-11-28T08:01:00+00:00 2023-01-05T08:00:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_014 Dismissed Planned Production unavailability 2022-12-29T08:47:33+00:00 2022-11-28T08:01:00+00:00 2023-01-02T08:00:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_013 Dismissed Planned Production unavailability 2022-12-23T00:57:48+00:00 2022-11-28T08:01:00+00:00 2022-12-30T05:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_012 Dismissed Planned Production unavailability 2022-12-21T13:36:20+00:00 2022-11-28T08:01:00+00:00 2022-12-23T05:59:00+00:00 MW 248 110 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_011 Dismissed Planned Production unavailability 2022-12-14T15:43:19+00:00 2022-12-21T06:00:00+00:00 2023-02-06T05:59:00+00:00 MW 138 220 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_010 Dismissed Planned Production unavailability 2022-12-05T16:28:54+00:00 2022-12-12T06:00:00+00:00 2023-02-06T05:59:00+00:00 MW 118 240 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_009 Dismissed Planned Production unavailability 2022-11-29T14:26:55+00:00 2022-12-06T06:00:00+00:00 2023-02-06T05:59:00+00:00 MW 118 240 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_008 Dismissed Planned Production unavailability 2022-11-18T15:12:32+00:00 2022-12-03T06:00:00+00:00 2023-02-06T05:59:00+00:00 MW 118 240 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_007 Dismissed Planned Production unavailability 2022-11-14T17:00:29+00:00 2022-11-29T06:00:00+00:00 2023-02-06T05:59:00+00:00 MW 118 240 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_006 Dismissed Planned Production unavailability 2022-11-09T17:05:11+00:00 2022-11-21T06:00:00+00:00 2023-02-06T05:59:00+00:00 MW 118 240 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_005 Dismissed Planned Production unavailability 2022-11-04T13:13:01+00:00 2023-03-14T12:00:00+00:00 2023-05-10T11:59:00+00:00 MW 0 358 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_004 Dismissed Planned Production unavailability 2022-10-17T17:28:10+00:00 2023-01-16T06:00:00+00:00 2023-05-01T11:59:00+00:00 MW 0 358 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007484_001 Dismissed Planned Production unavailability 2022-08-05T18:00:30+00:00 2022-11-07T12:00:00+00:00 2023-03-07T11:59:00+00:00 MW 28 330 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000007932_003 Inactive Planned Consumption unavailability 2023-02-01T07:02:31+00:00 2023-01-31T14:52:00+00:00 2023-02-01T06:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007935_002 Inactive Planned Consumption unavailability 2023-02-01T07:02:31+00:00 2023-02-01T04:30:00+00:00 2023-02-01T06:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A