| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 140 141 142 143 144 > | ||||||||||||||||||
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008131_002 | Dismissed | Planned | Production unavailability | 2023-05-17T11:50:56+00:00 | 2023-05-18T12:01:00+00:00 | 2023-05-23T13:59:00+00:00 | MW | 28 | 330 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008131_001 | Dismissed | Planned | Production unavailability | 2023-05-16T23:22:54+00:00 | 2023-05-18T12:01:00+00:00 | 2023-05-23T13:59:00+00:00 | MW | 28 | 330 | 358 | Failure | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008133_002 | Dismissed | Planned | Production unavailability | 2023-05-17T11:44:10+00:00 | 2023-05-18T12:01:00+00:00 | 2023-05-23T13:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008133_001 | Dismissed | Planned | Production unavailability | 2023-05-16T23:36:11+00:00 | 2023-05-18T12:01:00+00:00 | 2023-05-23T13:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008132_002 | Dismissed | Planned | Production unavailability | 2023-05-17T11:43:57+00:00 | 2023-05-18T09:00:00+00:00 | 2023-05-18T12:00:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008132_001 | Dismissed | Planned | Production unavailability | 2023-05-16T23:33:30+00:00 | 2023-05-18T09:00:00+00:00 | 2023-05-18T12:00:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008135_002 | Dismissed | Planned | Production unavailability | 2023-05-17T11:41:30+00:00 | 2023-05-18T09:00:00+00:00 | 2023-05-18T12:00:00+00:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008135_001 | Dismissed | Planned | Production unavailability | 2023-05-16T23:40:49+00:00 | 2023-05-18T09:00:00+00:00 | 2023-05-18T12:00:00+00:00 | MW | 160 | 0 | 160 | Foreseen Maintenance | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008124_004 | Dismissed | Planned | Production unavailability | 2023-05-17T11:41:17+00:00 | 2023-05-18T12:01:00+00:00 | 2023-05-19T12:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008124_003 | Dismissed | Planned | Production unavailability | 2023-05-17T00:20:02+00:00 | 2023-05-18T12:01:00+00:00 | 2023-05-19T12:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008124_002 | Dismissed | Planned | Production unavailability | 2023-05-16T23:45:21+00:00 | 2023-04-18T12:01:00+00:00 | 2023-05-19T12:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008124_001 | Dismissed | Planned | Production unavailability | 2023-05-15T17:12:56+00:00 | 2023-04-06T16:01:00+00:00 | 2023-05-19T12:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008134_002 | Dismissed | Planned | Production unavailability | 2023-05-17T11:39:10+00:00 | 2023-05-18T09:00:00+00:00 | 2023-05-18T12:00:00+00:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008134_001 | Dismissed | Planned | Production unavailability | 2023-05-16T23:38:34+00:00 | 2023-05-18T09:00:00+00:00 | 2023-05-18T12:00:00+00:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008098_002 | Inactive | Planned | Production unavailability | 2023-05-16T21:02:32+00:00 | 2023-05-16T06:00:00+00:00 | 2023-05-16T20:00:00+00:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_GRGBW-2 | 48W00000GRGBW-2T | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008099_002 | Inactive | Planned | Production unavailability | 2023-05-16T21:02:32+00:00 | 2023-05-16T06:00:00+00:00 | 2023-05-16T20:00:00+00:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_GRGBW-2 | 48W00000GRGBW-2T | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008099_001 | Dismissed | Planned | Production unavailability | 2023-04-28T18:49:54+00:00 | 2023-05-16T06:00:00+00:00 | 2023-05-16T20:00:00+00:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008098_001 | Dismissed | Planned | Production unavailability | 2023-04-28T18:47:26+00:00 | 2023-05-16T06:00:00+00:00 | 2023-05-16T20:00:00+00:00 | MW | 165 | 0 | 165 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008125_002 | Inactive | Planned | Production unavailability | 2023-05-16T01:02:32+00:00 | 2023-04-23T14:01:00+00:00 | 2023-05-15T23:59:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008125_001 | Dismissed | Planned | Production unavailability | 2023-05-15T17:16:53+00:00 | 2023-04-23T14:01:00+00:00 | 2023-05-15T23:59:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008087_002 | Inactive | Planned | Production unavailability | 2023-05-15T13:02:32+00:00 | 2023-04-06T16:01:00+00:00 | 2023-05-15T12:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008087_001 | Dismissed | Planned | Production unavailability | 2023-04-19T11:58:42+00:00 | 2023-04-06T16:01:00+00:00 | 2023-05-15T12:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008047_004 | Inactive | Planned | Production unavailability | 2023-05-15T07:02:32+00:00 | 2023-04-06T08:01:00+00:00 | 2023-05-15T05:59:00+00:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008047_003 | Dismissed | Planned | Production unavailability | 2023-04-19T12:03:03+00:00 | 2023-04-06T08:01:00+00:00 | 2023-05-15T05:59:00+00:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008047_002 | Dismissed | Planned | Production unavailability | 2023-04-05T16:10:18+00:00 | 2023-04-06T08:01:00+00:00 | 2023-06-13T05:59:00+00:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008047_001 | Dismissed | Planned | Production unavailability | 2023-03-28T11:50:34+00:00 | 2023-04-06T16:01:00+00:00 | 2023-06-13T05:59:00+00:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008085_004 | Inactive | Planned | Production unavailability | 2023-05-11T13:02:32+00:00 | 2023-04-23T12:01:00+00:00 | 2023-05-11T12:00:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008085_003 | Dismissed | Planned | Production unavailability | 2023-04-22T12:25:30+00:00 | 2023-04-23T12:01:00+00:00 | 2023-05-11T12:00:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008085_002 | Dismissed | Planned | Production unavailability | 2023-04-19T12:11:36+00:00 | 2023-04-23T14:01:00+00:00 | 2023-05-11T12:00:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008085_001 | Dismissed | Planned | Production unavailability | 2023-04-17T17:39:48+00:00 | 2023-04-23T14:01:00+00:00 | 2023-04-29T11:59:00+00:00 | MW | 148 | 210 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007979_005 | Dismissed | Planned | Production unavailability | 2023-05-10T12:28:41+00:00 | 2023-05-15T06:30:00+00:00 | 2023-05-15T10:30:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007979_004 | Dismissed | Planned | Production unavailability | 2023-04-28T14:40:42+00:00 | 2023-05-15T06:30:00+00:00 | 2023-05-15T10:30:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007979_003 | Dismissed | Planned | Production unavailability | 2023-04-28T09:01:18+00:00 | 2023-05-15T07:00:00+00:00 | 2023-06-02T17:00:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007979_002 | Dismissed | Planned | Production unavailability | 2023-02-23T12:42:05+00:00 | 2023-05-01T08:00:00+00:00 | 2023-05-19T17:00:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007979_001 | Dismissed | Planned | Production unavailability | 2023-02-23T12:23:06+00:00 | 2023-05-01T08:00:00+00:00 | 2023-05-19T17:00:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008097_003 | Dismissed | Planned | Production unavailability | 2023-05-10T12:28:20+00:00 | 2023-05-15T06:30:00+00:00 | 2023-05-15T10:30:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008097_002 | Dismissed | Planned | Production unavailability | 2023-04-28T14:38:13+00:00 | 2023-05-15T06:30:00+00:00 | 2023-05-15T10:30:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008097_001 | Dismissed | Planned | Production unavailability | 2023-04-28T08:56:40+00:00 | 2023-05-15T07:00:00+00:00 | 2023-05-15T10:00:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007978_005 | Dismissed | Planned | Production unavailability | 2023-05-10T12:27:52+00:00 | 2023-05-15T06:30:00+00:00 | 2023-05-15T10:30:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007978_004 | Dismissed | Planned | Production unavailability | 2023-04-28T14:39:47+00:00 | 2023-05-15T06:30:00+00:00 | 2023-05-15T10:30:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007978_003 | Dismissed | Planned | Production unavailability | 2023-04-28T08:59:59+00:00 | 2023-05-15T07:00:00+00:00 | 2023-06-02T17:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007978_002 | Dismissed | Planned | Production unavailability | 2023-02-23T12:41:46+00:00 | 2023-05-01T08:00:00+00:00 | 2023-05-19T17:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007978_001 | Dismissed | Planned | Production unavailability | 2023-02-23T12:20:55+00:00 | 2023-05-01T08:00:00+00:00 | 2023-05-19T17:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008096_003 | Dismissed | Planned | Production unavailability | 2023-05-10T12:27:23+00:00 | 2023-05-15T06:30:00+00:00 | 2023-05-15T10:30:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008096_002 | Dismissed | Planned | Production unavailability | 2023-04-28T14:39:03+00:00 | 2023-05-15T06:30:00+00:00 | 2023-05-15T10:30:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008096_001 | Dismissed | Planned | Production unavailability | 2023-04-28T08:55:03+00:00 | 2023-05-15T07:00:00+00:00 | 2023-05-15T10:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008117_004 | Inactive | Planned | Consumption unavailability | 2023-05-08T19:02:32+00:00 | 2023-05-08T04:00:00+00:00 | 2023-05-08T18:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008117_003 | Dismissed | Planned | Consumption unavailability | 2023-05-08T16:48:28+00:00 | 2023-05-08T04:00:00+00:00 | 2023-05-08T18:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008117_002 | Dismissed | Planned | Consumption unavailability | 2023-05-08T11:08:21+00:00 | 2023-05-08T04:00:00+00:00 | 2023-05-08T20:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008117_001 | Dismissed | Planned | Consumption unavailability | 2023-05-08T03:22:00+00:00 | 2023-05-08T04:00:00+00:00 | 2023-05-08T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |