Last update at: 2025-12-22T23:00:00+00:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 135 136 137 138 139 > | ||||||||||||||||||
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008238_002 | Inactive | Unplanned | Consumption unavailability | 2023-07-08T16:02:32+00:00 | 2023-07-08T06:46:00+00:00 | 2023-07-08T15:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008238_001 | Dismissed | Unplanned | Consumption unavailability | 2023-07-08T06:46:59+00:00 | 2023-07-08T06:46:00+00:00 | 2023-07-08T15:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008222_003 | Dismissed | Planned | Production unavailability | 2023-07-07T18:25:52+00:00 | 2023-07-07T00:01:00+00:00 | 2023-07-09T03:00:00+00:00 | MW | 10 | 150 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008222_002 | Dismissed | Planned | Production unavailability | 2023-07-06T16:43:37+00:00 | 2023-07-07T00:01:00+00:00 | 2023-07-09T03:00:00+00:00 | MW | 10 | 150 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008222_001 | Dismissed | Planned | Production unavailability | 2023-07-05T13:42:15+00:00 | 2023-07-07T00:01:00+00:00 | 2023-07-09T06:00:00+00:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000008056_002 | Inactive | Planned | Production unavailability | 2023-07-07T17:02:31+00:00 | 2023-07-01T08:00:00+00:00 | 2023-07-07T16:00:00+00:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000008056_001 | Dismissed | Planned | Production unavailability | 2023-03-30T18:08:44+00:00 | 2023-07-01T08:00:00+00:00 | 2023-07-07T16:00:00+00:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008230_002 | Inactive | Planned | Consumption unavailability | 2023-07-07T16:02:31+00:00 | 2023-07-07T08:00:00+00:00 | 2023-07-07T15:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008230_001 | Dismissed | Planned | Consumption unavailability | 2023-07-07T07:54:46+00:00 | 2023-07-07T08:00:00+00:00 | 2023-07-07T15:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_007 | Inactive | Planned | Production unavailability | 2023-07-07T01:02:32+00:00 | 2023-05-31T13:00:00+00:00 | 2023-07-07T00:00:00+00:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_006 | Dismissed | Planned | Production unavailability | 2023-07-05T13:40:47+00:00 | 2023-05-31T13:00:00+00:00 | 2023-07-07T00:00:00+00:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_005 | Dismissed | Planned | Production unavailability | 2023-07-04T14:28:04+00:00 | 2023-05-31T13:00:00+00:00 | 2023-07-19T05:59:00+00:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_004 | Dismissed | Planned | Production unavailability | 2023-05-24T11:33:39+00:00 | 2023-05-31T13:00:00+00:00 | 2023-07-16T05:59:00+00:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_003 | Dismissed | Planned | Production unavailability | 2023-05-24T10:06:16+00:00 | 2023-06-04T13:00:00+00:00 | 2023-07-16T05:59:00+00:00 | MW | 30 | 110 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_002 | Dismissed | Planned | Production unavailability | 2023-05-22T17:48:10+00:00 | 2023-05-25T13:00:00+00:00 | 2023-06-02T05:59:00+00:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008144_001 | Dismissed | Planned | Production unavailability | 2023-05-19T17:22:14+00:00 | 2023-05-23T13:00:00+00:00 | 2023-06-02T05:59:00+00:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008217_005 | Inactive | Unplanned | Consumption unavailability | 2023-07-04T14:02:32+00:00 | 2023-07-02T16:21:00+00:00 | 2023-07-04T13:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008217_004 | Dismissed | Unplanned | Consumption unavailability | 2023-07-04T12:13:37+00:00 | 2023-07-02T16:21:00+00:00 | 2023-07-04T13:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008217_003 | Dismissed | Unplanned | Consumption unavailability | 2023-07-03T19:41:03+00:00 | 2023-07-02T16:21:00+00:00 | 2023-07-04T23:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008217_002 | Dismissed | Unplanned | Consumption unavailability | 2023-07-03T05:25:52+00:00 | 2023-07-02T16:21:00+00:00 | 2023-07-03T23:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008217_001 | Dismissed | Unplanned | Consumption unavailability | 2023-07-02T16:21:56+00:00 | 2023-07-02T16:21:00+00:00 | 2023-07-03T07:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008206_003 | Dismissed | Planned | Production unavailability | 2023-06-30T16:54:34+00:00 | 2023-06-26T12:01:00+00:00 | 2023-08-07T12:00:00+00:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008206_002 | Dismissed | Planned | Production unavailability | 2023-06-30T16:49:47+00:00 | 2023-06-26T12:01:00+00:00 | 2023-08-07T12:00:00+00:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008206_001 | Dismissed | Planned | Production unavailability | 2023-06-23T19:40:27+00:00 | 2023-06-26T12:01:00+00:00 | 2023-08-07T12:00:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_005 | Dismissed | Planned | Production unavailability | 2023-06-30T16:48:38+00:00 | 2023-07-07T12:01:00+00:00 | 2023-07-16T12:00:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_004 | Dismissed | Planned | Production unavailability | 2023-06-09T15:36:06+00:00 | 2023-07-07T12:01:00+00:00 | 2023-07-16T12:00:00+00:00 | MW | 150 | 150 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_003 | Dismissed | Planned | Production unavailability | 2023-05-24T10:03:35+00:00 | 2023-06-16T06:00:00+00:00 | 2023-07-16T05:59:00+00:00 | MW | 140 | 160 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_002 | Dismissed | Planned | Production unavailability | 2023-05-19T17:15:26+00:00 | 2023-06-06T06:00:00+00:00 | 2023-07-16T05:59:00+00:00 | MW | 140 | 160 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008086_001 | Dismissed | Planned | Production unavailability | 2023-04-19T11:55:06+00:00 | 2023-06-06T06:00:00+00:00 | 2023-07-16T05:59:00+00:00 | MW | 70 | 230 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008145_003 | Dismissed | Planned | Production unavailability | 2023-06-30T16:44:39+00:00 | 2023-06-21T12:00:00+00:00 | 2023-07-07T12:00:00+00:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008145_002 | Dismissed | Planned | Production unavailability | 2023-06-09T15:40:56+00:00 | 2023-06-21T12:00:00+00:00 | 2023-07-07T12:00:00+00:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008145_001 | Dismissed | Planned | Production unavailability | 2023-05-19T17:46:30+00:00 | 2023-06-16T12:01:00+00:00 | 2023-07-07T12:00:00+00:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008205_003 | Inactive | Planned | Production unavailability | 2023-06-29T17:32:32+00:00 | 2023-06-26T08:00:00+00:00 | 2023-06-29T16:30:00+00:00 | MW | 46 | 28 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008205_002 | Dismissed | Planned | Production unavailability | 2023-06-28T16:30:49+00:00 | 2023-06-26T08:00:00+00:00 | 2023-06-29T16:30:00+00:00 | MW | 46 | 28 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008205_001 | Dismissed | Planned | Production unavailability | 2023-06-22T15:29:50+00:00 | 2023-06-26T08:00:00+00:00 | 2023-06-28T16:30:00+00:00 | MW | 46 | 28 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
| T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007980_004 | Dismissed | Planned | Production unavailability | 2023-06-27T13:31:24+00:00 | 2023-07-24T08:00:00+00:00 | 2023-08-11T17:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007980_003 | Dismissed | Planned | Production unavailability | 2023-04-28T09:02:57+00:00 | 2023-07-24T08:00:00+00:00 | 2023-08-11T17:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007980_002 | Dismissed | Planned | Production unavailability | 2023-02-23T12:42:21+00:00 | 2023-07-10T08:00:00+00:00 | 2023-07-28T17:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007980_001 | Dismissed | Planned | Production unavailability | 2023-02-23T12:26:36+00:00 | 2023-07-10T08:00:00+00:00 | 2023-07-28T17:00:00+00:00 | MW | 126 | 0 | 126 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007981_004 | Dismissed | Planned | Production unavailability | 2023-06-27T13:30:55+00:00 | 2023-07-24T08:00:00+00:00 | 2023-08-11T17:00:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007981_003 | Dismissed | Planned | Production unavailability | 2023-04-28T09:03:42+00:00 | 2023-07-24T08:00:00+00:00 | 2023-08-11T17:00:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007981_002 | Dismissed | Planned | Production unavailability | 2023-02-23T12:42:38+00:00 | 2023-07-10T08:00:00+00:00 | 2023-07-28T17:00:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000007981_001 | Dismissed | Planned | Production unavailability | 2023-02-23T12:29:33+00:00 | 2023-07-10T08:00:00+00:00 | 2023-07-28T17:00:00+00:00 | MW | 168 | 0 | 168 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008182_003 | Inactive | Unplanned | Production unavailability | 2023-06-26T13:02:32+00:00 | 2023-06-03T14:26:00+00:00 | 2023-06-26T12:00:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008182_002 | Dismissed | Unplanned | Production unavailability | 2023-06-23T17:23:59+00:00 | 2023-06-03T14:26:00+00:00 | 2023-06-26T12:00:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008182_001 | Dismissed | Unplanned | Production unavailability | 2023-06-09T15:46:14+00:00 | 2023-06-03T14:26:00+00:00 | 2023-07-07T12:00:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008211_005 | Inactive | Unplanned | Production unavailability | 2023-06-25T18:47:32+00:00 | 2023-06-25T03:53:00+00:00 | 2023-06-25T17:45:00+00:00 | MW | 74 | 0 | 74 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008211_004 | Dismissed | Unplanned | Production unavailability | 2023-06-25T17:43:34+00:00 | 2023-06-25T03:53:00+00:00 | 2023-06-25T17:45:00+00:00 | MW | 74 | 0 | 74 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008211_003 | Dismissed | Unplanned | Production unavailability | 2023-06-25T16:46:55+00:00 | 2023-06-25T03:53:00+00:00 | 2023-06-25T18:00:00+00:00 | MW | 74 | 0 | 74 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |
| Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008211_002 | Dismissed | Unplanned | Production unavailability | 2023-06-25T11:08:38+00:00 | 2023-06-25T03:53:00+00:00 | 2023-06-25T17:00:00+00:00 | MW | 74 | 0 | 74 | Failure | Grid |
Wind Onshore | 10Y1001A1001A59C |