This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

SSE Thermal Generation and Gas Storage REMIT information is no longer being updated on this page.
For SSE Thermal Generation and Gas Storage REMIT Information (Unavailability of Facilities and Other Market Information), please visit SSE Thermal REMIT.

Last update at: 2025-12-22T11:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 131 132 133 134 135 >
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_017 Dismissed Planned Production unavailability 2023-08-15T17:52:41+00:00 2023-07-07T18:00:00+00:00 2023-08-16T17:00:00+00:00 MW 290 0 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_017 Dismissed Planned Production unavailability 2023-08-14T17:59:55+00:00 2023-07-07T18:00:00+00:00 2023-08-16T18:00:00+00:00 MW 140 0 140 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_016 Dismissed Planned Production unavailability 2023-08-14T18:00:16+00:00 2023-07-07T18:00:00+00:00 2023-08-16T18:00:00+00:00 MW 290 0 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_016 Dismissed Planned Production unavailability 2023-08-14T17:59:39+00:00 2023-07-07T18:00:00+00:00 2023-08-16T18:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_016 Dismissed Planned Production unavailability 2023-08-14T11:37:26+00:00 2023-07-07T18:00:00+00:00 2023-08-15T18:00:00+00:00 MW 140 0 140 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_015 Dismissed Planned Production unavailability 2023-08-14T11:36:44+00:00 2023-07-07T18:00:00+00:00 2023-08-15T18:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_015 Dismissed Planned Production unavailability 2023-08-14T11:38:03+00:00 2023-07-07T18:00:00+00:00 2023-08-15T18:00:00+00:00 MW 290 0 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_015 Dismissed Planned Production unavailability 2023-08-11T17:15:14+00:00 2023-07-07T18:00:00+00:00 2023-08-15T12:00:00+00:00 MW 140 0 140 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_014 Dismissed Planned Production unavailability 2023-08-11T17:16:34+00:00 2023-07-07T18:00:00+00:00 2023-08-15T12:00:00+00:00 MW 290 0 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_014 Dismissed Planned Production unavailability 2023-08-11T17:13:55+00:00 2023-07-07T18:00:00+00:00 2023-08-15T12:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_014 Dismissed Planned Production unavailability 2023-08-10T16:57:52+00:00 2023-07-07T18:00:00+00:00 2023-08-12T18:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_013 Dismissed Planned Production unavailability 2023-08-01T09:42:59+00:00 2023-07-07T18:00:00+00:00 2023-08-11T17:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_013 Dismissed Planned Production unavailability 2023-08-10T16:58:18+00:00 2023-07-07T18:00:00+00:00 2023-08-12T18:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_013 Dismissed Planned Production unavailability 2023-08-10T16:57:12+00:00 2023-07-07T18:00:00+00:00 2023-08-12T18:00:00+00:00 MW 290 0 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_012 Dismissed Planned Production unavailability 2023-08-01T09:43:56+00:00 2023-07-07T18:00:00+00:00 2023-08-11T17:00:00+00:00 MW 290 0 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_012 Dismissed Planned Production unavailability 2023-08-01T09:42:31+00:00 2023-07-07T18:00:00+00:00 2023-08-11T17:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_012 Dismissed Planned Production unavailability 2023-07-26T18:02:34+00:00 2023-07-07T18:00:00+00:00 2023-08-04T17:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_011 Dismissed Planned Production unavailability 2023-07-19T17:38:03+00:00 2023-07-07T18:00:00+00:00 2023-07-28T17:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_011 Dismissed Planned Production unavailability 2023-07-26T18:02:46+00:00 2023-07-07T18:00:00+00:00 2023-08-04T17:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_011 Dismissed Planned Production unavailability 2023-07-26T18:03:36+00:00 2023-07-07T18:00:00+00:00 2023-08-04T17:00:00+00:00 MW 290 0 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_010 Dismissed Planned Production unavailability 2023-07-19T17:37:03+00:00 2023-07-07T18:00:00+00:00 2023-07-28T17:00:00+00:00 MW 290 0 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_010 Dismissed Planned Production unavailability 2023-07-26T18:01:42+00:00 2023-07-07T18:00:00+00:00 2023-08-04T17:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_010 Dismissed Planned Production unavailability 2023-07-17T10:49:11+00:00 2023-07-07T00:01:00+00:00 2023-07-31T23:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_009 Dismissed Planned Production unavailability 2023-07-17T08:58:43+00:00 2023-07-07T00:01:00+00:00 2023-07-20T23:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_009 Dismissed Planned Production unavailability 2023-07-19T17:38:22+00:00 2023-07-07T18:00:00+00:00 2023-07-28T17:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_009 Dismissed Planned Production unavailability 2023-07-19T16:53:42+00:00 2023-07-07T18:00:00+00:00 2023-07-21T17:00:00+00:00 MW 160 130 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_008 Dismissed Planned Production unavailability 2023-07-17T17:50:06+00:00 2023-07-07T18:00:00+00:00 2023-07-21T17:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_008 Dismissed Planned Production unavailability 2023-07-17T17:48:33+00:00 2023-07-07T18:00:00+00:00 2023-07-21T17:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_008 Dismissed Planned Production unavailability 2023-07-13T17:00:59+00:00 2023-07-07T00:01:00+00:00 2023-07-17T23:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_007 Dismissed Planned Production unavailability 2023-07-13T08:51:07+00:00 2023-07-07T00:01:00+00:00 2023-07-14T23:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_007 Dismissed Planned Production unavailability 2023-07-17T08:58:10+00:00 2023-07-07T18:00:00+00:00 2023-07-20T23:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_007 Dismissed Planned Production unavailability 2023-07-17T08:59:44+00:00 2023-07-07T18:00:00+00:00 2023-07-20T23:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_006 Dismissed Planned Production unavailability 2023-07-13T17:02:05+00:00 2023-07-07T18:00:00+00:00 2023-07-17T23:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_006 Dismissed Planned Production unavailability 2023-07-13T17:00:37+00:00 2023-07-07T18:00:00+00:00 2023-07-17T23:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_006 Dismissed Planned Production unavailability 2023-07-12T08:57:29+00:00 2023-07-07T00:01:00+00:00 2023-07-13T23:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_005 Dismissed Planned Production unavailability 2023-07-11T08:13:10+00:00 2023-07-07T00:01:00+00:00 2023-07-12T12:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_005 Dismissed Planned Production unavailability 2023-07-13T08:50:43+00:00 2023-07-07T18:00:00+00:00 2023-07-14T23:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_005 Dismissed Planned Production unavailability 2023-07-13T08:50:30+00:00 2023-07-07T18:00:00+00:00 2023-07-14T23:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_004 Dismissed Planned Production unavailability 2023-07-12T08:57:48+00:00 2023-07-07T18:00:00+00:00 2023-07-13T23:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_004 Dismissed Planned Production unavailability 2023-07-12T08:57:04+00:00 2023-07-07T18:00:00+00:00 2023-07-13T23:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_004 Dismissed Planned Production unavailability 2023-07-10T08:44:08+00:00 2023-07-07T00:01:00+00:00 2023-07-11T12:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_003 Dismissed Planned Production unavailability 2023-07-07T18:28:38+00:00 2023-07-07T00:01:00+00:00 2023-07-10T15:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_003 Dismissed Planned Production unavailability 2023-07-11T08:13:19+00:00 2023-07-07T18:00:00+00:00 2023-07-12T12:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_003 Dismissed Planned Production unavailability 2023-07-11T08:12:46+00:00 2023-07-07T18:00:00+00:00 2023-07-12T12:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008233_002 Dismissed Planned Production unavailability 2023-07-10T08:45:06+00:00 2023-07-07T18:00:00+00:00 2023-07-11T12:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008234_002 Dismissed Planned Production unavailability 2023-07-10T08:43:27+00:00 2023-07-07T18:00:00+00:00 2023-07-11T12:00:00+00:00 MW 160 0 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_002 Dismissed Planned Production unavailability 2023-07-06T16:45:48+00:00 2023-07-07T00:01:00+00:00 2023-07-09T03:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_HADHW-1 48W00000HADHW-1J
SSE GENERATION
48X000000000077M 0000000000000000000007672_002 Inactive Planned Production unavailability 2023-08-16T18:02:32+00:00 2023-08-16T16:00:00+00:00 2023-08-16T17:00:00+00:00 MW 120 0 120 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_HADHW-1 48W00000HADHW-1J
SSE GENERATION
48X000000000077M 0000000000000000000007672_001 Dismissed Planned Production unavailability 2022-10-25T16:56:46+00:00 2023-08-16T16:00:00+00:00 2023-08-16T17:00:00+00:00 MW 120 0 120 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008220_001 Dismissed Planned Production unavailability 2023-07-05T13:36:01+00:00 2023-07-07T00:01:00+00:00 2023-07-09T06:00:00+00:00 MW 140 0 140 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A