| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 119 120 121 122 123 > | ||||||||||||||||||
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008417_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:23+00:00 | 2023-10-09T08:01:00+00:00 | 2023-10-13T18:00:00+00:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008415_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:49+00:00 | 2023-10-09T08:01:00+00:00 | 2023-10-13T18:00:00+00:00 | MW | 138 | 0 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008458_002 | Dismissed | Planned | Production unavailability | 2023-09-29T10:21:21+00:00 | 2023-10-09T08:01:00+00:00 | 2023-10-13T18:00:00+00:00 | MW | 100 | 40 | 140 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008458_001 | Dismissed | Planned | Production unavailability | 2023-09-28T18:47:55+00:00 | 2023-10-09T08:01:00+00:00 | 2023-10-13T18:00:00+00:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Wind Offshore | 10YGB----------A |
| T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008415_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:50:03+00:00 | 2023-10-09T08:01:00+00:00 | 2023-10-13T18:00:00+00:00 | MW | 140 | 0 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008417_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:56:38+00:00 | 2023-10-09T08:01:00+00:00 | 2023-10-13T18:00:00+00:00 | MW | 300 | 0 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_021 | Dismissed | Planned | Production unavailability | 2023-10-12T11:23:27+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-12T11:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_020 | Dismissed | Planned | Production unavailability | 2023-10-12T10:58:12+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-12T11:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_019 | Dismissed | Planned | Production unavailability | 2023-10-10T17:00:01+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-12T17:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_018 | Dismissed | Planned | Production unavailability | 2023-10-09T17:11:14+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-11T17:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_017 | Dismissed | Planned | Production unavailability | 2023-10-07T23:11:43+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_016 | Dismissed | Planned | Production unavailability | 2023-10-06T21:23:54+00:00 | 2023-10-09T20:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_015 | Dismissed | Planned | Production unavailability | 2023-10-06T20:28:57+00:00 | 2023-10-07T20:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_014 | Dismissed | Planned | Production unavailability | 2023-10-06T17:02:08+00:00 | 2023-10-06T20:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_013 | Dismissed | Planned | Production unavailability | 2023-10-06T15:31:09+00:00 | 2023-10-06T19:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_012 | Dismissed | Planned | Production unavailability | 2023-10-05T17:05:34+00:00 | 2023-10-06T17:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_011 | Dismissed | Planned | Production unavailability | 2023-10-04T17:32:50+00:00 | 2023-10-06T14:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_010 | Dismissed | Planned | Production unavailability | 2023-10-04T17:32:17+00:00 | 2023-10-06T14:01:00+00:00 | 2023-10-10T12:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_009 | Dismissed | Planned | Production unavailability | 2023-10-01T11:35:32+00:00 | 2023-10-06T17:01:00+00:00 | 2023-10-10T12:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_008 | Dismissed | Planned | Production unavailability | 2023-09-30T14:25:44+00:00 | 2023-10-01T17:01:00+00:00 | 2023-10-06T12:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_007 | Dismissed | Planned | Production unavailability | 2023-09-30T12:34:52+00:00 | 2023-09-30T17:01:00+00:00 | 2023-10-06T12:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_006 | Dismissed | Planned | Production unavailability | 2023-09-28T18:30:35+00:00 | 2023-09-30T15:01:00+00:00 | 2023-10-06T12:00:00+00:00 | MW | 100 | 200 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_005 | Dismissed | Planned | Production unavailability | 2023-09-28T12:48:56+00:00 | 2023-09-29T18:01:00+00:00 | 2023-10-04T12:00:00+00:00 | MW | 90 | 210 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_004 | Dismissed | Planned | Production unavailability | 2023-09-25T12:17:43+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-04T12:00:00+00:00 | MW | 90 | 210 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_003 | Dismissed | Planned | Production unavailability | 2023-09-25T11:15:04+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-04T12:00:00+00:00 | MW | 90 | 210 | 300 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_002 | Dismissed | Planned | Production unavailability | 2023-09-25T11:10:54+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-04T12:00:00+00:00 | MW | 90 | 210 | 300 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008410_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:39:29+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-04T12:00:00+00:00 | MW | 90 | 210 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_019 | Dismissed | Planned | Production unavailability | 2023-10-12T11:23:12+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-12T11:01:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_018 | Dismissed | Planned | Production unavailability | 2023-10-12T11:00:32+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-12T11:01:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_017 | Dismissed | Planned | Production unavailability | 2023-10-10T17:01:41+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-12T17:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_016 | Dismissed | Planned | Production unavailability | 2023-10-09T17:12:48+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-11T17:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_015 | Dismissed | Planned | Production unavailability | 2023-10-07T23:14:35+00:00 | 2023-10-08T00:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_014 | Dismissed | Planned | Production unavailability | 2023-10-06T21:23:37+00:00 | 2023-10-09T20:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_013 | Dismissed | Planned | Production unavailability | 2023-10-06T20:29:28+00:00 | 2023-10-07T20:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_012 | Dismissed | Planned | Production unavailability | 2023-10-06T17:03:04+00:00 | 2023-10-06T20:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_011 | Dismissed | Planned | Production unavailability | 2023-10-06T15:32:57+00:00 | 2023-10-06T19:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_010 | Dismissed | Planned | Production unavailability | 2023-10-06T11:30:07+00:00 | 2023-10-06T17:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_009 | Dismissed | Planned | Production unavailability | 2023-10-04T17:36:35+00:00 | 2023-10-06T14:01:00+00:00 | 2023-10-10T17:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_008 | Dismissed | Planned | Production unavailability | 2023-10-01T11:36:29+00:00 | 2023-10-06T17:01:00+00:00 | 2023-10-10T12:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_007 | Dismissed | Planned | Production unavailability | 2023-09-30T14:26:58+00:00 | 2023-10-01T17:01:00+00:00 | 2023-10-06T12:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_006 | Dismissed | Planned | Production unavailability | 2023-09-30T12:36:59+00:00 | 2023-09-30T17:01:00+00:00 | 2023-10-06T12:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_005 | Dismissed | Planned | Production unavailability | 2023-09-28T18:38:21+00:00 | 2023-09-30T15:01:00+00:00 | 2023-10-06T12:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_004 | Dismissed | Planned | Production unavailability | 2023-09-28T12:50:35+00:00 | 2023-09-29T18:01:00+00:00 | 2023-10-04T12:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_003 | Dismissed | Planned | Production unavailability | 2023-09-25T12:18:19+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-04T12:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_002 | Dismissed | Planned | Production unavailability | 2023-09-25T11:14:47+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-04T12:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Grid |
Wind Offshore | 10YGB----------A |
| T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008411_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:41:24+00:00 | 2023-09-29T12:01:00+00:00 | 2023-10-04T12:00:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008497_006 | Inactive | Planned | Consumption unavailability | 2023-10-12T09:47:32+00:00 | 2023-10-10T23:45:00+00:00 | 2023-10-12T08:40:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008497_005 | Dismissed | Planned | Consumption unavailability | 2023-10-12T08:37:33+00:00 | 2023-10-10T23:45:00+00:00 | 2023-10-12T08:40:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008497_004 | Dismissed | Planned | Consumption unavailability | 2023-10-11T22:38:02+00:00 | 2023-10-10T23:45:00+00:00 | 2023-10-13T03:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008497_003 | Dismissed | Planned | Consumption unavailability | 2023-10-11T16:13:49+00:00 | 2023-10-10T23:45:00+00:00 | 2023-10-12T00:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |