Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 90 91 92 93 94 >
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008329_003 Dismissed Planned Production unavailability 2023-08-22T11:36:13+01:00 2023-08-22T12:31:00+01:00 2023-08-23T08:00:00+01:00 MW 110 50 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008331_003 Dismissed Planned Production unavailability 2023-08-22T11:40:38+01:00 2023-08-22T12:30:00+01:00 2023-08-23T08:00:00+01:00 MW 210 80 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008307_003 Inactive Planned Production unavailability 2023-08-23T09:02:32+01:00 2023-08-16T17:01:00+01:00 2023-08-23T08:00:00+01:00 MW 70 70 140 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008307_002 Dismissed Planned Production unavailability 2023-08-17T17:10:18+01:00 2023-08-16T17:01:00+01:00 2023-08-23T08:00:00+01:00 MW 70 70 140 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008331_002 Dismissed Planned Production unavailability 2023-08-22T11:38:45+01:00 2023-08-22T12:31:00+01:00 2023-08-23T08:00:00+01:00 MW 210 80 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008329_002 Dismissed Planned Production unavailability 2023-08-22T10:35:35+01:00 2023-08-22T12:01:00+01:00 2023-08-23T08:00:00+01:00 MW 110 50 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008327_002 Dismissed Planned Production unavailability 2023-08-22T10:36:42+01:00 2023-08-22T12:01:00+01:00 2023-08-23T08:00:00+01:00 MW 268 90 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008327_001 Dismissed Planned Production unavailability 2023-08-22T09:18:15+01:00 2023-08-22T10:31:00+01:00 2023-08-23T08:00:00+01:00 MW 268 90 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008329_001 Dismissed Planned Production unavailability 2023-08-22T09:24:15+01:00 2023-08-22T10:31:00+01:00 2023-08-23T08:00:00+01:00 MW 110 50 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008331_001 Dismissed Planned Production unavailability 2023-08-22T11:34:02+01:00 2023-08-22T12:30:00+01:00 2023-08-23T08:00:00+01:00 MW 210 80 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-4 48W00000SGRWO-4F
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008307_001 Dismissed Planned Production unavailability 2023-08-15T17:51:35+01:00 2023-08-16T17:01:00+01:00 2023-08-22T18:00:00+01:00 MW 70 70 140 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008335_006 Inactive Unplanned Production unavailability 2023-08-23T07:32:32+01:00 2023-08-23T05:23:00+01:00 2023-08-23T06:30:00+01:00 MW 780 400 1180 Failure
Plant Fault - Generator
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008335_005 Dismissed Unplanned Production unavailability 2023-08-23T05:36:34+01:00 2023-08-23T05:23:00+01:00 2023-08-23T06:30:00+01:00 MW 780 400 1180 Failure
Plant Fault - Generator
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008335_004 Dismissed Unplanned Production unavailability 2023-08-23T04:44:53+01:00 2023-08-23T04:40:00+01:00 2023-08-23T05:20:00+01:00 MW 455 725 1180 Failure
Plant Fault - Generator
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008335_003 Dismissed Unplanned Production unavailability 2023-08-23T04:24:55+01:00 2023-08-23T04:20:00+01:00 2023-08-23T05:20:00+01:00 MW 760 420 1180 Failure
Plant Fault - Generator
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008335_002 Dismissed Unplanned Production unavailability 2023-08-23T02:38:11+01:00 2023-08-23T02:01:00+01:00 2023-08-23T05:00:00+01:00 MW 850 330 1180 Failure
Plant Fault - Generator
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008335_001 Dismissed Unplanned Production unavailability 2023-08-23T02:14:17+01:00 2023-08-23T02:01:00+01:00 2023-08-23T03:00:00+01:00 MW 765 415 1180 Failure
Plant Fault - Generator
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008334_002 Inactive Unplanned Production unavailability 2023-08-23T03:02:31+01:00 2023-08-23T01:00:00+01:00 2023-08-23T02:00:00+01:00 MW 880 300 1180 Failure
Plant Fault - Generator
Fossil Gas 10YGB----------A
T_PEHE-1 48W000000PEHE-15
SSE Thermal Generation (Scotland) Ltd
48X0000000003024 0000000000000000000008334_001 Dismissed Unplanned Production unavailability 2023-08-23T01:08:31+01:00 2023-08-23T01:00:00+01:00 2023-08-23T02:00:00+01:00 MW 880 300 1180 Failure
Plant Fault - Generator
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000008333_002 Inactive Planned Production unavailability 2023-08-23T01:02:31+01:00 2023-08-22T23:25:00+01:00 2023-08-22T23:59:00+01:00 MW 710 0 710 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000008333_001 Dismissed Planned Production unavailability 2023-08-22T17:10:33+01:00 2023-08-22T23:25:00+01:00 2023-08-22T23:59:00+01:00 MW 710 0 710 Foreseen Maintenance
Plant Fault - Electrical Equipment
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000008332_003 Inactive Unplanned Production unavailability 2023-08-23T00:32:31+01:00 2023-08-22T13:02:00+01:00 2023-08-22T23:25:00+01:00 MW 370 340 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000008332_002 Dismissed Unplanned Production unavailability 2023-08-22T16:17:03+01:00 2023-08-22T13:02:00+01:00 2023-08-22T23:25:00+01:00 MW 370 340 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000008332_001 Dismissed Unplanned Production unavailability 2023-08-22T13:02:28+01:00 2023-08-22T13:02:00+01:00 2023-08-23T18:00:00+01:00 MW 370 340 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000008330_002 Inactive Planned Production unavailability 2023-08-22T14:02:32+01:00 2023-08-22T09:37:00+01:00 2023-08-22T13:00:00+01:00 MW 710 0 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_MEDP-1 48W000000MEDP-12
MEDWAY POWER LTD
48X000000000076O 0000000000000000000008330_001 Dismissed Planned Production unavailability 2023-08-22T09:38:41+01:00 2023-08-22T09:37:00+01:00 2023-08-22T13:00:00+01:00 MW 710 0 710 Failure
Plant Fault - Boiler
Fossil Gas 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_021 Inactive Planned Production unavailability 2023-08-22T13:32:32+01:00 2023-07-07T18:00:00+01:00 2023-08-22T12:30:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_020 Dismissed Planned Production unavailability 2023-08-22T11:44:07+01:00 2023-07-07T18:00:00+01:00 2023-08-22T12:30:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_019 Dismissed Planned Production unavailability 2023-08-22T10:36:05+01:00 2023-07-07T18:00:00+01:00 2023-08-22T12:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_018 Dismissed Planned Production unavailability 2023-08-22T09:21:19+01:00 2023-07-07T18:00:00+01:00 2023-08-22T10:30:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_017 Dismissed Planned Production unavailability 2023-08-21T18:05:34+01:00 2023-07-07T18:00:00+01:00 2023-08-23T18:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_016 Dismissed Planned Production unavailability 2023-08-15T17:56:58+01:00 2023-07-07T18:00:00+01:00 2023-08-22T18:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_015 Dismissed Planned Production unavailability 2023-08-14T18:00:38+01:00 2023-07-07T18:00:00+01:00 2023-08-16T18:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_014 Dismissed Planned Production unavailability 2023-08-14T11:39:29+01:00 2023-07-07T18:00:00+01:00 2023-08-15T18:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008258_014 Inactive Planned Production unavailability 2023-08-22T13:32:32+01:00 2023-08-16T17:01:00+01:00 2023-08-22T12:30:00+01:00 MW 200 90 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008258_013 Dismissed Planned Production unavailability 2023-08-22T11:41:17+01:00 2023-08-16T17:01:00+01:00 2023-08-22T12:30:00+01:00 MW 200 90 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_013 Dismissed Planned Production unavailability 2023-08-11T17:15:40+01:00 2023-07-07T18:00:00+01:00 2023-08-15T12:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_012 Dismissed Planned Production unavailability 2023-08-10T16:56:13+01:00 2023-07-07T18:00:00+01:00 2023-08-12T18:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008258_012 Dismissed Planned Production unavailability 2023-08-22T11:39:50+01:00 2023-08-16T17:01:00+01:00 2023-08-22T12:29:00+01:00 MW 200 90 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008258_011 Dismissed Planned Production unavailability 2023-08-22T11:34:55+01:00 2023-08-16T17:01:00+01:00 2023-08-22T12:30:00+01:00 MW 200 90 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_011 Dismissed Planned Production unavailability 2023-08-01T09:44:23+01:00 2023-07-07T18:00:00+01:00 2023-08-11T17:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_010 Dismissed Planned Production unavailability 2023-07-26T18:04:24+01:00 2023-07-07T18:00:00+01:00 2023-08-04T17:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008258_010 Dismissed Planned Production unavailability 2023-08-21T15:24:51+01:00 2023-08-16T17:01:00+01:00 2023-08-23T08:00:00+01:00 MW 200 90 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008258_009 Dismissed Planned Production unavailability 2023-08-17T17:13:50+01:00 2023-08-16T17:01:00+01:00 2023-08-23T08:00:00+01:00 MW 150 140 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_009 Dismissed Planned Production unavailability 2023-07-19T17:36:00+01:00 2023-07-07T18:00:00+01:00 2023-07-28T17:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_008 Dismissed Planned Production unavailability 2023-07-17T17:49:14+01:00 2023-07-07T18:00:00+01:00 2023-07-21T17:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008258_008 Dismissed Planned Production unavailability 2023-08-15T17:54:48+01:00 2023-08-16T17:01:00+01:00 2023-08-22T18:00:00+01:00 MW 140 150 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-5 48W00000SGRWO-5D
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008258_007 Dismissed Planned Production unavailability 2023-08-14T18:00:29+01:00 2023-08-16T18:01:00+01:00 2023-08-28T12:00:00+01:00 MW 10 280 290 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008232_007 Dismissed Planned Production unavailability 2023-07-17T09:00:11+01:00 2023-07-07T18:00:00+01:00 2023-07-20T23:00:00+01:00 MW 358 0 358 Shutdown
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-3 48W00000SGRWO-3H
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000008306_007 Inactive Planned Production unavailability 2023-08-22T13:32:32+01:00 2023-08-16T17:01:00+01:00 2023-08-22T12:30:00+01:00 MW 30 130 160 Shutdown
Commissioning
Wind Offshore 10YGB----------A