Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 67 68 69 70 71 > | ||||||||||||||||||
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_009 | Dismissed | Planned | Production unavailability | 2023-08-25T10:11:59+01:00 | 2023-07-18T14:00:00+01:00 | 2023-08-31T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_008 | Dismissed | Planned | Production unavailability | 2023-08-22T11:15:12+01:00 | 2023-07-18T14:00:00+01:00 | 2023-08-28T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_007 | Dismissed | Planned | Production unavailability | 2023-08-18T09:17:15+01:00 | 2023-07-18T14:00:00+01:00 | 2023-08-23T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_006 | Dismissed | Planned | Production unavailability | 2023-08-14T14:35:10+01:00 | 2023-07-18T14:00:00+01:00 | 2023-08-20T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_005 | Dismissed | Planned | Production unavailability | 2023-08-09T17:29:44+01:00 | 2023-07-18T14:00:00+01:00 | 2023-08-15T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_004 | Dismissed | Planned | Production unavailability | 2023-08-04T15:43:08+01:00 | 2023-07-18T14:00:00+01:00 | 2023-08-11T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_003 | Dismissed | Planned | Production unavailability | 2023-07-28T15:55:32+01:00 | 2023-07-18T14:00:00+01:00 | 2023-08-07T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_002 | Dismissed | Planned | Production unavailability | 2023-07-24T10:50:18+01:00 | 2023-07-18T14:00:00+01:00 | 2023-08-02T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008252_001 | Dismissed | Planned | Production unavailability | 2023-07-18T13:47:22+01:00 | 2023-07-18T14:00:00+01:00 | 2023-07-28T07:00:00+01:00 | MW | 302 | 0 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008640_002 | Inactive | Unplanned | Production unavailability | 2023-11-27T12:02:32+00:00 | 2023-11-27T04:55:00+00:00 | 2023-11-27T11:00:00+00:00 | MW | 370 | 340 | 710 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008640_001 | Dismissed | Unplanned | Production unavailability | 2023-11-27T04:55:39+00:00 | 2023-11-27T04:55:00+00:00 | 2023-11-27T11:00:00+00:00 | MW | 370 | 340 | 710 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000006400_005 | Dismissed | Planned | Production unavailability | 2023-11-27T10:33:24+00:00 | 2025-04-04T23:00:00+01:00 | 2025-04-11T23:00:00+01:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000006400_004 | Dismissed | Planned | Production unavailability | 2022-10-26T10:11:01+01:00 | 2025-04-04T23:00:00+01:00 | 2025-04-11T23:00:00+01:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000006400_003 | Dismissed | Planned | Production unavailability | 2022-08-05T15:14:33+01:00 | 2025-02-21T23:00:00+00:00 | 2025-02-28T23:00:00+00:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000006400_002 | Dismissed | Planned | Production unavailability | 2022-03-23T10:54:49+00:00 | 2025-02-21T23:00:00+00:00 | 2025-02-28T23:00:00+00:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000006400_001 | Dismissed | Planned | Production unavailability | 2021-11-03T11:30:03+00:00 | 2025-02-21T23:00:00+00:00 | 2025-02-28T23:00:00+00:00 | MW | 400 | 780 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008639_002 | Inactive | Planned | Production unavailability | 2023-11-26T15:32:32+00:00 | 2023-11-26T13:30:00+00:00 | 2023-11-26T14:30:00+00:00 | MW | 530 | 310 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008639_001 | Dismissed | Planned | Production unavailability | 2023-11-26T06:30:45+00:00 | 2023-11-26T13:30:00+00:00 | 2023-11-26T14:30:00+00:00 | MW | 530 | 310 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008638_002 | Inactive | Planned | Production unavailability | 2023-11-26T13:32:32+00:00 | 2023-11-26T11:30:00+00:00 | 2023-11-26T12:30:00+00:00 | MW | 530 | 310 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008638_001 | Dismissed | Planned | Production unavailability | 2023-11-26T06:27:04+00:00 | 2023-11-26T11:30:00+00:00 | 2023-11-26T12:30:00+00:00 | MW | 530 | 310 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008637_002 | Inactive | Planned | Production unavailability | 2023-11-26T11:32:32+00:00 | 2023-11-26T09:00:00+00:00 | 2023-11-26T10:30:00+00:00 | MW | 530 | 310 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008637_001 | Dismissed | Planned | Production unavailability | 2023-11-26T06:24:45+00:00 | 2023-11-26T09:00:00+00:00 | 2023-11-26T10:30:00+00:00 | MW | 530 | 310 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008630_002 | Inactive | Planned | Production unavailability | 2023-11-25T20:17:31+00:00 | 2023-11-25T18:56:00+00:00 | 2023-11-25T19:05:00+00:00 | MW | 210 | 500 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008631_002 | Inactive | Planned | Production unavailability | 2023-11-25T20:17:31+00:00 | 2023-11-25T19:06:00+00:00 | 2023-11-25T19:15:00+00:00 | MW | 100 | 610 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008631_001 | Dismissed | Planned | Production unavailability | 2023-11-25T16:45:49+00:00 | 2023-11-25T19:06:00+00:00 | 2023-11-25T19:15:00+00:00 | MW | 100 | 610 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008630_001 | Dismissed | Planned | Production unavailability | 2023-11-25T16:43:17+00:00 | 2023-11-25T18:56:00+00:00 | 2023-11-25T19:05:00+00:00 | MW | 210 | 500 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008636_002 | Inactive | Planned | Production unavailability | 2023-11-25T20:02:31+00:00 | 2023-11-25T17:20:00+00:00 | 2023-11-25T19:00:00+00:00 | MW | 140 | 700 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008629_002 | Inactive | Planned | Production unavailability | 2023-11-25T20:02:31+00:00 | 2023-11-25T18:46:00+00:00 | 2023-11-25T18:55:00+00:00 | MW | 310 | 400 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008629_001 | Dismissed | Planned | Production unavailability | 2023-11-25T16:41:04+00:00 | 2023-11-25T18:46:00+00:00 | 2023-11-25T18:55:00+00:00 | MW | 310 | 400 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008636_001 | Dismissed | Planned | Production unavailability | 2023-11-25T17:21:27+00:00 | 2023-11-25T17:20:00+00:00 | 2023-11-25T19:00:00+00:00 | MW | 140 | 700 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008628_002 | Inactive | Planned | Production unavailability | 2023-11-25T19:47:31+00:00 | 2023-11-25T18:36:00+00:00 | 2023-11-25T18:45:00+00:00 | MW | 410 | 300 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008627_002 | Inactive | Planned | Production unavailability | 2023-11-25T19:47:31+00:00 | 2023-11-25T18:26:00+00:00 | 2023-11-25T18:35:00+00:00 | MW | 510 | 200 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008627_001 | Dismissed | Planned | Production unavailability | 2023-11-25T16:37:43+00:00 | 2023-11-25T18:26:00+00:00 | 2023-11-25T18:35:00+00:00 | MW | 510 | 200 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008628_001 | Dismissed | Planned | Production unavailability | 2023-11-25T16:39:42+00:00 | 2023-11-25T18:36:00+00:00 | 2023-11-25T18:45:00+00:00 | MW | 410 | 300 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008602_009 | Inactive | Planned | Consumption unavailability | 2023-11-25T19:32:31+00:00 | 2023-11-24T04:50:00+00:00 | 2023-11-25T18:30:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008602_008 | Dismissed | Planned | Consumption unavailability | 2023-11-25T08:19:51+00:00 | 2023-11-24T04:50:00+00:00 | 2023-11-25T18:30:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008601_008 | Inactive | Planned | Consumption unavailability | 2023-11-25T19:32:31+00:00 | 2023-11-24T04:40:00+00:00 | 2023-11-25T18:30:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008602_007 | Dismissed | Planned | Consumption unavailability | 2023-11-25T00:10:46+00:00 | 2023-11-24T04:50:00+00:00 | 2023-11-25T09:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008601_007 | Dismissed | Planned | Consumption unavailability | 2023-11-25T08:20:42+00:00 | 2023-11-24T04:40:00+00:00 | 2023-11-25T18:30:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008601_006 | Dismissed | Planned | Consumption unavailability | 2023-11-25T00:10:17+00:00 | 2023-11-24T04:40:00+00:00 | 2023-11-25T09:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008602_006 | Dismissed | Planned | Consumption unavailability | 2023-11-24T19:49:25+00:00 | 2023-11-24T04:50:00+00:00 | 2023-11-25T01:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008602_005 | Dismissed | Planned | Consumption unavailability | 2023-11-24T15:58:59+00:00 | 2023-11-24T04:50:00+00:00 | 2023-11-24T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008601_005 | Dismissed | Planned | Consumption unavailability | 2023-11-24T19:48:40+00:00 | 2023-11-24T04:40:00+00:00 | 2023-11-25T01:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008601_004 | Dismissed | Planned | Consumption unavailability | 2023-11-24T15:58:12+00:00 | 2023-11-24T04:40:00+00:00 | 2023-11-24T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008602_004 | Dismissed | Planned | Consumption unavailability | 2023-11-24T12:06:22+00:00 | 2023-11-24T04:50:00+00:00 | 2023-11-24T17:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008602_003 | Dismissed | Planned | Consumption unavailability | 2023-11-24T08:29:35+00:00 | 2023-11-24T04:50:00+00:00 | 2023-11-24T13:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008601_003 | Dismissed | Planned | Consumption unavailability | 2023-11-24T12:46:14+00:00 | 2023-11-24T04:40:00+00:00 | 2023-11-24T17:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008601_002 | Dismissed | Planned | Consumption unavailability | 2023-11-24T06:15:56+00:00 | 2023-11-24T04:40:00+00:00 | 2023-11-24T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008602_002 | Dismissed | Planned | Consumption unavailability | 2023-11-24T06:16:09+00:00 | 2023-11-24T04:50:00+00:00 | 2023-11-24T10:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000008626_002 | Inactive | Planned | Production unavailability | 2023-11-25T19:32:31+00:00 | 2023-11-25T18:16:00+00:00 | 2023-11-25T18:25:00+00:00 | MW | 610 | 100 | 710 | Shutdown | Plant Fault - Gas Turbine |
Fossil Gas | 10YGB----------A |