Last update at: 2024-09-20T14:00:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 45 46 47 48 49 > | ||||||||||||||||||
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008870_002 | Inactive | Planned | Production unavailability | 2024-03-04T11:02:32+00:00 | 2024-03-02T10:00:00+00:00 | 2024-03-04T10:00:00+00:00 | MW | 237 | 65 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008870_001 | Dismissed | Planned | Production unavailability | 2024-02-22T13:48:29+00:00 | 2024-03-02T10:00:00+00:00 | 2024-03-04T10:00:00+00:00 | MW | 237 | 65 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000005474_007 | Inactive | Planned | Production unavailability | 2024-03-04T04:02:32+00:00 | 2024-02-28T11:46:00+00:00 | 2024-03-04T03:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000005474_006 | Dismissed | Planned | Production unavailability | 2024-03-04T02:38:08+00:00 | 2024-02-28T11:46:00+00:00 | 2024-03-04T03:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000005474_005 | Dismissed | Planned | Production unavailability | 2024-02-28T14:04:27+00:00 | 2024-02-28T11:46:00+00:00 | 2024-03-04T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000005474_004 | Dismissed | Planned | Production unavailability | 2024-02-28T11:29:50+00:00 | 2024-02-28T11:45:00+00:00 | 2024-03-04T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000005474_003 | Dismissed | Planned | Production unavailability | 2022-08-05T15:14:33+01:00 | 2024-02-29T23:00:00+00:00 | 2024-03-04T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000005474_002 | Dismissed | Planned | Production unavailability | 2022-03-23T10:54:49+00:00 | 2024-02-29T23:00:00+00:00 | 2024-03-04T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_MEDP-1 | 48W000000MEDP-12 | MEDWAY POWER LTD |
48X000000000076O | 0000000000000000000005474_001 | Dismissed | Planned | Production unavailability | 2021-01-20T12:31:50+00:00 | 2024-02-29T23:00:00+00:00 | 2024-03-04T06:00:00+00:00 | MW | 710 | 0 | 710 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008869_002 | Inactive | Planned | Production unavailability | 2024-03-02T11:02:32+00:00 | 2024-02-29T10:00:00+00:00 | 2024-03-02T10:00:00+00:00 | MW | 250 | 52 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008869_001 | Dismissed | Planned | Production unavailability | 2024-02-22T13:46:26+00:00 | 2024-02-29T10:00:00+00:00 | 2024-03-02T10:00:00+00:00 | MW | 250 | 52 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008906_002 | Dismissed | Planned | Production unavailability | 2024-03-01T09:55:36+00:00 | 2024-03-01T08:50:00+00:00 | 2024-03-01T09:15:00+00:00 | MW | 10 | 155 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000008906_001 | Dismissed | Planned | Production unavailability | 2024-03-01T08:47:59+00:00 | 2024-03-01T08:50:00+00:00 | 2024-03-01T09:15:00+00:00 | MW | 10 | 155 | 165 | Foreseen Maintenance | Testing |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_005 | Inactive | Planned | Consumption unavailability | 2024-02-29T22:02:31+00:00 | 2024-02-28T23:10:00+00:00 | 2024-02-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_004 | Dismissed | Planned | Consumption unavailability | 2024-02-29T08:00:32+00:00 | 2024-02-28T23:10:00+00:00 | 2024-02-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008896_004 | Inactive | Planned | Consumption unavailability | 2024-02-29T22:02:31+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008896_003 | Dismissed | Planned | Consumption unavailability | 2024-02-29T07:59:58+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T21:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_003 | Dismissed | Planned | Consumption unavailability | 2024-02-29T05:09:16+00:00 | 2024-02-28T23:10:00+00:00 | 2024-02-29T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008896_002 | Dismissed | Planned | Consumption unavailability | 2024-02-29T05:08:47+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_002 | Dismissed | Planned | Consumption unavailability | 2024-02-28T23:08:05+00:00 | 2024-02-28T23:10:00+00:00 | 2024-02-29T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008896_001 | Dismissed | Planned | Consumption unavailability | 2024-02-28T23:05:20+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008897_001 | Dismissed | Planned | Consumption unavailability | 2024-02-28T23:06:43+00:00 | 2024-02-29T00:30:00+00:00 | 2024-02-29T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000008850_003 | Inactive | Planned | Production unavailability | 2024-02-29T20:02:31+00:00 | 2024-02-27T08:00:00+00:00 | 2024-02-29T19:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000008850_002 | Dismissed | Planned | Production unavailability | 2024-02-29T18:54:57+00:00 | 2024-02-27T08:00:00+00:00 | 2024-02-29T19:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000008850_001 | Dismissed | Planned | Production unavailability | 2024-02-14T15:05:45+00:00 | 2024-02-27T08:00:00+00:00 | 2024-03-01T17:00:00+00:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008895_002 | Inactive | Planned | Production unavailability | 2024-02-29T17:02:32+00:00 | 2024-02-29T07:00:00+00:00 | 2024-02-29T16:00:00+00:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008895_001 | Dismissed | Planned | Production unavailability | 2024-02-28T22:16:49+00:00 | 2024-02-29T07:00:00+00:00 | 2024-02-29T16:00:00+00:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008898_002 | Inactive | Planned | Production unavailability | 2024-02-29T12:32:32+00:00 | 2024-02-29T10:30:00+00:00 | 2024-02-29T11:30:00+00:00 | MW | 420 | 420 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008898_001 | Dismissed | Planned | Production unavailability | 2024-02-29T08:30:27+00:00 | 2024-02-29T10:30:00+00:00 | 2024-02-29T11:30:00+00:00 | MW | 420 | 420 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008868_002 | Inactive | Planned | Production unavailability | 2024-02-29T11:02:32+00:00 | 2024-02-27T10:00:00+00:00 | 2024-02-29T10:00:00+00:00 | MW | 263 | 39 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008868_001 | Dismissed | Planned | Production unavailability | 2024-02-22T12:49:19+00:00 | 2024-02-27T10:00:00+00:00 | 2024-02-29T10:00:00+00:00 | MW | 263 | 39 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_CLDNW-1 | 48W00000CLDNW-1Q | Clyde Windfarm (Scotland) Limited |
48X000000000071Y | 0000000000000000000008894_003 | Inactive | Unplanned | Production unavailability | 2024-02-28T21:32:32+00:00 | 2024-02-28T18:05:00+00:00 | 2024-02-28T20:30:00+00:00 | MW | 100 | 87 | 187 | Shutdown | Plant Fault - Electrical Equipment |
Wind Onshore | 10YGB----------A |
T_CLDNW-1 | 48W00000CLDNW-1Q | Clyde Windfarm (Scotland) Limited |
48X000000000071Y | 0000000000000000000008894_002 | Dismissed | Unplanned | Production unavailability | 2024-02-28T20:29:50+00:00 | 2024-02-28T18:05:00+00:00 | 2024-02-28T20:30:00+00:00 | MW | 100 | 87 | 187 | Shutdown | Plant Fault - Electrical Equipment |
Wind Onshore | 10YGB----------A |
T_CLDNW-1 | 48W00000CLDNW-1Q | Clyde Windfarm (Scotland) Limited |
48X000000000071Y | 0000000000000000000008894_001 | Dismissed | Unplanned | Production unavailability | 2024-02-28T18:07:53+00:00 | 2024-02-28T18:05:00+00:00 | 2024-02-28T21:30:00+00:00 | MW | 100 | 87 | 187 | Shutdown | Plant Fault - Electrical Equipment |
Wind Onshore | 10YGB----------A |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008874_002 | Inactive | Planned | Production unavailability | 2024-02-27T18:02:32+00:00 | 2024-02-26T14:00:00+00:00 | 2024-02-27T17:00:00+00:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
Meentycat | 47W000000000272G | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000008874_001 | Dismissed | Planned | Production unavailability | 2024-02-23T14:49:15+00:00 | 2024-02-26T14:00:00+00:00 | 2024-02-27T17:00:00+00:00 | MW | 85 | 0 | 85 | Foreseen Maintenance | Grid |
Wind Onshore | 10Y1001A1001A59C |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008867_003 | Inactive | Planned | Production unavailability | 2024-02-27T11:02:31+00:00 | 2024-02-25T10:00:00+00:00 | 2024-02-27T10:00:00+00:00 | MW | 276 | 26 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008867_002 | Dismissed | Planned | Production unavailability | 2024-02-22T12:49:53+00:00 | 2024-02-25T10:00:00+00:00 | 2024-02-27T10:00:00+00:00 | MW | 276 | 26 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008867_001 | Dismissed | Planned | Production unavailability | 2024-02-22T12:47:06+00:00 | 2024-02-25T10:00:00+00:00 | 2024-02-27T12:47:00+00:00 | MW | 276 | 26 | 302 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008882_003 | Inactive | Planned | Production unavailability | 2024-02-27T01:02:32+00:00 | 2024-02-26T19:40:00+00:00 | 2024-02-27T00:01:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008883_003 | Inactive | Planned | Production unavailability | 2024-02-27T01:02:32+00:00 | 2024-02-26T19:41:00+00:00 | 2024-02-27T00:01:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008883_002 | Dismissed | Planned | Production unavailability | 2024-02-27T00:00:12+00:00 | 2024-02-26T19:41:00+00:00 | 2024-02-27T00:01:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008882_002 | Dismissed | Planned | Production unavailability | 2024-02-26T23:59:45+00:00 | 2024-02-26T19:40:00+00:00 | 2024-02-27T00:01:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008883_001 | Dismissed | Planned | Production unavailability | 2024-02-26T19:41:42+00:00 | 2024-02-26T19:41:00+00:00 | 2024-02-27T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008882_001 | Dismissed | Planned | Production unavailability | 2024-02-26T19:40:29+00:00 | 2024-02-26T19:40:00+00:00 | 2024-02-27T06:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008881_002 | Inactive | Planned | Production unavailability | 2024-02-26T16:32:32+00:00 | 2024-02-26T15:00:00+00:00 | 2024-02-26T15:30:00+00:00 | MW | 460 | 380 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008881_001 | Dismissed | Planned | Production unavailability | 2024-02-26T13:50:40+00:00 | 2024-02-26T15:00:00+00:00 | 2024-02-26T15:30:00+00:00 | MW | 460 | 380 | 840 | Foreseen Maintenance | Testing |
Fossil Gas | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008880_003 | Dismissed | Planned | Production unavailability | 2024-02-26T15:27:37+00:00 | 2024-02-26T09:40:00+00:00 | 2024-02-26T15:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008880_002 | Dismissed | Planned | Production unavailability | 2024-02-26T10:19:17+00:00 | 2024-02-26T09:40:00+00:00 | 2024-02-26T15:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |
VKNGW-2 | 48W00000VKNGW-22 | Viking Energy Wind Farm LLP |
48X000000000314Y | 0000000000000000000008880_001 | Dismissed | Planned | Production unavailability | 2024-02-26T09:38:02+00:00 | 2024-02-26T09:40:00+00:00 | 2024-02-26T10:00:00+00:00 | MW | 10 | 0 | 10 | Shutdown | Commissioning |
Wind Onshore | 10YGB----------A |