Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 168 169 170 171 172 >
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007333_004 Inactive Planned Production unavailability 2022-06-25T16:02:31+01:00 2022-06-25T14:00:00+01:00 2022-06-25T14:50:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007333_003 Dismissed Planned Production unavailability 2022-06-25T13:56:37+01:00 2022-06-25T14:00:00+01:00 2022-06-25T14:50:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007333_002 Dismissed Planned Production unavailability 2022-06-25T11:44:02+01:00 2022-06-25T15:00:00+01:00 2022-06-25T16:00:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007333_001 Dismissed Planned Production unavailability 2022-06-24T16:26:54+01:00 2022-06-25T15:00:00+01:00 2022-06-25T16:00:00+01:00 MW 131 762 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007332_005 Inactive Planned Production unavailability 2022-06-25T15:02:31+01:00 2022-06-25T13:20:00+01:00 2022-06-25T14:00:00+01:00 MW 362 531 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007332_004 Dismissed Planned Production unavailability 2022-06-25T13:31:56+01:00 2022-06-25T13:20:00+01:00 2022-06-25T14:00:00+01:00 MW 362 531 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007332_003 Dismissed Planned Production unavailability 2022-06-25T13:29:43+01:00 2022-06-25T13:20:00+01:00 2022-06-25T15:00:00+01:00 MW 362 531 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007332_002 Dismissed Planned Production unavailability 2022-06-25T11:43:32+01:00 2022-06-25T14:00:00+01:00 2022-06-25T15:00:00+01:00 MW 362 531 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007332_001 Dismissed Planned Production unavailability 2022-06-24T16:21:39+01:00 2022-06-25T14:00:00+01:00 2022-06-25T15:00:00+01:00 MW 210 683 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007262_002 Dismissed Planned Production unavailability 2022-06-25T14:33:35+01:00 2022-07-01T17:00:00+01:00 2022-07-02T08:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007262_001 Dismissed Planned Production unavailability 2022-06-13T13:59:02+01:00 2022-07-01T17:00:00+01:00 2022-07-02T08:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007261_002 Dismissed Planned Production unavailability 2022-06-25T14:33:24+01:00 2022-06-30T17:00:00+01:00 2022-07-01T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007261_001 Dismissed Planned Production unavailability 2022-06-13T13:57:23+01:00 2022-06-30T17:00:00+01:00 2022-07-01T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007260_003 Dismissed Planned Production unavailability 2022-06-25T14:30:14+01:00 2022-06-29T13:31:00+01:00 2022-06-30T07:30:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007260_002 Dismissed Planned Production unavailability 2022-06-13T14:42:58+01:00 2022-06-29T13:31:00+01:00 2022-06-30T07:30:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007260_001 Dismissed Planned Production unavailability 2022-06-13T13:55:42+01:00 2022-06-29T14:00:00+01:00 2022-06-30T07:30:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007265_002 Dismissed Planned Production unavailability 2022-06-25T14:12:27+01:00 2022-07-04T18:30:00+01:00 2022-07-05T08:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007265_001 Dismissed Planned Production unavailability 2022-06-13T14:24:08+01:00 2022-07-04T18:30:00+01:00 2022-07-05T08:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007329_008 Inactive Planned Production unavailability 2022-06-25T13:47:31+01:00 2022-06-25T11:40:00+01:00 2022-06-25T12:46:00+01:00 MW 507 386 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007329_007 Dismissed Planned Production unavailability 2022-06-25T12:37:35+01:00 2022-06-25T11:40:00+01:00 2022-06-25T12:46:00+01:00 MW 507 386 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007329_006 Dismissed Planned Production unavailability 2022-06-25T12:16:42+01:00 2022-06-25T11:40:00+01:00 2022-06-25T12:45:00+01:00 MW 507 386 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007329_005 Dismissed Planned Production unavailability 2022-06-25T11:40:58+01:00 2022-06-25T11:40:00+01:00 2022-06-25T13:00:00+01:00 MW 507 386 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007329_004 Dismissed Planned Production unavailability 2022-06-25T11:28:05+01:00 2022-06-25T11:40:00+01:00 2022-06-25T12:00:00+01:00 MW 434 459 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007329_003 Dismissed Planned Production unavailability 2022-06-25T11:07:29+01:00 2022-06-25T11:30:00+01:00 2022-06-25T12:00:00+01:00 MW 434 459 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007329_002 Dismissed Planned Production unavailability 2022-06-25T10:58:45+01:00 2022-06-25T11:10:00+01:00 2022-06-25T12:00:00+01:00 MW 434 459 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007329_001 Dismissed Planned Production unavailability 2022-06-24T11:41:10+01:00 2022-06-25T11:00:00+01:00 2022-06-25T12:00:00+01:00 MW 434 459 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007331_005 Dismissed Planned Production unavailability 2022-06-25T13:28:54+01:00 2022-06-25T12:46:00+01:00 2022-06-25T13:20:00+01:00 MW 434 459 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007331_004 Dismissed Planned Production unavailability 2022-06-25T12:31:20+01:00 2022-06-25T12:46:00+01:00 2022-06-25T14:00:00+01:00 MW 434 459 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007331_003 Dismissed Planned Production unavailability 2022-06-25T12:17:04+01:00 2022-06-25T12:45:00+01:00 2022-06-25T14:00:00+01:00 MW 434 459 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007331_002 Dismissed Planned Production unavailability 2022-06-25T11:43:12+01:00 2022-06-25T13:00:00+01:00 2022-06-25T14:00:00+01:00 MW 434 459 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007331_001 Dismissed Planned Production unavailability 2022-06-24T16:17:19+01:00 2022-06-25T13:00:00+01:00 2022-06-25T14:00:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007327_007 Inactive Planned Production unavailability 2022-06-25T12:47:31+01:00 2022-06-25T09:00:00+01:00 2022-06-25T11:40:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007327_006 Dismissed Planned Production unavailability 2022-06-25T11:27:54+01:00 2022-06-25T09:00:00+01:00 2022-06-25T11:40:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007327_005 Dismissed Planned Production unavailability 2022-06-25T11:07:05+01:00 2022-06-25T09:00:00+01:00 2022-06-25T11:30:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007327_004 Dismissed Planned Production unavailability 2022-06-25T10:58:24+01:00 2022-06-25T09:00:00+01:00 2022-06-25T11:10:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007327_003 Dismissed Planned Production unavailability 2022-06-25T10:52:17+01:00 2022-06-25T09:00:00+01:00 2022-06-25T11:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007327_002 Dismissed Planned Production unavailability 2022-06-25T09:45:41+01:00 2022-06-25T09:00:00+01:00 2022-06-25T10:30:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007327_001 Dismissed Planned Production unavailability 2022-06-24T11:33:19+01:00 2022-06-25T09:00:00+01:00 2022-06-25T10:00:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007330_002 Dismissed Planned Production unavailability 2022-06-25T11:42:50+01:00 2022-06-25T12:00:00+01:00 2022-06-25T13:00:00+01:00 MW 362 531 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007330_001 Dismissed Planned Production unavailability 2022-06-24T11:49:08+01:00 2022-06-25T12:00:00+01:00 2022-06-25T13:00:00+01:00 MW 362 531 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007328_002 Dismissed Planned Production unavailability 2022-06-25T10:52:39+01:00 2022-06-25T10:00:00+01:00 2022-06-25T11:00:00+01:00 MW 507 386 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007328_001 Dismissed Planned Production unavailability 2022-06-24T11:38:38+01:00 2022-06-25T10:00:00+01:00 2022-06-25T11:00:00+01:00 MW 507 386 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007223_004 Inactive Planned Production unavailability 2022-06-25T10:02:32+01:00 2022-06-24T19:00:00+01:00 2022-06-25T09:00:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007223_003 Dismissed Planned Production unavailability 2022-06-23T23:19:34+01:00 2022-06-24T19:00:00+01:00 2022-06-25T09:00:00+01:00 MW 283 610 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007223_002 Dismissed Planned Production unavailability 2022-06-13T13:40:59+01:00 2022-06-24T18:00:00+01:00 2022-06-25T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007223_001 Dismissed Planned Production unavailability 2022-06-09T09:18:15+01:00 2022-06-24T19:00:00+01:00 2022-06-25T09:00:00+01:00 MW 273 620 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007266_002 Dismissed Planned Production unavailability 2022-06-25T09:06:55+01:00 2022-07-05T17:00:00+01:00 2022-07-10T23:59:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007266_001 Dismissed Planned Production unavailability 2022-06-13T14:25:43+01:00 2022-07-05T17:00:00+01:00 2022-07-10T23:59:00+01:00 MW 893 0 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007326_003 Inactive Planned Production unavailability 2022-06-24T20:02:33+01:00 2022-06-24T18:30:00+01:00 2022-06-24T18:58:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007326_002 Dismissed Planned Production unavailability 2022-06-24T10:27:51+01:00 2022-06-24T18:30:00+01:00 2022-06-24T18:58:00+01:00 MW 546 347 893 Foreseen Maintenance
Commissioning
Fossil Gas 10YGB----------A