Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 150 151 152 153 154 > | ||||||||||||||||||
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000003593_005 | Dismissed | Planned | Production unavailability | 2018-10-26T09:01:14+01:00 | 2022-09-05T08:00:00+01:00 | 2022-09-25T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000003593_004 | Dismissed | Planned | Production unavailability | 2018-10-05T07:46:17+01:00 | 2022-09-05T08:00:00+01:00 | 2022-09-25T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000003593_003 | Dismissed | Planned | Production unavailability | 2018-07-16T14:22:18+01:00 | 2022-09-05T08:00:00+01:00 | 2022-09-25T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000003593_002 | Dismissed | Planned | Production unavailability | 2018-03-02T12:09:30+00:00 | 2022-09-05T08:00:00+01:00 | 2022-09-25T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000003593_001 | Dismissed | Planned | Production unavailability | 2018-01-09T14:21:00+00:00 | 2022-09-05T08:00:00+01:00 | 2022-09-25T16:00:00+01:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Maintenance |
Hydro Pumped Storage | 10YGB----------A |
TB3 | 47W0000000000994 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006894_005 | Inactive | Planned | Production unavailability | 2022-09-02T15:01:55+01:00 | 2022-07-16T09:00:00+01:00 | 2022-09-02T14:00:00+01:00 | MW | 241 | 0 | 241 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB3 | 47W0000000000994 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006894_004 | Dismissed | Planned | Production unavailability | 2022-08-31T16:02:39+01:00 | 2022-07-16T09:00:00+01:00 | 2022-09-02T14:00:00+01:00 | MW | 241 | 0 | 241 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB3 | 47W0000000000994 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006894_003 | Dismissed | Planned | Production unavailability | 2022-08-05T15:14:33+01:00 | 2022-07-16T09:00:00+01:00 | 2022-09-03T17:00:00+01:00 | MW | 241 | 0 | 241 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB3 | 47W0000000000994 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006894_002 | Dismissed | Planned | Production unavailability | 2022-05-10T15:38:50+01:00 | 2022-07-16T09:00:00+01:00 | 2022-09-03T17:00:00+01:00 | MW | 241 | 0 | 241 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
TB3 | 47W0000000000994 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000006894_001 | Dismissed | Planned | Production unavailability | 2022-04-11T15:35:32+01:00 | 2022-05-28T08:00:00+01:00 | 2022-07-10T17:00:00+01:00 | MW | 241 | 0 | 241 | Foreseen Maintenance | Planned Outage |
Fossil Oil | 10Y1001A1001A59C |
T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000007550_005 | Inactive | Planned | Production unavailability | 2022-09-01T12:46:55+01:00 | 2022-09-01T08:30:00+01:00 | 2022-09-01T11:45:00+01:00 | MW | 120 | 0 | 120 | Shutdown | Grid |
Wind Onshore | 10YGB----------A |
T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000007550_004 | Dismissed | Planned | Production unavailability | 2022-09-01T11:25:47+01:00 | 2022-09-01T08:30:00+01:00 | 2022-09-01T11:45:00+01:00 | MW | 120 | 0 | 120 | Shutdown | Grid |
Wind Onshore | 10YGB----------A |
T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000007550_003 | Dismissed | Planned | Production unavailability | 2022-09-01T10:54:41+01:00 | 2022-09-01T08:30:00+01:00 | 2022-09-01T11:30:00+01:00 | MW | 120 | 0 | 120 | Shutdown | Grid |
Wind Onshore | 10YGB----------A |
T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000007550_002 | Dismissed | Planned | Production unavailability | 2022-09-01T08:21:47+01:00 | 2022-09-01T08:30:00+01:00 | 2022-09-01T11:00:00+01:00 | MW | 120 | 0 | 120 | Shutdown | Grid |
Wind Onshore | 10YGB----------A |
T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000007550_001 | Dismissed | Planned | Production unavailability | 2022-09-01T00:49:24+01:00 | 2022-09-01T09:00:00+01:00 | 2022-09-01T11:00:00+01:00 | MW | 120 | 0 | 120 | Shutdown | Grid |
Wind Onshore | 10YGB----------A |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007549_003 | Inactive | Planned | Production unavailability | 2022-09-01T04:01:53+01:00 | 2022-08-31T22:30:00+01:00 | 2022-09-01T03:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007549_002 | Dismissed | Planned | Production unavailability | 2022-08-31T22:24:08+01:00 | 2022-08-31T22:30:00+01:00 | 2022-09-01T03:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007549_001 | Dismissed | Planned | Production unavailability | 2022-08-31T16:59:45+01:00 | 2022-08-31T23:00:00+01:00 | 2022-09-01T03:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007547_004 | Inactive | Planned | Production unavailability | 2022-08-31T23:31:53+01:00 | 2022-08-30T20:31:00+01:00 | 2022-08-31T22:29:00+01:00 | MW | 114 | 350 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007547_003 | Dismissed | Planned | Production unavailability | 2022-08-31T22:23:06+01:00 | 2022-08-30T20:31:00+01:00 | 2022-08-31T22:29:00+01:00 | MW | 114 | 350 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007547_002 | Dismissed | Planned | Production unavailability | 2022-08-31T16:50:46+01:00 | 2022-08-30T20:31:00+01:00 | 2022-08-31T22:59:00+01:00 | MW | 114 | 350 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007547_001 | Dismissed | Planned | Production unavailability | 2022-08-30T19:46:31+01:00 | 2022-08-30T20:31:00+01:00 | 2022-09-01T00:00:00+01:00 | MW | 114 | 350 | 464 | Failure | Plant Fault - HRSG |
Fossil Gas | 10Y1001A1001A59C |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000007541_004 | Inactive | Planned | Production unavailability | 2022-08-31T23:01:54+01:00 | 2022-08-31T08:00:00+01:00 | 2022-08-31T22:00:00+01:00 | MW | 108 | 0 | 108 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000007541_003 | Dismissed | Planned | Production unavailability | 2022-08-31T20:43:04+01:00 | 2022-08-31T08:00:00+01:00 | 2022-08-31T22:00:00+01:00 | MW | 108 | 0 | 108 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000007541_002 | Dismissed | Planned | Production unavailability | 2022-08-31T18:42:31+01:00 | 2022-08-31T08:00:00+01:00 | 2022-08-31T21:00:00+01:00 | MW | 108 | 0 | 108 | Failure | Grid |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000007541_001 | Dismissed | Planned | Production unavailability | 2022-08-26T16:00:08+01:00 | 2022-08-31T08:00:00+01:00 | 2022-08-31T19:00:00+01:00 | MW | 108 | 0 | 108 | Failure | Grid |
Wind Onshore | 10YGB----------A |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007546_002 | Inactive | Unplanned | Production unavailability | 2022-08-30T21:31:55+01:00 | 2022-08-30T18:47:00+01:00 | 2022-08-30T20:30:00+01:00 | MW | 84 | 380 | 464 | Failure | Plant Fault - Boiler |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007546_001 | Dismissed | Unplanned | Production unavailability | 2022-08-30T18:52:20+01:00 | 2022-08-30T18:47:00+01:00 | 2022-08-30T20:30:00+01:00 | MW | 84 | 380 | 464 | Failure | Plant Fault - Boiler |
Fossil Gas | 10Y1001A1001A59C |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000007545_001 | Active | Planned | Production unavailability | 2022-08-30T12:20:36+01:00 | 2026-09-11T23:00:00+01:00 | 2026-09-25T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000006757_004 | Dismissed | Planned | Production unavailability | 2022-08-30T10:22:19+01:00 | 2026-09-11T23:00:00+01:00 | 2026-09-25T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000006757_003 | Dismissed | Planned | Production unavailability | 2022-08-05T15:14:33+01:00 | 2026-09-11T23:00:00+01:00 | 2026-09-25T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000006757_002 | Dismissed | Planned | Production unavailability | 2022-03-23T10:54:49+00:00 | 2026-09-11T23:00:00+01:00 | 2026-09-25T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000006757_001 | Dismissed | Planned | Production unavailability | 2022-02-08T14:26:59+00:00 | 2026-09-11T23:00:00+01:00 | 2026-09-25T23:00:00+01:00 | MW | 1180 | 0 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007543_002 | Inactive | Planned | Production unavailability | 2022-08-29T14:01:54+01:00 | 2022-08-29T09:00:00+01:00 | 2022-08-29T13:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Testing |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007543_001 | Dismissed | Planned | Production unavailability | 2022-08-28T10:21:55+01:00 | 2022-08-29T09:00:00+01:00 | 2022-08-29T13:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Testing |
Fossil Gas | 10Y1001A1001A59C |
T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000007226_003 | Inactive | Planned | Production unavailability | 2022-08-29T11:01:54+01:00 | 2022-08-29T09:00:00+01:00 | 2022-08-29T10:00:00+01:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000007226_002 | Dismissed | Planned | Production unavailability | 2022-08-05T15:14:33+01:00 | 2022-08-29T09:00:00+01:00 | 2022-08-29T10:00:00+01:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_HADHW-1 | 48W00000HADHW-1J | SSE GENERATION |
48X000000000077M | 0000000000000000000007226_001 | Dismissed | Planned | Production unavailability | 2022-06-09T12:38:41+01:00 | 2022-08-29T09:00:00+01:00 | 2022-08-29T10:00:00+01:00 | MW | 120 | 0 | 120 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007542_003 | Inactive | Planned | Production unavailability | 2022-08-29T00:01:53+01:00 | 2022-08-28T08:00:00+01:00 | 2022-08-28T23:00:00+01:00 | MW | 0 | 464 | 464 | Foreseen Maintenance | Testing |
Fossil Oil | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007542_002 | Dismissed | Planned | Production unavailability | 2022-08-28T17:45:08+01:00 | 2022-08-28T08:00:00+01:00 | 2022-08-28T23:00:00+01:00 | MW | 0 | 464 | 464 | Foreseen Maintenance | Testing |
Fossil Oil | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007542_001 | Dismissed | Planned | Production unavailability | 2022-08-27T10:13:12+01:00 | 2022-08-28T08:00:00+01:00 | 2022-08-28T21:30:00+01:00 | MW | 0 | 464 | 464 | Foreseen Maintenance | Testing |
Fossil Oil | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007536_003 | Inactive | Planned | Production unavailability | 2022-08-27T23:31:53+01:00 | 2022-08-27T00:00:00+01:00 | 2022-08-27T22:30:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Testing |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007536_002 | Dismissed | Planned | Production unavailability | 2022-08-27T20:24:59+01:00 | 2022-08-27T00:00:00+01:00 | 2022-08-27T22:30:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Testing |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000007536_001 | Dismissed | Planned | Production unavailability | 2022-08-24T14:29:14+01:00 | 2022-08-27T00:00:00+01:00 | 2022-08-27T21:00:00+01:00 | MW | 464 | 0 | 464 | Foreseen Maintenance | Testing |
Fossil Gas | 10Y1001A1001A59C |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007480_007 | Inactive | Planned | Production unavailability | 2022-08-27T13:01:54+01:00 | 2022-08-23T21:00:00+01:00 | 2022-08-27T11:59:00+01:00 | MW | 298 | 60 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007480_006 | Dismissed | Planned | Production unavailability | 2022-08-21T11:19:00+01:00 | 2022-08-23T21:00:00+01:00 | 2022-08-27T11:59:00+01:00 | MW | 298 | 60 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007480_005 | Dismissed | Planned | Production unavailability | 2022-08-20T18:31:06+01:00 | 2022-08-22T21:00:00+01:00 | 2022-08-27T11:59:00+01:00 | MW | 298 | 60 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007480_004 | Dismissed | Planned | Production unavailability | 2022-08-20T11:35:46+01:00 | 2022-08-22T12:00:00+01:00 | 2022-08-27T11:59:00+01:00 | MW | 298 | 60 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007480_003 | Dismissed | Planned | Production unavailability | 2022-08-17T10:35:52+01:00 | 2022-08-21T12:00:00+01:00 | 2022-08-27T11:59:00+01:00 | MW | 298 | 60 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007480_002 | Dismissed | Planned | Production unavailability | 2022-08-12T15:18:42+01:00 | 2022-08-19T12:00:00+01:00 | 2022-08-25T11:59:00+01:00 | MW | 298 | 60 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |