This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2024-09-27T20:00:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 146 147 148 149 150 >
T_STLGW-1 48W00000STLGW-1E
SSE GENERATION
48X000000000077M 0000000000000000000007588_006 Dismissed Planned Production unavailability 2022-09-14T16:55:33+01:00 2022-09-14T10:00:00+01:00 2022-09-16T17:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003594_006 Dismissed Planned Production unavailability 2019-01-25T14:03:35+00:00 2022-09-19T08:00:00+01:00 2022-10-09T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003594_005 Dismissed Planned Production unavailability 2018-10-26T09:01:14+01:00 2022-09-19T08:00:00+01:00 2022-10-09T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006068_005 Inactive Planned Consumption unavailability 2022-09-16T18:02:32+01:00 2022-08-26T08:00:00+01:00 2022-09-16T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
SSE GENERATION
48X000000000077M 0000000000000000000007588_005 Dismissed Planned Production unavailability 2022-09-14T12:43:33+01:00 2022-09-14T10:00:00+01:00 2022-09-14T17:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
SSE GENERATION
48X000000000077M 0000000000000000000007588_004 Dismissed Planned Production unavailability 2022-09-14T12:00:45+01:00 2022-09-14T10:00:00+01:00 2022-09-14T13:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006068_004 Dismissed Planned Consumption unavailability 2022-04-21T09:59:05+01:00 2022-08-26T08:00:00+01:00 2022-09-16T17:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003594_004 Dismissed Planned Production unavailability 2018-10-05T07:46:17+01:00 2022-09-19T08:00:00+01:00 2022-10-09T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003594_003 Dismissed Planned Production unavailability 2018-07-16T14:22:18+01:00 2022-09-19T08:00:00+01:00 2022-10-09T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006068_003 Dismissed Planned Consumption unavailability 2022-03-23T10:54:24+00:00 2022-07-18T08:00:00+01:00 2022-08-05T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
SSE GENERATION
48X000000000077M 0000000000000000000007588_003 Dismissed Planned Production unavailability 2022-09-13T17:40:41+01:00 2022-09-14T10:00:00+01:00 2022-09-14T12:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
SSE GENERATION
48X000000000077M 0000000000000000000007588_002 Dismissed Planned Production unavailability 2022-09-13T17:05:33+01:00 2022-09-14T12:00:00+01:00 2022-09-14T14:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006068_002 Dismissed Planned Consumption unavailability 2021-10-07T15:00:35+01:00 2022-07-18T08:00:00+01:00 2022-08-05T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003594_002 Dismissed Planned Production unavailability 2018-03-02T12:09:30+00:00 2022-09-19T08:00:00+01:00 2022-10-09T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000003594_001 Dismissed Planned Production unavailability 2018-01-09T14:22:07+00:00 2022-09-19T08:00:00+01:00 2022-10-09T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000006068_001 Dismissed Planned Production unavailability 2021-05-24T19:30:17+01:00 2022-07-18T08:00:00+01:00 2022-07-22T16:00:00+01:00 MW 150 0 150 Foreseen Maintenance
Maintenance
Hydro Pumped Storage 10YGB----------A
T_STLGW-1 48W00000STLGW-1E
SSE GENERATION
48X000000000077M 0000000000000000000007588_001 Dismissed Planned Production unavailability 2022-09-12T11:48:47+01:00 2022-09-14T10:00:00+01:00 2022-09-14T12:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Planned Outage
Wind Onshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007605_003 Inactive Unplanned Production unavailability 2022-09-16T17:17:32+01:00 2022-09-16T15:50:00+01:00 2022-09-16T16:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Plant Fault - Turbine
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007605_002 Dismissed Unplanned Production unavailability 2022-09-16T16:13:23+01:00 2022-09-16T15:50:00+01:00 2022-09-16T16:15:00+01:00 MW 150 0 150 Foreseen Maintenance
Plant Fault - Turbine
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000007605_001 Dismissed Unplanned Production unavailability 2022-09-16T15:53:41+01:00 2022-09-16T15:50:00+01:00 2022-09-16T18:30:00+01:00 MW 150 0 150 Foreseen Maintenance
Plant Fault - Turbine
Hydro Pumped Storage 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007602_002 Dismissed Planned Production unavailability 2022-09-16T15:28:58+01:00 2023-01-01T00:00:00+00:00 2023-01-01T23:59:00+00:00 MW 755 0 755 Foreseen Maintenance
Testing
Fossil Gas 10YGB----------A
T_KEAD-1 48W000000KEAD-15
KEADBY GEN. LTD
48X000000000073U 0000000000000000000007602_001 Dismissed Planned Production unavailability 2022-09-16T12:18:32+01:00 2023-01-01T00:00:00+00:00 2023-01-01T23:59:00+00:00 MW 755 0 755 Foreseen Maintenance
Testing
Fossil Gas 10YGB----------A
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007594_004 Inactive Planned Production unavailability 2022-09-16T13:01:53+01:00 2022-09-15T21:00:00+01:00 2022-09-16T07:00:00+01:00 MW 254 210 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007594_003 Dismissed Planned Production unavailability 2022-09-15T19:24:40+01:00 2022-09-15T21:00:00+01:00 2022-09-16T07:00:00+01:00 MW 254 210 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007593_003 Inactive Planned Production unavailability 2022-09-16T13:01:53+01:00 2022-09-14T21:00:00+01:00 2022-09-15T07:00:00+01:00 MW 254 210 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007599_003 Inactive Unplanned Production unavailability 2022-09-16T13:01:53+01:00 2022-09-15T05:15:00+01:00 2022-09-15T23:59:00+01:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007599_002 Dismissed Unplanned Production unavailability 2022-09-15T19:25:14+01:00 2022-09-15T05:15:00+01:00 2022-09-15T23:59:00+01:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007593_002 Dismissed Planned Production unavailability 2022-09-13T12:32:46+01:00 2022-09-14T21:00:00+01:00 2022-09-15T07:00:00+01:00 MW 254 210 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007594_002 Dismissed Planned Production unavailability 2022-09-15T10:42:26+01:00 2022-09-15T21:00:00+01:00 2022-09-16T07:00:00+01:00 MW 94 370 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007594_001 Dismissed Planned Production unavailability 2022-09-13T09:51:06+01:00 2022-09-15T21:00:00+01:00 2022-09-16T07:00:00+01:00 MW 254 210 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007593_001 Dismissed Planned Production unavailability 2022-09-13T09:47:28+01:00 2022-09-14T21:00:00+01:00 2022-09-15T07:00:00+01:00 MW 254 210 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
TB3 47W0000000000994
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007599_001 Dismissed Unplanned Production unavailability 2022-09-15T05:43:23+01:00 2022-09-15T05:15:00+01:00 2022-09-16T00:30:00+01:00 MW 241 0 241 Failure
Plant Fault - Boiler
Fossil Oil 10Y1001A1001A59C
T_STLGW-2 48W00000STLGW-2C
SSE GENERATION
48X000000000077M 0000000000000000000007591_004 Inactive Planned Production unavailability 2022-09-14T14:01:54+01:00 2022-09-14T10:00:00+01:00 2022-09-14T13:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
SSE GENERATION
48X000000000077M 0000000000000000000007597_004 Inactive Planned Production unavailability 2022-09-14T14:01:54+01:00 2022-09-14T10:00:00+01:00 2022-09-14T13:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
SSE GENERATION
48X000000000077M 0000000000000000000007597_003 Dismissed Planned Production unavailability 2022-09-14T12:01:05+01:00 2022-09-14T10:00:00+01:00 2022-09-14T13:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-2 48W00000STLGW-2C
SSE GENERATION
48X000000000077M 0000000000000000000007591_003 Dismissed Planned Production unavailability 2022-09-14T12:01:22+01:00 2022-09-14T10:00:00+01:00 2022-09-14T13:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-2 48W00000STLGW-2C
SSE GENERATION
48X000000000077M 0000000000000000000007591_002 Dismissed Planned Production unavailability 2022-09-13T17:40:20+01:00 2022-09-14T10:00:00+01:00 2022-09-14T12:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
SSE GENERATION
48X000000000077M 0000000000000000000007597_002 Dismissed Planned Production unavailability 2022-09-13T17:41:03+01:00 2022-09-14T10:00:00+01:00 2022-09-14T12:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-3 48W00000STLGW-3A
SSE GENERATION
48X000000000077M 0000000000000000000007597_001 Dismissed Planned Production unavailability 2022-09-13T17:07:31+01:00 2022-09-14T12:00:00+01:00 2022-09-14T14:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
T_STLGW-2 48W00000STLGW-2C
SSE GENERATION
48X000000000077M 0000000000000000000007591_001 Dismissed Planned Production unavailability 2022-09-13T09:06:23+01:00 2022-09-14T12:00:00+01:00 2022-09-14T14:00:00+01:00 MW 108 0 108 Foreseen Maintenance
Grid
Wind Onshore 10YGB----------A
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007592_003 Inactive Planned Production unavailability 2022-09-14T05:01:54+01:00 2022-09-13T21:00:00+01:00 2022-09-14T03:55:00+01:00 MW 254 210 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007592_002 Dismissed Planned Production unavailability 2022-09-14T03:50:30+01:00 2022-09-13T21:00:00+01:00 2022-09-14T03:55:00+01:00 MW 254 210 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
Great Island 47W0000000001024
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000007592_001 Dismissed Planned Production unavailability 2022-09-13T09:45:03+01:00 2022-09-13T21:00:00+01:00 2022-09-14T07:00:00+01:00 MW 254 210 464 Foreseen Maintenance
Testing
Fossil Gas 10Y1001A1001A59C
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007481_005 Inactive Planned Production unavailability 2022-09-13T13:01:54+01:00 2022-08-27T12:00:00+01:00 2022-09-13T11:59:00+01:00 MW 198 160 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007481_004 Dismissed Planned Production unavailability 2022-08-17T10:34:54+01:00 2022-08-27T12:00:00+01:00 2022-09-13T11:59:00+01:00 MW 198 160 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007481_003 Dismissed Planned Production unavailability 2022-08-12T15:17:31+01:00 2022-08-25T12:00:00+01:00 2022-09-12T11:59:00+01:00 MW 198 160 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007481_002 Dismissed Planned Production unavailability 2022-08-05T17:50:49+01:00 2022-08-21T12:00:00+01:00 2022-09-10T11:59:00+01:00 MW 198 160 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_SGRWO-6 48W00000SGRWO-6B
Seagreen Wind Energy Ltd
48X000000000263P 0000000000000000000007481_001 Dismissed Planned Production unavailability 2022-08-05T17:14:00+01:00 2022-08-21T12:00:00+01:00 2022-08-28T11:59:00+01:00 MW 198 160 358 Foreseen Maintenance
Commissioning
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
SSE_GROUP
48X0000000000319 0000000000000000000007554_002 Dismissed Planned Production unavailability 2022-09-13T10:44:04+01:00 2022-09-20T08:00:00+01:00 2022-09-30T18:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
SSE_GROUP
48X0000000000319 0000000000000000000007554_001 Dismissed Planned Production unavailability 2022-09-02T10:05:04+01:00 2022-09-20T08:00:00+01:00 2022-09-30T18:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A