Last update at: 2024-09-25T18:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 116 117 118 119 120 > | ||||||||||||||||||
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000007958_001 | Dismissed | Planned | Production unavailability | 2023-02-15T17:13:56+00:00 | 2023-03-05T23:59:00+00:00 | 2023-03-06T23:59:00+00:00 | MW | 893 | 0 | 893 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008015_003 | Inactive | Planned | Production unavailability | 2023-03-03T17:02:31+00:00 | 2023-03-03T14:27:00+00:00 | 2023-03-03T16:00:00+00:00 | MW | 533 | 360 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008015_002 | Dismissed | Planned | Production unavailability | 2023-03-03T12:23:31+00:00 | 2023-03-03T14:27:00+00:00 | 2023-03-03T16:00:00+00:00 | MW | 533 | 360 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008015_001 | Dismissed | Planned | Production unavailability | 2023-03-02T19:49:17+00:00 | 2023-03-03T13:00:00+00:00 | 2023-03-03T16:00:00+00:00 | MW | 533 | 360 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008014_003 | Inactive | Planned | Production unavailability | 2023-03-03T15:32:31+00:00 | 2023-03-03T09:00:00+00:00 | 2023-03-03T14:27:00+00:00 | MW | 586 | 307 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008014_002 | Dismissed | Planned | Production unavailability | 2023-03-03T12:25:13+00:00 | 2023-03-03T09:00:00+00:00 | 2023-03-03T14:27:00+00:00 | MW | 586 | 307 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008014_001 | Dismissed | Planned | Production unavailability | 2023-03-02T19:48:02+00:00 | 2023-03-03T09:00:00+00:00 | 2023-03-03T13:00:00+00:00 | MW | 586 | 307 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007704_008 | Dismissed | Planned | Production unavailability | 2023-03-03T14:12:40+00:00 | 2023-03-05T06:00:00+00:00 | 2023-03-06T11:59:00+00:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007704_007 | Dismissed | Planned | Production unavailability | 2023-03-03T07:49:58+00:00 | 2023-03-05T06:00:00+00:00 | 2023-03-06T11:59:00+00:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007704_006 | Dismissed | Planned | Production unavailability | 2023-02-24T17:35:59+00:00 | 2023-03-05T06:00:00+00:00 | 2023-03-06T11:59:00+00:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007704_005 | Dismissed | Planned | Production unavailability | 2023-01-13T06:12:44+00:00 | 2023-03-10T06:00:00+00:00 | 2023-04-05T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007704_004 | Dismissed | Planned | Production unavailability | 2023-01-12T11:46:15+00:00 | 2023-03-10T06:00:00+00:00 | 2023-04-05T23:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007704_003 | Dismissed | Planned | Production unavailability | 2022-12-21T13:15:24+00:00 | 2023-02-15T06:00:00+00:00 | 2023-04-15T05:59:00+01:00 | MW | 220 | 80 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007704_002 | Dismissed | Planned | Production unavailability | 2022-12-19T16:19:00+00:00 | 2023-01-05T06:00:00+00:00 | 2023-04-13T05:59:00+01:00 | MW | 210 | 90 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007704_001 | Dismissed | Planned | Production unavailability | 2022-11-04T13:35:19+00:00 | 2022-12-20T06:00:00+00:00 | 2023-04-09T05:59:00+01:00 | MW | 200 | 100 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_014 | Inactive | Planned | Production unavailability | 2023-03-03T13:02:31+00:00 | 2023-02-09T06:00:00+00:00 | 2023-03-03T11:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_013 | Dismissed | Planned | Production unavailability | 2023-02-28T11:30:14+00:00 | 2023-02-09T06:00:00+00:00 | 2023-03-03T11:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_012 | Dismissed | Planned | Production unavailability | 2023-02-24T18:19:10+00:00 | 2023-02-09T06:00:00+00:00 | 2023-03-01T11:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_011 | Dismissed | Planned | Production unavailability | 2023-02-23T18:16:29+00:00 | 2023-02-09T06:00:00+00:00 | 2023-02-27T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_010 | Dismissed | Planned | Production unavailability | 2023-02-21T16:16:46+00:00 | 2023-02-09T06:00:00+00:00 | 2023-02-24T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_009 | Dismissed | Planned | Production unavailability | 2023-02-18T04:02:49+00:00 | 2023-02-09T06:00:00+00:00 | 2023-02-22T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_008 | Dismissed | Planned | Production unavailability | 2023-02-17T00:30:25+00:00 | 2023-02-09T06:00:00+00:00 | 2023-02-19T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_007 | Dismissed | Planned | Production unavailability | 2023-02-02T14:44:46+00:00 | 2023-02-09T06:00:00+00:00 | 2023-02-17T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_006 | Dismissed | Planned | Production unavailability | 2023-01-30T12:26:02+00:00 | 2023-02-06T06:00:00+00:00 | 2023-02-17T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_005 | Dismissed | Planned | Production unavailability | 2023-01-29T11:05:12+00:00 | 2023-02-01T06:00:00+00:00 | 2023-02-17T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_004 | Dismissed | Planned | Production unavailability | 2023-01-12T11:53:47+00:00 | 2023-01-23T06:00:00+00:00 | 2023-02-17T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_003 | Dismissed | Planned | Production unavailability | 2022-12-19T15:35:14+00:00 | 2023-01-20T06:00:00+00:00 | 2023-06-13T05:59:00+01:00 | MW | 60 | 80 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_002 | Dismissed | Planned | Production unavailability | 2022-11-29T14:33:20+00:00 | 2022-12-20T06:00:00+00:00 | 2022-12-31T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007702_001 | Dismissed | Planned | Production unavailability | 2022-11-04T13:26:04+00:00 | 2022-11-08T06:00:00+00:00 | 2022-11-30T05:59:00+00:00 | MW | 130 | 10 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008013_002 | Inactive | Planned | Production unavailability | 2023-03-03T10:02:31+00:00 | 2023-03-03T06:00:00+00:00 | 2023-03-03T09:00:00+00:00 | MW | 533 | 360 | 893 | Shutdown | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008013_001 | Dismissed | Planned | Production unavailability | 2023-03-02T19:46:29+00:00 | 2023-03-03T06:00:00+00:00 | 2023-03-03T09:00:00+00:00 | MW | 533 | 360 | 893 | Shutdown | Commissioning |
Fossil Gas | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008011_002 | Inactive | Planned | Production unavailability | 2023-03-02T18:32:31+00:00 | 2023-03-02T16:30:00+00:00 | 2023-03-02T17:30:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008012_002 | Inactive | Planned | Consumption unavailability | 2023-03-02T18:32:31+00:00 | 2023-03-02T16:30:00+00:00 | 2023-03-02T17:30:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008012_001 | Dismissed | Planned | Consumption unavailability | 2023-03-02T16:21:17+00:00 | 2023-03-02T16:30:00+00:00 | 2023-03-02T17:30:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008011_001 | Dismissed | Planned | Production unavailability | 2023-03-02T16:19:42+00:00 | 2023-03-02T16:30:00+00:00 | 2023-03-02T17:30:00+00:00 | MW | 150 | 0 | 150 | Foreseen Maintenance | Planned Operational Activities |
Hydro Pumped Storage | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008010_005 | Inactive | Planned | Production unavailability | 2023-03-01T20:17:31+00:00 | 2023-03-01T13:00:00+00:00 | 2023-03-01T19:05:00+00:00 | MW | 522 | 371 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008010_004 | Dismissed | Planned | Production unavailability | 2023-03-01T16:21:11+00:00 | 2023-03-01T13:00:00+00:00 | 2023-03-01T19:05:00+00:00 | MW | 522 | 371 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008010_003 | Dismissed | Planned | Production unavailability | 2023-03-01T13:59:20+00:00 | 2023-03-01T13:00:00+00:00 | 2023-03-01T19:05:00+00:00 | MW | 528 | 365 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008010_002 | Dismissed | Planned | Production unavailability | 2023-03-01T12:39:01+00:00 | 2023-03-01T13:00:00+00:00 | 2023-03-01T19:05:00+00:00 | MW | 546 | 347 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008010_001 | Dismissed | Planned | Production unavailability | 2023-02-28T12:22:47+00:00 | 2023-03-01T13:00:00+00:00 | 2023-03-01T18:00:00+00:00 | MW | 546 | 347 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008009_002 | Inactive | Planned | Production unavailability | 2023-03-01T14:02:32+00:00 | 2023-03-01T09:00:00+00:00 | 2023-03-01T13:00:00+00:00 | MW | 233 | 660 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008009_001 | Dismissed | Planned | Production unavailability | 2023-02-28T12:21:15+00:00 | 2023-03-01T09:00:00+00:00 | 2023-03-01T13:00:00+00:00 | MW | 233 | 660 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008006_002 | Dismissed | Planned | Production unavailability | 2023-03-01T08:53:57+00:00 | 2023-03-02T12:30:00+00:00 | 2023-03-02T17:30:00+00:00 | MW | 546 | 347 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008006_001 | Dismissed | Planned | Production unavailability | 2023-02-27T09:27:34+00:00 | 2023-03-02T12:30:00+00:00 | 2023-03-02T17:30:00+00:00 | MW | 546 | 347 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008005_003 | Dismissed | Planned | Production unavailability | 2023-03-01T08:51:52+00:00 | 2023-03-02T09:00:00+00:00 | 2023-03-02T12:30:00+00:00 | MW | 408 | 485 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008005_002 | Dismissed | Planned | Production unavailability | 2023-02-27T09:28:30+00:00 | 2023-03-02T09:00:00+00:00 | 2023-03-02T12:30:00+00:00 | MW | 408 | 485 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008005_001 | Dismissed | Planned | Production unavailability | 2023-02-27T09:25:15+00:00 | 2023-03-02T09:00:00+00:00 | 2023-03-02T12:30:00+00:00 | MW | 546 | 347 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008004_004 | Inactive | Planned | Production unavailability | 2023-02-28T18:32:32+00:00 | 2023-02-28T13:30:00+00:00 | 2023-02-28T17:30:00+00:00 | MW | 363 | 530 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008004_003 | Dismissed | Planned | Production unavailability | 2023-02-28T12:03:05+00:00 | 2023-02-28T13:30:00+00:00 | 2023-02-28T17:30:00+00:00 | MW | 363 | 530 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008004_002 | Dismissed | Planned | Production unavailability | 2023-02-27T20:12:08+00:00 | 2023-02-28T13:00:00+00:00 | 2023-02-28T17:30:00+00:00 | MW | 363 | 530 | 893 | Foreseen Maintenance | Commissioning |
Fossil Gas | 10YGB----------A |