Last update at: 2024-09-25T13:30:00+01:00
**Please note that the last update time shown is rounded to the next market interval of 30 minutes
All times are in UTC.
Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 112 113 114 115 116 > | ||||||||||||||||||
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_004 | Dismissed | Planned | Production unavailability | 2023-03-28T14:22:40+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T13:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_003 | Dismissed | Planned | Production unavailability | 2023-03-28T14:16:20+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T14:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_003 | Dismissed | Planned | Production unavailability | 2023-03-28T11:54:03+01:00 | 2023-03-21T09:00:00+00:00 | 2023-03-31T11:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_003 | Dismissed | Planned | Production unavailability | 2023-03-28T14:14:57+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T14:00:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:31:41+01:00 | 2023-03-21T10:01:00+00:00 | 2023-03-31T11:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_002 | Dismissed | Planned | Production unavailability | 2023-03-20T15:22:24+00:00 | 2023-03-21T09:00:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_002 | Dismissed | Planned | Production unavailability | 2023-03-28T09:21:53+01:00 | 2023-03-25T23:59:00+00:00 | 2023-03-31T11:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008025_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:36:25+00:00 | 2023-03-25T23:59:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008027_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:42:21+00:00 | 2023-03-21T10:01:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 80 | 80 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008029_001 | Dismissed | Planned | Production unavailability | 2023-03-17T20:49:30+00:00 | 2023-03-21T10:01:00+00:00 | 2023-04-02T11:59:00+01:00 | MW | 358 | 0 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_GRIFW-1 | 48W10000GRIFW-1N | Griffin Wind Farm Limited |
48X000000000072W | 0000000000000000000008055_003 | Inactive | Unplanned | Production unavailability | 2023-03-30T13:02:31+01:00 | 2023-03-30T09:54:00+01:00 | 2023-03-30T12:00:00+01:00 | MW | 102 | 0 | 102 | Shutdown | Outage Overrun |
Wind Onshore | 10YGB----------A |
T_GRIFW-1 | 48W10000GRIFW-1N | Griffin Wind Farm Limited |
48X000000000072W | 0000000000000000000008055_002 | Dismissed | Unplanned | Production unavailability | 2023-03-30T10:47:03+01:00 | 2023-03-30T09:54:00+01:00 | 2023-03-30T12:00:00+01:00 | MW | 102 | 0 | 102 | Shutdown | Outage Overrun |
Wind Onshore | 10YGB----------A |
T_GRIFW-1 | 48W10000GRIFW-1N | Griffin Wind Farm Limited |
48X000000000072W | 0000000000000000000008055_001 | Dismissed | Unplanned | Production unavailability | 2023-03-30T09:55:52+01:00 | 2023-03-30T09:54:00+01:00 | 2023-03-30T11:00:00+01:00 | MW | 102 | 0 | 102 | Shutdown | Outage Overrun |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000008053_003 | Inactive | Planned | Production unavailability | 2023-03-29T11:47:32+01:00 | 2023-03-29T09:30:00+01:00 | 2023-03-29T10:34:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000008053_002 | Dismissed | Planned | Production unavailability | 2023-03-29T10:33:41+01:00 | 2023-03-29T09:30:00+01:00 | 2023-03-29T10:34:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_BHLAW-1 | 48W00000BHLAW-15 | SSE GENERATION |
48X000000000077M | 0000000000000000000008053_001 | Dismissed | Planned | Production unavailability | 2023-03-28T14:05:46+01:00 | 2023-03-29T09:30:00+01:00 | 2023-03-29T12:00:00+01:00 | MW | 108 | 0 | 108 | Foreseen Maintenance | Planned Outage |
Wind Onshore | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008041_004 | Inactive | Unplanned | Production unavailability | 2023-03-27T11:17:32+01:00 | 2023-03-27T08:50:00+01:00 | 2023-03-27T10:10:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - Fuel Supply |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008041_003 | Dismissed | Unplanned | Production unavailability | 2023-03-27T10:08:24+01:00 | 2023-03-27T08:50:00+01:00 | 2023-03-27T10:10:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - Fuel Supply |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008041_002 | Dismissed | Unplanned | Production unavailability | 2023-03-27T09:36:47+01:00 | 2023-03-27T08:50:00+01:00 | 2023-03-27T10:00:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - Fuel Supply |
Fossil Gas | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008041_001 | Dismissed | Unplanned | Production unavailability | 2023-03-27T08:53:28+01:00 | 2023-03-27T08:50:00+01:00 | 2023-03-27T11:00:00+01:00 | MW | 400 | 780 | 1180 | Failure | Plant Fault - Fuel Supply |
Fossil Gas | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_007 | Inactive | Planned | Production unavailability | 2023-03-26T02:02:31+01:00 | 2023-03-21T10:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_006 | Dismissed | Planned | Production unavailability | 2023-03-17T20:33:45+00:00 | 2023-03-21T10:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_005 | Dismissed | Planned | Production unavailability | 2023-03-14T16:21:02+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-29T13:00:00+01:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_004 | Dismissed | Planned | Production unavailability | 2023-02-24T18:39:23+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_003 | Dismissed | Planned | Production unavailability | 2023-01-23T14:21:55+00:00 | 2023-01-01T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 80 | 0 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_002 | Dismissed | Planned | Production unavailability | 2023-01-12T11:44:47+00:00 | 2023-03-20T06:00:00+00:00 | 2023-03-25T23:59:00+00:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-2 | 48W00000SGRWO-2J | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007809_001 | Dismissed | Planned | Production unavailability | 2022-12-21T13:27:53+00:00 | 2023-02-18T06:00:00+00:00 | 2023-03-25T05:59:00+00:00 | MW | 30 | 50 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008039_002 | Inactive | Planned | Consumption unavailability | 2023-03-25T13:02:31+00:00 | 2023-03-25T06:00:00+00:00 | 2023-03-25T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008040_002 | Inactive | Planned | Consumption unavailability | 2023-03-25T13:02:31+00:00 | 2023-03-25T06:15:00+00:00 | 2023-03-25T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008040_001 | Dismissed | Planned | Consumption unavailability | 2023-03-25T05:29:13+00:00 | 2023-03-25T06:15:00+00:00 | 2023-03-25T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008039_001 | Dismissed | Planned | Consumption unavailability | 2023-03-25T05:27:21+00:00 | 2023-03-25T06:00:00+00:00 | 2023-03-25T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008036_002 | Dismissed | Planned | Production unavailability | 2023-03-24T09:32:53+00:00 | 2023-03-24T08:00:00+00:00 | 2023-03-24T18:00:00+00:00 | MW | 10 | 64 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008036_001 | Dismissed | Planned | Production unavailability | 2023-03-22T17:13:53+00:00 | 2023-03-24T08:00:00+00:00 | 2023-03-24T18:00:00+00:00 | MW | 10 | 64 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008037_004 | Inactive | Planned | Consumption unavailability | 2023-03-23T13:02:32+00:00 | 2023-03-23T02:10:00+00:00 | 2023-03-23T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008037_003 | Dismissed | Planned | Consumption unavailability | 2023-03-23T09:36:14+00:00 | 2023-03-23T02:10:00+00:00 | 2023-03-23T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008037_002 | Dismissed | Planned | Consumption unavailability | 2023-03-23T09:06:46+00:00 | 2023-03-23T02:10:00+00:00 | 2023-03-23T11:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008037_001 | Dismissed | Planned | Consumption unavailability | 2023-03-23T02:00:53+00:00 | 2023-03-23T02:10:00+00:00 | 2023-03-23T10:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008038_004 | Inactive | Planned | Consumption unavailability | 2023-03-23T12:02:32+00:00 | 2023-03-23T03:46:00+00:00 | 2023-03-23T11:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008038_003 | Dismissed | Planned | Consumption unavailability | 2023-03-23T09:36:45+00:00 | 2023-03-23T03:46:00+00:00 | 2023-03-23T11:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008038_002 | Dismissed | Planned | Consumption unavailability | 2023-03-23T09:05:56+00:00 | 2023-03-23T03:46:00+00:00 | 2023-03-23T10:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008038_001 | Dismissed | Planned | Consumption unavailability | 2023-03-23T02:13:16+00:00 | 2023-03-23T03:46:00+00:00 | 2023-03-23T09:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008035_002 | Dismissed | Planned | Production unavailability | 2023-03-23T11:00:16+00:00 | 2023-03-23T08:00:00+00:00 | 2023-03-23T18:00:00+00:00 | MW | 10 | 64 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008035_001 | Dismissed | Planned | Production unavailability | 2023-03-22T17:12:44+00:00 | 2023-03-23T08:00:00+00:00 | 2023-03-23T18:00:00+00:00 | MW | 10 | 64 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008034_002 | Inactive | Planned | Consumption unavailability | 2023-03-22T13:02:32+00:00 | 2023-03-22T08:00:00+00:00 | 2023-03-22T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008034_001 | Dismissed | Planned | Consumption unavailability | 2023-03-22T05:22:49+00:00 | 2023-03-22T08:00:00+00:00 | 2023-03-22T12:00:00+00:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008033_002 | Dismissed | Planned | Production unavailability | 2023-03-21T22:00:22+00:00 | 2023-03-22T08:30:00+00:00 | 2023-03-22T18:00:00+00:00 | MW | 10 | 64 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008033_001 | Dismissed | Planned | Production unavailability | 2023-03-21T09:45:18+00:00 | 2023-03-22T08:30:00+00:00 | 2023-03-22T18:00:00+00:00 | MW | 10 | 64 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008032_003 | Inactive | Planned | Production unavailability | 2023-03-21T15:47:32+00:00 | 2023-03-21T08:30:00+00:00 | 2023-03-21T14:40:00+00:00 | MW | 10 | 64 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008032_002 | Dismissed | Planned | Production unavailability | 2023-03-21T14:30:32+00:00 | 2023-03-21T08:30:00+00:00 | 2023-03-21T14:40:00+00:00 | MW | 10 | 64 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |
Slieve Kirk | 47W000000000280H | SSE Airtricity Energy Supply (NI) Ltd |
47X0000000001920 | 0000000000000000000008032_001 | Dismissed | Planned | Production unavailability | 2023-03-21T09:43:38+00:00 | 2023-03-21T08:30:00+00:00 | 2023-03-21T18:00:00+00:00 | MW | 10 | 64 | 74 | Foreseen Maintenance | Maintenance |
Wind Onshore | 10Y1001A1001A59C |