Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 101 102 103 104 105 > | ||||||||||||||||||
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008198_001 | Dismissed | Planned | Production unavailability | 2023-06-15T16:19:25+01:00 | 2023-06-26T06:30:00+01:00 | 2023-06-26T10:30:00+01:00 | MW | 168 | 0 | 168 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008199_002 | Dismissed | Planned | Production unavailability | 2023-06-23T10:27:17+01:00 | 2023-07-14T15:00:00+01:00 | 2023-07-14T19:00:00+01:00 | MW | 126 | 0 | 126 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-1 | 48W00000BEATO-1T | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008199_001 | Dismissed | Planned | Production unavailability | 2023-06-15T16:28:09+01:00 | 2023-07-14T15:00:00+01:00 | 2023-07-14T19:00:00+01:00 | MW | 126 | 0 | 126 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008200_002 | Dismissed | Planned | Production unavailability | 2023-06-23T10:20:49+01:00 | 2023-07-14T15:00:00+01:00 | 2023-07-14T19:00:00+01:00 | MW | 126 | 0 | 126 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008200_001 | Dismissed | Planned | Production unavailability | 2023-06-15T16:29:40+01:00 | 2023-07-14T15:00:00+01:00 | 2023-07-14T19:00:00+01:00 | MW | 126 | 0 | 126 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008201_002 | Dismissed | Planned | Production unavailability | 2023-06-23T10:19:50+01:00 | 2023-07-14T15:00:00+01:00 | 2023-07-14T19:00:00+01:00 | MW | 168 | 0 | 168 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-3 | 48W00000BEATO-3P | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008201_001 | Dismissed | Planned | Production unavailability | 2023-06-15T16:30:51+01:00 | 2023-07-14T15:00:00+01:00 | 2023-07-14T19:00:00+01:00 | MW | 168 | 0 | 168 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008202_002 | Dismissed | Planned | Production unavailability | 2023-06-23T10:18:44+01:00 | 2023-07-14T15:00:00+01:00 | 2023-07-14T19:00:00+01:00 | MW | 168 | 0 | 168 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_BEATO-4 | 48W00000BEATO-4N | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008202_001 | Dismissed | Planned | Production unavailability | 2023-06-15T16:31:55+01:00 | 2023-07-14T15:00:00+01:00 | 2023-07-14T19:00:00+01:00 | MW | 168 | 0 | 168 | Shutdown | Grid |
Wind Offshore | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000007529_003 | Inactive | Planned | Production unavailability | 2023-06-22T18:02:32+01:00 | 2023-06-05T08:30:00+01:00 | 2023-06-22T16:55:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000007529_002 | Dismissed | Planned | Production unavailability | 2023-06-22T16:54:20+01:00 | 2023-06-05T08:30:00+01:00 | 2023-06-22T16:55:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
T_GLNDO-1 | 48W00000GLNDO-1G | SSE GENERATION |
48X000000000077M | 0000000000000000000007529_001 | Dismissed | Planned | Production unavailability | 2022-08-23T13:45:20+01:00 | 2023-06-05T08:30:00+01:00 | 2023-06-23T16:30:00+01:00 | MW | 100 | 0 | 100 | Foreseen Maintenance | Maintenance |
Hydro Water Reservoir | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_014 | Inactive | Planned | Production unavailability | 2023-06-21T13:02:33+01:00 | 2023-06-03T14:26:00+01:00 | 2023-06-21T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_013 | Dismissed | Planned | Production unavailability | 2023-06-09T15:39:50+01:00 | 2023-06-03T14:26:00+01:00 | 2023-06-21T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_012 | Dismissed | Planned | Production unavailability | 2023-06-03T14:50:10+01:00 | 2023-06-03T14:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_011 | Dismissed | Planned | Production unavailability | 2023-06-03T14:49:42+01:00 | 2023-05-26T13:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_010 | Dismissed | Planned | Production unavailability | 2023-05-26T09:29:42+01:00 | 2023-05-26T13:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_009 | Dismissed | Planned | Production unavailability | 2023-05-24T11:36:21+01:00 | 2023-05-28T13:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_008 | Dismissed | Planned | Production unavailability | 2023-05-24T10:07:59+01:00 | 2023-06-04T13:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_007 | Dismissed | Planned | Production unavailability | 2023-05-22T17:47:47+01:00 | 2023-05-25T14:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_006 | Dismissed | Planned | Production unavailability | 2023-05-19T17:44:54+01:00 | 2023-05-23T14:00:00+01:00 | 2023-06-16T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_005 | Dismissed | Planned | Production unavailability | 2023-05-16T13:19:17+01:00 | 2023-05-23T14:00:00+01:00 | 2023-05-29T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_004 | Dismissed | Planned | Production unavailability | 2023-05-15T17:14:06+01:00 | 2023-05-16T00:00:00+01:00 | 2023-05-29T12:00:00+01:00 | MW | 108 | 250 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_003 | Dismissed | Planned | Production unavailability | 2023-04-19T12:30:31+01:00 | 2023-05-11T12:01:00+01:00 | 2023-05-29T12:00:00+01:00 | MW | 98 | 260 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_002 | Dismissed | Planned | Production unavailability | 2023-03-17T20:53:49+00:00 | 2023-04-29T12:00:00+01:00 | 2023-06-08T12:00:00+01:00 | MW | 68 | 290 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000007996_001 | Dismissed | Planned | Production unavailability | 2023-02-24T19:35:37+00:00 | 2023-04-19T06:00:00+01:00 | 2023-06-03T05:59:00+01:00 | MW | 28 | 330 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008204_004 | Inactive | Planned | Consumption unavailability | 2023-06-21T09:02:33+01:00 | 2023-06-19T14:03:00+01:00 | 2023-06-21T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008204_003 | Dismissed | Planned | Consumption unavailability | 2023-06-21T07:45:47+01:00 | 2023-06-19T14:03:00+01:00 | 2023-06-21T08:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008204_002 | Dismissed | Planned | Consumption unavailability | 2023-06-20T19:58:23+01:00 | 2023-06-19T14:03:00+01:00 | 2023-06-21T09:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000008204_001 | Dismissed | Planned | Consumption unavailability | 2023-06-19T14:05:21+01:00 | 2023-06-19T14:03:00+01:00 | 2023-06-20T20:00:00+01:00 | MW | 150 | 0 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008179_007 | Inactive | Unplanned | Production unavailability | 2023-06-18T18:02:32+01:00 | 2023-06-08T13:04:00+01:00 | 2023-06-18T17:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008179_006 | Dismissed | Unplanned | Production unavailability | 2023-06-18T10:38:07+01:00 | 2023-06-08T13:04:00+01:00 | 2023-06-18T17:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008179_005 | Dismissed | Unplanned | Production unavailability | 2023-06-16T09:36:53+01:00 | 2023-06-08T13:04:00+01:00 | 2023-06-19T02:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008179_004 | Dismissed | Unplanned | Production unavailability | 2023-06-14T10:59:05+01:00 | 2023-06-08T13:04:00+01:00 | 2023-06-20T10:00:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008179_003 | Dismissed | Unplanned | Production unavailability | 2023-06-08T15:33:01+01:00 | 2023-06-08T13:04:00+01:00 | 2023-06-15T16:34:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008179_002 | Dismissed | Unplanned | Production unavailability | 2023-06-08T14:08:53+01:00 | 2023-06-08T13:04:00+01:00 | 2023-06-08T16:34:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
Great Island | 47W0000000001024 | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008179_001 | Dismissed | Unplanned | Production unavailability | 2023-06-08T13:12:15+01:00 | 2023-06-08T13:04:00+01:00 | 2023-06-08T15:04:00+01:00 | MW | 464 | 0 | 464 | Failure | Plant Fault - Gas Turbine |
Fossil Gas | 10Y1001A1001A59C |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008194_002 | Dismissed | Planned | Production unavailability | 2023-06-15T14:03:11+01:00 | 2023-06-15T13:50:00+01:00 | 2023-06-15T14:10:00+01:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
DBAWO-1 | 48W00000DBAWO-1J | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000008194_001 | Dismissed | Planned | Production unavailability | 2023-06-15T13:51:30+01:00 | 2023-06-15T13:50:00+01:00 | 2023-06-15T14:10:00+01:00 | MW | 302 | 0 | 302 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008192_002 | Inactive | Planned | Production unavailability | 2023-06-14T17:32:32+01:00 | 2023-06-14T15:30:00+01:00 | 2023-06-14T16:30:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008192_001 | Dismissed | Planned | Production unavailability | 2023-06-14T15:18:29+01:00 | 2023-06-14T15:30:00+01:00 | 2023-06-14T16:30:00+01:00 | MW | 358 | 0 | 358 | Shutdown | Plant Fault - Auxiliary Equipment |
Wind Offshore | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008193_003 | Inactive | Planned | Production unavailability | 2023-06-14T17:02:32+01:00 | 2023-06-14T15:28:00+01:00 | 2023-06-14T16:00:00+01:00 | MW | 610 | 230 | 840 | Foreseen Maintenance | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008193_002 | Dismissed | Planned | Production unavailability | 2023-06-14T15:38:49+01:00 | 2023-06-14T15:28:00+01:00 | 2023-06-14T16:00:00+01:00 | MW | 610 | 230 | 840 | Foreseen Maintenance | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008193_001 | Dismissed | Planned | Production unavailability | 2023-06-14T15:27:51+01:00 | 2023-06-14T15:28:00+01:00 | 2023-06-14T15:45:00+01:00 | MW | 610 | 230 | 840 | Foreseen Maintenance | Plant Fault - HRSG |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008191_002 | Inactive | Planned | Production unavailability | 2023-06-14T14:32:32+01:00 | 2023-06-14T13:10:00+01:00 | 2023-06-14T13:30:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Plant Fault - Electrical Equipment |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008191_001 | Dismissed | Planned | Production unavailability | 2023-06-14T13:08:49+01:00 | 2023-06-14T13:10:00+01:00 | 2023-06-14T13:30:00+01:00 | MW | 840 | 0 | 840 | Foreseen Maintenance | Plant Fault - Electrical Equipment |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008190_005 | Inactive | Planned | Production unavailability | 2023-06-14T14:02:32+01:00 | 2023-06-14T12:00:00+01:00 | 2023-06-14T13:00:00+01:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008190_004 | Dismissed | Planned | Production unavailability | 2023-06-14T12:32:36+01:00 | 2023-06-14T12:00:00+01:00 | 2023-06-14T13:00:00+01:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008190_003 | Dismissed | Planned | Production unavailability | 2023-06-14T12:18:04+01:00 | 2023-06-14T12:00:00+01:00 | 2023-06-14T13:45:00+01:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10YGB----------A |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008190_002 | Dismissed | Planned | Production unavailability | 2023-06-14T12:14:49+01:00 | 2023-06-14T12:00:00+01:00 | 2023-06-14T12:45:00+01:00 | MW | 840 | 0 | 840 | Failure | Plant Fault - Electrical Equipment |
Fossil Gas | 10YGB----------A |