Last update at: 2024-04-16T16:30:00+01:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000009002_004 Dismissed Unplanned Production unavailability 2024-04-10T17:10:47+01:00 2024-04-10T16:25:00+01:00 2024-04-10T17:20:00+01:00 MW 603 237 840 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000009002_003 Dismissed Unplanned Production unavailability 2024-04-10T16:56:01+01:00 2024-04-10T16:25:00+01:00 2024-04-10T17:20:00+01:00 MW 603 237 840 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000009002_002 Dismissed Unplanned Production unavailability 2024-04-10T16:37:22+01:00 2024-04-10T16:25:00+01:00 2024-04-10T16:55:00+01:00 MW 603 237 840 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000009002_001 Dismissed Unplanned Production unavailability 2024-04-10T16:26:11+01:00 2024-04-10T16:25:00+01:00 2024-04-10T16:42:00+01:00 MW 603 237 840 Failure
Plant Fault - HRSG
Fossil Gas 10YGB----------A
Cloosh 47W0000000003918
CLOOSH VALLEY WIND FARM DESIGNATED ACTIVITY COMPANY
47X0000000002099 0000000000000000000009001_002 Active Planned Production unavailability 2024-04-10T15:43:55+01:00 2024-04-22T11:00:00+01:00 2024-04-27T15:00:00+01:00 MW 105 0 105 Foreseen Maintenance
Planned Outage
Wind Onshore 10Y1001A1001A59C
Cloosh 47W0000000003918
CLOOSH VALLEY WIND FARM DESIGNATED ACTIVITY COMPANY
47X0000000002099 0000000000000000000009001_001 Dismissed Planned Production unavailability 2024-04-10T15:39:51+01:00 2024-04-22T11:00:00+01:00 2024-04-27T15:00:00+01:00 MW 105 0 105 Foreseen Maintenance
Maintenance
Wind Onshore 10Y1001A1001A59C
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008886_005 Dismissed Planned Production unavailability 2024-04-10T15:23:55+01:00 2024-03-25T07:00:00+00:00 2024-04-10T15:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008886_004 Dismissed Planned Production unavailability 2024-04-09T12:46:36+01:00 2024-03-25T07:00:00+00:00 2024-04-10T15:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008886_003 Dismissed Planned Production unavailability 2024-04-08T12:06:00+01:00 2024-03-25T07:00:00+00:00 2024-04-09T15:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008886_002 Dismissed Planned Production unavailability 2024-03-28T15:24:59+00:00 2024-03-25T07:00:00+00:00 2024-04-14T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-2 48W00000BEATO-2R
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008886_001 Dismissed Planned Production unavailability 2024-02-27T08:14:11+00:00 2024-03-25T07:00:00+00:00 2024-04-08T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008887_005 Dismissed Planned Production unavailability 2024-04-10T15:23:31+01:00 2024-03-25T07:00:00+00:00 2024-04-10T15:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008887_004 Dismissed Planned Production unavailability 2024-04-09T12:46:55+01:00 2024-03-25T07:00:00+00:00 2024-04-10T15:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008887_003 Dismissed Planned Production unavailability 2024-04-08T12:05:30+01:00 2024-03-25T07:00:00+00:00 2024-04-09T15:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008887_002 Dismissed Planned Production unavailability 2024-03-28T15:25:25+00:00 2024-03-25T07:00:00+00:00 2024-04-14T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-4 48W00000BEATO-4N
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008887_001 Dismissed Planned Production unavailability 2024-02-27T08:15:35+00:00 2024-03-25T07:00:00+00:00 2024-04-08T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008889_004 Dismissed Planned Production unavailability 2024-04-10T15:23:02+01:00 2024-04-10T11:00:00+01:00 2024-04-10T15:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008889_003 Dismissed Planned Production unavailability 2024-04-09T12:47:21+01:00 2024-04-10T11:00:00+01:00 2024-04-10T15:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008889_002 Dismissed Planned Production unavailability 2024-04-08T12:04:32+01:00 2024-04-09T11:00:00+01:00 2024-04-09T15:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008889_001 Dismissed Planned Production unavailability 2024-02-27T08:19:33+00:00 2024-04-08T17:00:00+01:00 2024-04-08T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008888_004 Dismissed Planned Production unavailability 2024-04-10T15:22:41+01:00 2024-04-10T11:00:00+01:00 2024-04-10T15:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008888_003 Dismissed Planned Production unavailability 2024-04-09T12:47:41+01:00 2024-04-10T11:00:00+01:00 2024-04-10T15:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008888_002 Dismissed Planned Production unavailability 2024-04-08T12:02:31+01:00 2024-04-09T11:00:00+01:00 2024-04-09T15:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008888_001 Dismissed Planned Production unavailability 2024-02-27T08:17:16+00:00 2024-04-08T17:00:00+01:00 2024-04-08T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_013 Inactive Planned Production unavailability 2024-04-10T13:02:32+01:00 2024-03-18T08:00:00+00:00 2024-04-10T12:00:00+01:00 MW 211 91 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_012 Dismissed Planned Production unavailability 2024-03-27T11:39:58+00:00 2024-03-18T08:00:00+00:00 2024-04-10T12:00:00+01:00 MW 211 91 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_011 Dismissed Planned Production unavailability 2024-03-27T11:35:01+00:00 2024-03-18T08:00:00+00:00 2024-04-10T12:20:00+01:00 MW 211 91 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_010 Dismissed Planned Production unavailability 2024-03-26T17:21:48+00:00 2024-03-18T08:00:00+00:00 2024-03-29T00:00:00+00:00 MW 276 26 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_009 Dismissed Planned Production unavailability 2024-03-26T17:03:41+00:00 2024-03-18T08:00:00+00:00 2024-03-29T00:00:00+00:00 MW 289 13 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_008 Dismissed Planned Production unavailability 2024-03-25T14:21:18+00:00 2024-03-18T08:00:00+00:00 2024-03-27T17:00:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_007 Dismissed Planned Production unavailability 2024-03-22T08:14:22+00:00 2024-03-18T08:00:00+00:00 2024-03-26T16:00:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_006 Dismissed Planned Production unavailability 2024-03-22T07:32:06+00:00 2024-03-18T08:00:00+00:00 2024-03-26T15:00:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_005 Dismissed Planned Production unavailability 2024-03-19T12:08:19+00:00 2024-03-18T08:00:00+00:00 2024-03-25T10:10:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_004 Dismissed Planned Production unavailability 2024-03-19T09:26:52+00:00 2024-03-18T08:00:00+00:00 2024-03-25T10:10:00+00:00 MW 26 276 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_003 Dismissed Planned Production unavailability 2024-03-17T17:49:29+00:00 2024-03-18T08:00:00+00:00 2024-03-25T10:10:00+00:00 MW 26 0 26 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_002 Dismissed Planned Production unavailability 2024-02-14T16:00:30+00:00 2024-03-18T08:00:00+00:00 2024-03-25T10:10:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_001 Dismissed Planned Production unavailability 2024-02-02T10:12:16+00:00 2024-02-19T08:00:00+00:00 2024-02-26T10:10:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009000_003 Inactive Planned Consumption unavailability 2024-04-10T11:02:32+01:00 2024-04-09T21:00:00+01:00 2024-04-10T10:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009000_002 Dismissed Planned Consumption unavailability 2024-04-10T04:29:12+01:00 2024-04-09T21:00:00+01:00 2024-04-10T10:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000009000_001 Dismissed Planned Consumption unavailability 2024-04-09T20:45:09+01:00 2024-04-09T21:00:00+01:00 2024-04-10T06:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008992_007 Inactive Planned Consumption unavailability 2024-04-08T21:02:32+01:00 2024-04-06T08:30:00+01:00 2024-04-08T20:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008992_006 Dismissed Planned Consumption unavailability 2024-04-08T18:21:54+01:00 2024-04-06T08:30:00+01:00 2024-04-08T20:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008992_005 Dismissed Planned Consumption unavailability 2024-04-08T14:37:57+01:00 2024-04-06T08:30:00+01:00 2024-04-09T00:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008992_004 Dismissed Planned Consumption unavailability 2024-04-08T08:48:18+01:00 2024-04-06T08:30:00+01:00 2024-04-08T16:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008992_003 Dismissed Planned Consumption unavailability 2024-04-07T20:03:07+01:00 2024-04-06T08:30:00+01:00 2024-04-08T12:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008992_002 Dismissed Planned Consumption unavailability 2024-04-07T08:20:22+01:00 2024-04-06T08:30:00+01:00 2024-04-08T00:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008992_001 Dismissed Planned Consumption unavailability 2024-04-06T06:59:06+01:00 2024-04-06T08:30:00+01:00 2024-04-07T10:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008991_007 Inactive Planned Consumption unavailability 2024-04-08T20:02:32+01:00 2024-04-06T07:00:00+01:00 2024-04-08T19:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008991_006 Dismissed Planned Consumption unavailability 2024-04-08T18:21:26+01:00 2024-04-06T07:00:00+01:00 2024-04-08T19:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008991_005 Dismissed Planned Consumption unavailability 2024-04-08T14:38:31+01:00 2024-04-06T07:00:00+01:00 2024-04-09T00:00:00+01:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A