This site is optimised for modern web browsers, and does not fully support your Internet Browser version.

Last update at: 2024-03-29T12:30:00+00:00

**Please note that the last update time shown is rounded to the next market interval of 30 minutes

All times are in UTC.

  

Filter Options

Date of event: From date:
To date:
Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
< 1 2 3 4 5 >
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_006 Dismissed Planned Production unavailability 2024-03-14T09:18:29+00:00 2024-01-23T10:00:00+00:00 2024-03-29T17:00:00+00:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_005 Dismissed Planned Production unavailability 2024-03-13T22:55:04+00:00 2024-01-23T10:00:00+00:00 2024-05-15T00:00:00+01:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_004 Dismissed Planned Production unavailability 2024-02-09T09:59:42+00:00 2024-01-23T10:00:00+00:00 2024-03-15T00:00:00+00:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_003 Dismissed Planned Production unavailability 2024-01-23T09:58:32+00:00 2024-01-23T10:00:00+00:00 2024-02-29T17:00:00+00:00 MW 26 26 52 Foreseen Maintenance
Plant Fault - Gas Turbine
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_002 Dismissed Planned Production unavailability 2024-01-22T13:32:41+00:00 2024-06-29T09:00:00+01:00 2024-07-05T17:00:00+01:00 MW 26 26 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
TAWN1 47W000000000214U
SSE Generation Ireland Ltd
47X0000000000592 0000000000000000000008641_001 Dismissed Planned Production unavailability 2023-11-27T12:35:21+00:00 2024-06-29T09:00:00+01:00 2024-07-05T17:00:00+01:00 MW 52 0 52 Foreseen Maintenance
Planned Outage
Fossil Gas 10Y1001A1001A59C
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_012 Active Planned Production unavailability 2024-03-27T11:39:58+00:00 2024-03-18T08:00:00+00:00 2024-04-10T12:00:00+01:00 MW 211 91 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_011 Dismissed Planned Production unavailability 2024-03-27T11:35:01+00:00 2024-03-18T08:00:00+00:00 2024-04-10T12:20:00+01:00 MW 211 91 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_010 Dismissed Planned Production unavailability 2024-03-26T17:21:48+00:00 2024-03-18T08:00:00+00:00 2024-03-29T00:00:00+00:00 MW 276 26 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_009 Dismissed Planned Production unavailability 2024-03-26T17:03:41+00:00 2024-03-18T08:00:00+00:00 2024-03-29T00:00:00+00:00 MW 289 13 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_008 Dismissed Planned Production unavailability 2024-03-25T14:21:18+00:00 2024-03-18T08:00:00+00:00 2024-03-27T17:00:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_007 Dismissed Planned Production unavailability 2024-03-22T08:14:22+00:00 2024-03-18T08:00:00+00:00 2024-03-26T16:00:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_006 Dismissed Planned Production unavailability 2024-03-22T07:32:06+00:00 2024-03-18T08:00:00+00:00 2024-03-26T15:00:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_005 Dismissed Planned Production unavailability 2024-03-19T12:08:19+00:00 2024-03-18T08:00:00+00:00 2024-03-25T10:10:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_004 Dismissed Planned Production unavailability 2024-03-19T09:26:52+00:00 2024-03-18T08:00:00+00:00 2024-03-25T10:10:00+00:00 MW 26 276 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_003 Dismissed Planned Production unavailability 2024-03-17T17:49:29+00:00 2024-03-18T08:00:00+00:00 2024-03-25T10:10:00+00:00 MW 26 0 26 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_002 Dismissed Planned Production unavailability 2024-02-14T16:00:30+00:00 2024-03-18T08:00:00+00:00 2024-03-25T10:10:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008829_001 Dismissed Planned Production unavailability 2024-02-02T10:12:16+00:00 2024-02-19T08:00:00+00:00 2024-02-26T10:10:00+00:00 MW 302 0 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008961_001 Active Planned Production unavailability 2024-03-27T11:39:35+00:00 2024-04-10T12:00:00+01:00 2024-04-26T12:00:00+01:00 MW 146 156 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008960_002 Inactive Planned Production unavailability 2024-03-27T00:02:32+00:00 2024-03-26T19:30:00+00:00 2024-03-26T23:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008960_001 Dismissed Planned Production unavailability 2024-03-26T18:55:45+00:00 2024-03-26T19:30:00+00:00 2024-03-26T23:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008956_005 Inactive Planned Consumption unavailability 2024-03-24T16:02:32+00:00 2024-03-22T16:35:00+00:00 2024-03-24T15:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008956_004 Dismissed Planned Consumption unavailability 2024-03-24T05:22:20+00:00 2024-03-22T16:35:00+00:00 2024-03-24T15:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008956_003 Dismissed Planned Consumption unavailability 2024-03-23T21:47:20+00:00 2024-03-22T16:35:00+00:00 2024-03-24T10:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008959_002 Inactive Planned Consumption unavailability 2024-03-24T16:02:32+00:00 2024-03-24T06:08:00+00:00 2024-03-24T15:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008956_002 Dismissed Planned Consumption unavailability 2024-03-23T08:02:38+00:00 2024-03-22T16:35:00+00:00 2024-03-23T23:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-2 48W000000FOYE-22
SSE GENERATION
48X000000000077M 0000000000000000000008956_001 Dismissed Planned Consumption unavailability 2024-03-22T16:29:45+00:00 2024-03-22T16:35:00+00:00 2024-03-23T10:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008959_001 Dismissed Planned Consumption unavailability 2024-03-24T05:21:51+00:00 2024-03-24T06:08:00+00:00 2024-03-24T15:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008958_003 Inactive Planned Consumption unavailability 2024-03-24T00:02:32+00:00 2024-03-22T17:45:00+00:00 2024-03-23T23:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008958_002 Dismissed Planned Consumption unavailability 2024-03-23T08:02:15+00:00 2024-03-22T17:45:00+00:00 2024-03-23T23:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008958_001 Dismissed Planned Consumption unavailability 2024-03-22T17:46:55+00:00 2024-03-22T17:45:00+00:00 2024-03-23T10:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000008957_003 Inactive Unplanned Production unavailability 2024-03-22T18:32:32+00:00 2024-03-22T16:40:00+00:00 2024-03-22T17:25:00+00:00 MW 610 230 840 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000008957_002 Dismissed Unplanned Production unavailability 2024-03-22T17:11:03+00:00 2024-03-22T16:40:00+00:00 2024-03-22T17:25:00+00:00 MW 610 230 840 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_KEAD-2 48W000000KEAD-23
KEADBY GEN. LTD
48X000000000073U 0000000000000000000008957_001 Dismissed Unplanned Production unavailability 2024-03-22T17:02:26+00:00 2024-03-22T16:40:00+00:00 2024-03-22T17:15:00+00:00 MW 610 230 840 Failure
Plant Fault - Turbine
Fossil Gas 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008885_003 Dismissed Planned Production unavailability 2024-03-22T15:05:23+00:00 2024-03-25T07:00:00+00:00 2024-03-25T11:00:00+00:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008885_002 Dismissed Planned Production unavailability 2024-02-27T08:23:14+00:00 2024-03-25T07:00:00+00:00 2024-03-25T11:00:00+00:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008885_001 Dismissed Planned Production unavailability 2024-02-27T08:11:26+00:00 2024-03-25T08:00:00+00:00 2024-03-25T11:00:00+00:00 MW 168 0 168 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008884_004 Dismissed Planned Production unavailability 2024-03-22T15:04:49+00:00 2024-03-25T07:00:00+00:00 2024-03-25T11:00:00+00:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008884_003 Dismissed Planned Production unavailability 2024-02-27T08:23:40+00:00 2024-03-25T07:00:00+00:00 2024-03-25T11:00:00+00:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008884_002 Dismissed Planned Production unavailability 2024-02-27T08:11:44+00:00 2024-03-25T08:00:00+00:00 2024-03-25T11:00:00+00:00 MW 126 0 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000008884_001 Dismissed Planned Production unavailability 2024-02-27T08:09:56+00:00 2024-03-25T08:00:00+00:00 2024-03-25T11:00:00+00:00 MW 0 126 126 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008954_003 Inactive Planned Consumption unavailability 2024-03-22T15:02:32+00:00 2024-03-22T09:00:00+00:00 2024-03-22T14:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008954_002 Dismissed Planned Consumption unavailability 2024-03-22T11:38:16+00:00 2024-03-22T09:00:00+00:00 2024-03-22T14:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
T_FOYE-1 48W000000FOYE-14
SSE GENERATION
48X000000000077M 0000000000000000000008954_001 Dismissed Planned Consumption unavailability 2024-03-22T06:43:27+00:00 2024-03-22T09:00:00+00:00 2024-03-22T12:00:00+00:00 MW 150 0 150 Shutdown
Water Management
Hydro Pumped Storage 10YGB----------A
VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008955_003 Dismissed Planned Production unavailability 2024-03-22T11:46:50+00:00 2024-03-22T10:30:00+00:00 2024-03-22T11:30:00+00:00 MW 10 0 10 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008955_002 Dismissed Planned Production unavailability 2024-03-22T11:10:29+00:00 2024-03-22T10:30:00+00:00 2024-03-22T11:30:00+00:00 MW 10 0 10 Shutdown
Commissioning
Wind Onshore 10YGB----------A
VKNGW-3 48W00000VKNGW-30
Viking Energy Wind Farm LLP
48X000000000314Y 0000000000000000000008955_001 Dismissed Planned Production unavailability 2024-03-22T10:24:43+00:00 2024-03-22T10:30:00+00:00 2024-03-22T11:00:00+00:00 MW 10 0 10 Shutdown
Commissioning
Wind Onshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_030 Active Planned Production unavailability 2024-03-22T08:16:23+00:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_029 Dismissed Planned Production unavailability 2024-03-22T07:35:55+00:00 2023-07-18T14:00:00+01:00 2024-11-11T09:00:00+00:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_028 Dismissed Planned Production unavailability 2024-03-22T07:33:55+00:00 2023-07-18T14:00:00+01:00 2025-01-08T09:00:00+00:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A