| Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| < 1 2 3 4 5 > | ||||||||||||||||||
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010192_001 | Dismissed | Planned | Consumption unavailability | 2025-05-27T10:57:11+00:00 | 2025-06-01T07:00:00+00:00 | 2025-06-01T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010212_002 | Dismissed | Planned | Production unavailability | 2025-05-30T10:47:46+00:00 | 2025-06-01T07:00:00+00:00 | 2025-06-01T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010212_001 | Dismissed | Planned | Production unavailability | 2025-05-27T12:21:47+00:00 | 2025-06-01T07:00:00+00:00 | 2025-06-01T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010213_002 | Dismissed | Planned | Consumption unavailability | 2025-05-30T10:46:49+00:00 | 2025-06-01T07:00:00+00:00 | 2025-06-01T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010213_001 | Dismissed | Planned | Consumption unavailability | 2025-05-27T12:23:19+00:00 | 2025-06-01T07:00:00+00:00 | 2025-06-01T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010188_002 | Dismissed | Planned | Production unavailability | 2025-05-30T10:41:37+00:00 | 2025-05-31T07:00:00+00:00 | 2025-05-31T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010188_001 | Dismissed | Planned | Production unavailability | 2025-05-27T10:49:25+00:00 | 2025-05-31T07:00:00+00:00 | 2025-05-31T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010189_002 | Dismissed | Planned | Consumption unavailability | 2025-05-30T10:41:16+00:00 | 2025-05-31T07:00:00+00:00 | 2025-05-31T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010189_001 | Dismissed | Planned | Consumption unavailability | 2025-05-27T10:51:06+00:00 | 2025-05-31T07:00:00+00:00 | 2025-05-31T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010208_002 | Dismissed | Planned | Production unavailability | 2025-05-30T10:40:45+00:00 | 2025-05-31T07:00:00+00:00 | 2025-05-31T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010208_001 | Dismissed | Planned | Production unavailability | 2025-05-27T11:54:19+00:00 | 2025-05-31T07:00:00+00:00 | 2025-05-31T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010209_002 | Dismissed | Planned | Consumption unavailability | 2025-05-30T10:40:20+00:00 | 2025-05-31T07:00:00+00:00 | 2025-05-31T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010209_001 | Dismissed | Planned | Consumption unavailability | 2025-05-27T11:56:42+00:00 | 2025-05-31T07:00:00+00:00 | 2025-05-31T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010184_001 | Dismissed | Planned | Production unavailability | 2025-05-27T10:42:29+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010185_001 | Dismissed | Planned | Consumption unavailability | 2025-05-27T10:44:06+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010182_001 | Dismissed | Planned | Production unavailability | 2025-05-27T10:36:50+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010183_001 | Dismissed | Planned | Consumption unavailability | 2025-05-27T10:38:23+00:00 | 2025-05-29T07:00:00+00:00 | 2025-05-29T21:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_005 | Dismissed | Planned | Production unavailability | 2025-05-23T10:56:47+00:00 | 2025-05-09T12:28:30+00:00 | 2025-06-03T17:00:33+00:00 | MW | 0 | 195 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010129_003 | Dismissed | Planned | Production unavailability | 2025-05-21T07:58:17+00:00 | 2025-05-09T12:28:30+00:00 | 2025-05-27T12:28:33+00:00 | MW | 0 | 195 | 195 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010022_004 | Dismissed | Planned | Production unavailability | 2025-05-23T15:23:14+00:00 | 2025-06-06T08:00:00+00:00 | 2025-06-06T12:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010022_003 | Dismissed | Planned | Production unavailability | 2025-05-16T12:03:51+00:00 | 2025-06-06T08:00:00+00:00 | 2025-06-06T12:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000010022_002 | Dismissed | Planned | Production unavailability | 2025-03-27T14:32:21+00:00 | 2025-06-04T08:00:00+00:00 | 2025-06-04T12:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009654_012 | Dismissed | Planned | Production unavailability | 2025-01-31T12:24:05+00:00 | 2024-11-22T09:00:00+00:00 | 2025-02-07T17:00:00+00:00 | MW | 0 | 156 | 156 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-2 | 48W00000DBAWO-2H | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009654_011 | Dismissed | Planned | Production unavailability | 2025-01-31T10:43:44+00:00 | 2024-11-22T09:00:00+00:00 | 2025-02-07T17:00:00+00:00 | MW | 0 | 39 | 39 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010139_002 | Inactive | Planned | Production unavailability | 2025-05-12T18:02:32+00:00 | 2025-05-12T15:00:00+00:00 | 2025-05-12T17:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010139_001 | Dismissed | Planned | Production unavailability | 2025-05-12T12:39:57+00:00 | 2025-05-12T15:00:00+00:00 | 2025-05-12T17:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010107_003 | Inactive | Planned | Production unavailability | 2025-05-01T19:02:32+00:00 | 2025-05-01T15:00:00+00:00 | 2025-05-01T18:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010107_002 | Dismissed | Planned | Production unavailability | 2025-05-01T12:37:25+00:00 | 2025-05-01T15:00:00+00:00 | 2025-05-01T18:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000010107_001 | Dismissed | Planned | Production unavailability | 2025-05-01T09:23:37+00:00 | 2025-05-01T16:00:00+00:00 | 2025-05-01T18:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010086_002 | Inactive | Planned | Production unavailability | 2025-04-29T18:02:33+00:00 | 2025-04-22T09:00:01+00:00 | 2025-04-29T17:00:13+00:00 | MW | 0 | 117 | 117 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000010086_001 | Dismissed | Planned | Production unavailability | 2025-04-22T08:51:52+00:00 | 2025-04-22T09:00:01+00:00 | 2025-04-29T17:00:13+00:00 | MW | 0 | 117 | 117 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009980_008 | Inactive | Planned | Production unavailability | 2025-04-28T18:02:32+00:00 | 2025-03-12T10:50:29+00:00 | 2025-04-28T17:00:50+00:00 | MW | 0 | 78 | 78 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009980_007 | Dismissed | Planned | Production unavailability | 2025-04-17T10:44:45+00:00 | 2025-03-12T10:50:29+00:00 | 2025-04-28T17:00:50+00:00 | MW | 0 | 78 | 78 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009980_006 | Dismissed | Planned | Production unavailability | 2025-04-11T10:56:29+00:00 | 2025-03-12T10:50:29+00:00 | 2025-04-22T17:00:50+00:00 | MW | 0 | 78 | 78 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009980_003 | Dismissed | Planned | Production unavailability | 2025-03-21T10:42:51+00:00 | 2025-03-12T10:50:29+00:00 | 2025-03-31T17:00:50+00:00 | MW | 0 | 78 | 78 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_DBAWO-3 | 48W00000DBAWO-3F | Doggerbank Offshore Wind Farm Project 1 Projco Limited |
48X0000000003113 | 0000000000000000000009980_002 | Dismissed | Planned | Production unavailability | 2025-03-14T11:19:16+00:00 | 2025-03-12T10:50:29+00:00 | 2025-03-21T17:00:50+00:00 | MW | 0 | 78 | 78 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
| T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000010082_001 | Dismissed | Unplanned | Production unavailability | 2025-04-18T22:27:12+00:00 | 2025-04-18T22:25:17+00:00 | 2025-04-19T07:00:38+00:00 | MW | 0 | 126 | 126 | Failure | Plant Fault - Turbine |
Wind Offshore | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009952_003 | Inactive | Planned | Consumption unavailability | 2025-04-02T13:17:33+00:00 | 2025-04-02T09:30:00+00:00 | 2025-04-02T12:10:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009952_002 | Dismissed | Planned | Consumption unavailability | 2025-04-02T12:05:40+00:00 | 2025-04-02T09:30:00+00:00 | 2025-04-02T12:10:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009952_001 | Dismissed | Planned | Consumption unavailability | 2025-03-05T16:24:31+00:00 | 2025-04-02T09:30:00+00:00 | 2025-04-02T15:30:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009996_001 | Dismissed | Unplanned | Production unavailability | 2025-03-16T14:52:27+00:00 | 2025-03-16T14:51:28+00:00 | 2025-03-16T17:00:32+00:00 | MW | 0 | 150 | 150 | Failure | Plant Fault - Auxiliary Equipment |
Hydro Pumped Storage | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009940_002 | Dismissed | Planned | Production unavailability | 2025-03-12T11:30:42+00:00 | 2025-03-12T08:00:00+00:00 | 2025-03-12T15:00:00+00:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000009940_001 | Dismissed | Planned | Production unavailability | 2025-02-28T14:18:02+00:00 | 2025-03-12T08:00:00+00:00 | 2025-03-12T13:00:00+00:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009815_003 | Inactive | Planned | Production unavailability | 2025-01-14T18:02:31+00:00 | 2025-01-14T15:00:00+00:00 | 2025-01-14T17:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009815_002 | Dismissed | Planned | Production unavailability | 2025-01-14T10:49:19+00:00 | 2025-01-14T15:00:00+00:00 | 2025-01-14T17:00:00+00:00 | MW | 0 | 150 | 150 | Failure | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009815_001 | Dismissed | Planned | Production unavailability | 2025-01-14T10:46:33+00:00 | 2025-01-14T15:00:00+00:00 | 2025-01-14T17:00:00+00:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
| T_FOYE-2 | 48W000000FOYE-22 | SSE GENERATION |
48X000000000077M | 0000000000000000000009751_001 | Dismissed | Planned | Consumption unavailability | 2024-12-22T09:59:23+00:00 | 2024-12-22T11:00:51+00:00 | 2024-12-22T15:00:13+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| Yellow River | 47W0000000004914 | SSE Airtricity Limited |
23X--140207ALT-9 | 0000000000000000000009733_002 | Dismissed | Unplanned | Production unavailability | 2024-12-13T11:37:33+00:00 | 2024-12-13T11:32:00+00:00 | 2024-12-13T11:36:00+00:00 | MW | 0 | 15 | 15 | Foreseen Maintenance | Commissioning |
Wind Onshore | 10Y1001A1001A59C |
| T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000009712_001 | Dismissed | Planned | Consumption unavailability | 2024-12-07T11:11:41+00:00 | 2024-12-07T12:00:00+00:00 | 2024-12-07T23:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
| T_GRGBW-1 | 48W00000GRGBW-1V | Greater Gabbard Offshore Winds Limited |
48X000000000331Y | 0000000000000000000009713_003 | Inactive | Unplanned | Production unavailability | 2024-12-08T01:02:32+00:00 | 2024-12-07T13:52:00+00:00 | 2024-12-07T23:59:00+00:00 | MW | 0 | 165 | 165 | Failure | Plant Fault - Electrical Equipment |
Wind Offshore | 10YGB----------A |