Affected Unit | Affected Unit EIC Code | Market Participant | Market Participant Code | Message ID | Event Status | Type Of Unavailability | Type Of Event | Publication Date | Event Start | Event Stop | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Reason Of Unavailability | Remarks | Fuel Type | Bidding Zone |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
< 1 2 3 4 5 > | ||||||||||||||||||
T_SGRWO-1 | 48W00000SGRWO-1L | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008632_002 | Dismissed | Planned | Production unavailability | 2023-12-02T16:41:25+00:00 | 2023-12-04T09:01:00+00:00 | 2023-12-05T15:00:00+00:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008652_003 | Inactive | Unplanned | Production unavailability | 2023-12-01T09:17:32+00:00 | 2023-12-01T06:24:00+00:00 | 2023-12-01T08:12:00+00:00 | MW | 0 | 52 | 52 | Failure | Plant Fault - Control System |
Fossil Gas | 10Y1001A1001A59C |
RHODE1 | 47W000000000212Y | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008652_002 | Dismissed | Unplanned | Production unavailability | 2023-12-01T08:08:54+00:00 | 2023-12-01T06:24:00+00:00 | 2023-12-01T08:12:00+00:00 | MW | 0 | 52 | 52 | Failure | Plant Fault - Control System |
Fossil Gas | 10Y1001A1001A59C |
T_BEATO-2 | 48W00000BEATO-2R | Beatrice Offshore Windfarm Limited (BOWL) |
48X000000000208X | 0000000000000000000008568_001 | Dismissed | Planned | Production unavailability | 2023-11-20T00:00:11+00:00 | 2023-11-23T07:00:00+00:00 | 2023-11-23T10:00:00+00:00 | MW | 0 | 126 | 126 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008563_003 | Inactive | Unplanned | Production unavailability | 2023-11-20T12:02:32+00:00 | 2023-11-18T20:58:00+00:00 | 2023-11-20T11:00:00+00:00 | MW | 0 | 52 | 52 | Failure | Plant Fault - Auxiliary Equipment |
Fossil Gas | 10Y1001A1001A59C |
RHODE2 | 47W000000000213W | SSE Generation Ireland Ltd |
47X0000000000592 | 0000000000000000000008563_002 | Dismissed | Unplanned | Production unavailability | 2023-11-20T10:50:57+00:00 | 2023-11-18T20:58:00+00:00 | 2023-11-20T11:00:00+00:00 | MW | 0 | 52 | 52 | Failure | Plant Fault - Auxiliary Equipment |
Fossil Gas | 10Y1001A1001A59C |
T_KEAD-2 | 48W000000KEAD-23 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000006466_010 | Dismissed | Planned | Production unavailability | 2022-12-22T12:22:51+00:00 | 2023-08-08T00:01:00+01:00 | 2023-11-21T23:59:00+00:00 | MW | 0 | 893 | 893 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008535_003 | Inactive | Planned | Consumption unavailability | 2023-11-09T17:02:32+00:00 | 2023-11-09T05:00:00+00:00 | 2023-11-09T16:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008535_002 | Dismissed | Planned | Consumption unavailability | 2023-11-09T09:24:08+00:00 | 2023-11-09T05:00:00+00:00 | 2023-11-09T16:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008535_001 | Dismissed | Planned | Consumption unavailability | 2023-11-09T05:01:17+00:00 | 2023-11-09T05:00:00+00:00 | 2023-11-09T10:00:00+00:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_PEHE-1 | 48W000000PEHE-15 | SSE Thermal Generation (Scotland) Ltd |
48X0000000003024 | 0000000000000000000008501_001 | Dismissed | Planned | Production unavailability | 2023-10-17T09:36:57+01:00 | 2023-10-19T08:00:00+01:00 | 2023-10-20T17:00:00+01:00 | MW | 0 | 1180 | 1180 | Foreseen Maintenance | Planned Outage |
Fossil Gas | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008453_001 | Dismissed | Planned | Consumption unavailability | 2023-09-28T17:50:33+01:00 | 2023-09-28T18:45:00+01:00 | 2023-09-29T08:00:00+01:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008409_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:37:19+01:00 | 2023-09-14T17:31:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:35+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:23+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 120 | 120 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008416_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:54:18+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 300 | 300 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008418_002 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:18+01:00 | 2023-08-31T07:01:00+01:00 | 2023-10-02T08:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008418_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:59:51+01:00 | 2023-08-31T07:01:00+01:00 | 2023-10-02T08:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:32:03+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 138 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:50:49+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 138 | 138 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008414_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:48:14+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 140 | 140 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_003 | Dismissed | Planned | Production unavailability | 2023-09-15T16:24:56+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_002 | Dismissed | Planned | Production unavailability | 2023-09-15T15:51:30+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 100 | 100 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008412_001 | Dismissed | Planned | Production unavailability | 2023-09-15T12:44:02+01:00 | 2023-09-29T12:01:00+01:00 | 2023-10-09T08:00:00+01:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-3 | 48W00000SGRWO-3H | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008368_004 | Dismissed | Planned | Production unavailability | 2023-09-05T11:52:43+01:00 | 2023-09-02T12:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 0 | 160 | 160 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008379_004 | Dismissed | Planned | Production unavailability | 2023-09-05T11:53:32+01:00 | 2023-09-03T04:00:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 0 | 300 | 300 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_SGRWO-4 | 48W00000SGRWO-4F | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008385_003 | Dismissed | Planned | Production unavailability | 2023-09-05T11:53:09+01:00 | 2023-09-02T12:01:00+01:00 | 2023-09-29T12:00:00+01:00 | MW | 0 | 140 | 140 | Shutdown | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008363_001 | Dismissed | Planned | Consumption unavailability | 2023-08-30T10:46:14+01:00 | 2023-09-01T13:00:00+01:00 | 2023-09-01T17:00:00+01:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008398_004 | Dismissed | Planned | Production unavailability | 2023-09-11T10:46:21+01:00 | 2023-09-11T09:32:00+01:00 | 2023-09-30T09:30:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008362_007 | Inactive | Planned | Production unavailability | 2023-09-01T21:02:32+01:00 | 2023-09-01T13:00:00+01:00 | 2023-09-01T20:00:00+01:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008362_006 | Dismissed | Planned | Production unavailability | 2023-09-01T19:44:55+01:00 | 2023-09-01T13:00:00+01:00 | 2023-09-01T20:00:00+01:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008362_005 | Dismissed | Planned | Production unavailability | 2023-09-01T19:42:53+01:00 | 2023-09-01T13:00:00+01:00 | 2023-09-01T19:46:00+01:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008362_004 | Dismissed | Planned | Production unavailability | 2023-09-01T18:03:38+01:00 | 2023-09-01T13:00:00+01:00 | 2023-09-01T20:00:00+01:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008362_003 | Dismissed | Planned | Production unavailability | 2023-09-01T17:00:37+01:00 | 2023-09-01T13:00:00+01:00 | 2023-09-01T19:00:00+01:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008362_002 | Dismissed | Planned | Production unavailability | 2023-09-01T16:04:26+01:00 | 2023-09-01T13:00:00+01:00 | 2023-09-01T18:00:00+01:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008362_001 | Dismissed | Planned | Production unavailability | 2023-08-30T10:45:09+01:00 | 2023-09-01T13:00:00+01:00 | 2023-09-01T17:00:00+01:00 | MW | 0 | 150 | 150 | Foreseen Maintenance | Testing |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008347_002 | Inactive | Planned | Production unavailability | 2023-09-01T00:02:31+01:00 | 2023-08-31T07:01:00+01:00 | 2023-08-31T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008347_001 | Dismissed | Planned | Production unavailability | 2023-08-25T19:43:05+01:00 | 2023-08-31T07:01:00+01:00 | 2023-08-31T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008345_002 | Inactive | Planned | Production unavailability | 2023-08-31T00:02:31+01:00 | 2023-08-30T07:01:00+01:00 | 2023-08-30T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008345_001 | Dismissed | Planned | Production unavailability | 2023-08-25T19:39:09+01:00 | 2023-08-30T07:01:00+01:00 | 2023-08-30T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008343_002 | Inactive | Planned | Production unavailability | 2023-08-30T00:02:32+01:00 | 2023-08-29T07:01:00+01:00 | 2023-08-29T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008343_001 | Dismissed | Planned | Production unavailability | 2023-08-25T19:12:59+01:00 | 2023-08-29T07:01:00+01:00 | 2023-08-29T23:00:00+01:00 | MW | 0 | 358 | 358 | Shutdown | Commissioning |
Wind Offshore | 10YGB----------A |
T_KEAD-1 | 48W000000KEAD-15 | KEADBY GEN. LTD |
48X000000000073U | 0000000000000000000008341_001 | Dismissed | Planned | Production unavailability | 2023-08-24T09:37:07+01:00 | 2023-08-26T23:59:00+01:00 | 2023-08-27T23:59:00+01:00 | MW | 0 | 755 | 755 | Foreseen Maintenance | Maintenance |
Fossil Gas | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008328_001 | Dismissed | Planned | Production unavailability | 2023-08-22T09:20:36+01:00 | 2023-08-23T08:01:00+01:00 | 2023-08-23T18:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Planned Outage |
Wind Offshore | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008230_002 | Inactive | Planned | Consumption unavailability | 2023-07-07T16:02:31+01:00 | 2023-07-07T08:00:00+01:00 | 2023-07-07T15:00:00+01:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_FOYE-1 | 48W000000FOYE-14 | SSE GENERATION |
48X000000000077M | 0000000000000000000008230_001 | Dismissed | Planned | Consumption unavailability | 2023-07-07T07:54:46+01:00 | 2023-07-07T08:00:00+01:00 | 2023-07-07T15:00:00+01:00 | MW | 0 | 150 | 150 | Shutdown | Water Management |
Hydro Pumped Storage | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008206_003 | Dismissed | Planned | Production unavailability | 2023-06-30T16:54:34+01:00 | 2023-06-26T12:01:00+01:00 | 2023-08-07T12:00:00+01:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008206_002 | Dismissed | Planned | Production unavailability | 2023-06-30T16:49:47+01:00 | 2023-06-26T12:01:00+01:00 | 2023-08-07T12:00:00+01:00 | MW | 0 | 160 | 160 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-5 | 48W00000SGRWO-5D | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008206_001 | Dismissed | Planned | Production unavailability | 2023-06-23T19:40:27+01:00 | 2023-06-26T12:01:00+01:00 | 2023-08-07T12:00:00+01:00 | MW | 0 | 80 | 80 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |
T_SGRWO-6 | 48W00000SGRWO-6B | Seagreen Wind Energy Ltd |
48X000000000263P | 0000000000000000000008145_003 | Dismissed | Planned | Production unavailability | 2023-06-30T16:44:39+01:00 | 2023-06-21T12:00:00+01:00 | 2023-07-07T12:00:00+01:00 | MW | 0 | 358 | 358 | Foreseen Maintenance | Commissioning |
Wind Offshore | 10YGB----------A |