Event Status Type Of Unavailability Type of Event
Fuel Type Affected Asset or Unit Affected Asset or Unit EIC Code
Affected Unit Affected Unit EIC Code Market Participant Market Participant Code Message ID Event Status Type Of Unavailability Type Of Event Publication Date Event Start Event Stop Unit of Measurement Unavailable Capacity Available Capacity Installed Capacity Reason Of Unavailability Remarks Fuel Type Bidding Zone
1 2 3 4 5 >
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009032_003 Active Planned Production unavailability 2024-04-23T16:35:44+01:00 2024-04-23T07:00:00+01:00 2024-04-23T20:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009032_002 Dismissed Planned Production unavailability 2024-04-22T15:53:43+01:00 2024-04-23T07:00:00+01:00 2024-04-23T23:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-3 48W00000BEATO-3P
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009032_001 Dismissed Planned Production unavailability 2024-04-19T10:20:06+01:00 2024-04-23T07:00:00+01:00 2024-04-23T21:00:00+01:00 MW 168 0 168 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009031_003 Active Planned Production unavailability 2024-04-23T16:34:45+01:00 2024-04-23T07:00:00+01:00 2024-04-23T20:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009031_002 Dismissed Planned Production unavailability 2024-04-22T15:53:04+01:00 2024-04-23T07:00:00+01:00 2024-04-23T23:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_BEATO-1 48W00000BEATO-1T
Beatrice Offshore Windfarm Limited (BOWL)
48X000000000208X 0000000000000000000009031_001 Dismissed Planned Production unavailability 2024-04-19T10:18:34+01:00 2024-04-23T07:00:00+01:00 2024-04-23T21:00:00+01:00 MW 126 0 126 Foreseen Maintenance
Maintenance
Wind Offshore 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000009042_003 Inactive Planned Production unavailability 2024-04-23T16:17:31+01:00 2024-04-23T10:00:00+01:00 2024-04-23T15:12:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000008978_003 Inactive Planned Production unavailability 2024-04-23T16:17:31+01:00 2024-04-23T09:00:00+01:00 2024-04-23T15:15:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000008978_002 Dismissed Planned Production unavailability 2024-04-23T15:14:49+01:00 2024-04-23T09:00:00+01:00 2024-04-23T15:15:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000009042_002 Dismissed Planned Production unavailability 2024-04-23T15:10:34+01:00 2024-04-23T10:00:00+01:00 2024-04-23T15:12:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000009042_001 Dismissed Planned Production unavailability 2024-04-23T08:20:23+01:00 2024-04-23T10:00:00+01:00 2024-04-23T16:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
T_GLNDO-1 48W00000GLNDO-1G
SSE GENERATION
48X000000000077M 0000000000000000000008978_001 Dismissed Planned Production unavailability 2024-03-29T10:09:43+00:00 2024-04-23T09:00:00+01:00 2024-04-23T16:00:00+01:00 MW 100 0 100 Foreseen Maintenance
Planned Outage
Hydro Water Reservoir 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000009043_001 Active Planned Production unavailability 2024-04-23T10:11:51+01:00 2024-04-23T09:00:00+01:00 2024-04-26T10:11:00+01:00 MW 103 54 157 Shutdown
Grid
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008961_006 Inactive Planned Production unavailability 2024-04-23T10:02:31+01:00 2024-04-11T08:30:00+01:00 2024-04-23T09:00:00+01:00 MW 105 52 157 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008961_005 Dismissed Planned Production unavailability 2024-04-19T13:09:27+01:00 2024-04-11T08:30:00+01:00 2024-04-23T09:00:00+01:00 MW 105 52 157 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008961_004 Dismissed Planned Production unavailability 2024-04-19T13:08:40+01:00 2024-04-11T08:30:00+01:00 2024-04-23T09:00:00+01:00 MW 157 0 157 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008961_003 Dismissed Planned Production unavailability 2024-04-18T09:44:35+01:00 2024-04-11T08:30:00+01:00 2024-04-23T09:00:00+01:00 MW 250 52 302 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008961_002 Dismissed Planned Production unavailability 2024-04-11T08:37:44+01:00 2024-04-11T08:30:00+01:00 2024-04-19T09:00:00+01:00 MW 250 52 302 Foreseen Maintenance
Grid
Wind Offshore 10YGB----------A
DBAWO-1 48W00000DBAWO-1J
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008961_001 Dismissed Planned Production unavailability 2024-03-27T11:39:35+00:00 2024-04-10T12:00:00+01:00 2024-04-26T12:00:00+01:00 MW 146 156 302 Foreseen Maintenance
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_034 Dismissed Planned Production unavailability 2024-04-19T13:07:03+01:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 0 0 0 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_033 Dismissed Planned Production unavailability 2024-04-19T13:04:31+01:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 0 0 0 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_032 Dismissed Planned Production unavailability 2024-04-19T13:03:21+01:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 0 138 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_031 Dismissed Planned Production unavailability 2024-04-19T13:02:21+01:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 0 0 0 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_030 Dismissed Planned Production unavailability 2024-03-22T08:16:23+00:00 2023-07-18T14:00:00+01:00 2024-11-11T10:00:00+00:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_029 Dismissed Planned Production unavailability 2024-03-22T07:35:55+00:00 2023-07-18T14:00:00+01:00 2024-11-11T09:00:00+00:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_028 Dismissed Planned Production unavailability 2024-03-22T07:33:55+00:00 2023-07-18T14:00:00+01:00 2025-01-08T09:00:00+00:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_027 Dismissed Planned Production unavailability 2024-03-19T12:11:06+00:00 2023-07-18T14:00:00+01:00 2024-10-11T09:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_026 Dismissed Planned Production unavailability 2024-02-21T13:57:18+00:00 2023-07-18T14:00:00+01:00 2024-10-07T09:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_025 Dismissed Planned Production unavailability 2024-01-10T12:56:50+00:00 2023-07-18T14:00:00+01:00 2024-09-14T09:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_024 Dismissed Planned Production unavailability 2023-11-07T13:10:23+00:00 2023-07-18T14:00:00+01:00 2024-08-17T00:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_023 Dismissed Planned Production unavailability 2023-09-28T14:43:55+01:00 2023-07-18T14:00:00+01:00 2024-07-24T00:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_022 Dismissed Planned Production unavailability 2023-09-28T14:30:35+01:00 2023-07-18T14:00:00+01:00 2023-09-29T19:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_021 Dismissed Planned Production unavailability 2023-09-27T15:22:28+01:00 2023-07-18T14:00:00+01:00 2023-09-28T19:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_020 Dismissed Planned Production unavailability 2023-09-26T15:41:35+01:00 2023-07-18T14:00:00+01:00 2023-09-27T19:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_019 Dismissed Planned Production unavailability 2023-09-25T17:40:25+01:00 2023-07-18T14:00:00+01:00 2023-09-27T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_018 Dismissed Planned Production unavailability 2023-09-23T12:49:34+01:00 2023-07-18T14:00:00+01:00 2023-09-26T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_017 Dismissed Planned Production unavailability 2023-09-22T17:39:07+01:00 2023-07-18T14:00:00+01:00 2023-09-23T19:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_016 Dismissed Planned Production unavailability 2023-09-19T18:29:26+01:00 2023-07-18T14:00:00+01:00 2023-09-23T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_015 Dismissed Planned Production unavailability 2023-09-18T17:40:03+01:00 2023-07-18T14:00:00+01:00 2023-09-20T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_014 Dismissed Planned Production unavailability 2023-09-17T18:17:56+01:00 2023-07-18T14:00:00+01:00 2023-09-19T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_013 Dismissed Planned Production unavailability 2023-09-14T21:25:51+01:00 2023-07-18T14:00:00+01:00 2023-09-18T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_012 Dismissed Planned Production unavailability 2023-09-12T08:42:35+01:00 2023-07-18T14:00:00+01:00 2023-09-15T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_011 Dismissed Planned Production unavailability 2023-09-05T17:39:29+01:00 2023-07-18T14:00:00+01:00 2023-09-13T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_010 Dismissed Planned Production unavailability 2023-08-30T16:04:51+01:00 2023-07-18T14:00:00+01:00 2023-09-06T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_009 Dismissed Planned Production unavailability 2023-08-25T10:10:26+01:00 2023-07-18T14:00:00+01:00 2023-08-31T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_008 Dismissed Planned Production unavailability 2023-08-22T11:17:03+01:00 2023-07-18T14:00:00+01:00 2023-08-28T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_007 Dismissed Planned Production unavailability 2023-08-18T09:14:39+01:00 2023-07-18T14:00:00+01:00 2023-08-23T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_006 Dismissed Planned Production unavailability 2023-08-14T14:36:20+01:00 2023-07-18T14:00:00+01:00 2023-08-20T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_005 Dismissed Planned Production unavailability 2023-08-09T17:28:26+01:00 2023-07-18T14:00:00+01:00 2023-08-15T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A
DBAWO-5 48W00000DBAWO-5B
Doggerbank Offshore Wind Farm Project 1 Projco Limited
48X0000000003113 0000000000000000000008256_004 Dismissed Planned Production unavailability 2023-08-04T15:44:28+01:00 2023-07-18T14:00:00+01:00 2023-08-11T07:00:00+01:00 MW 138 0 138 Shutdown
Planned Outage
Wind Offshore 10YGB----------A